Country |
Client/Finance |
Project |
Services |
Period |
|
Argentina |
Private Companies |
Patagonia New Fishery Complex
|
Pre-FS |
1978-1979 |
|
Bolivia |
JICA |
Power Supply by Renewable Energy
Study for rural electrical supply by renewable energy. |
MP, FS |
1999-2001 |
|
Bolivia |
JICA |
Improvement of Agricultural Products Marketing System in Santa Cruz
Feasibility study on the development of agricultural products marketing
system and products collection and shipping system. |
FS |
1998 |
|
Bolivia |
JICA |
Santa Barbara - Bella Vista Highway Rehabilitation and Improvement
Rehabilitation and improvement of national arterial highway between
Santa Barbara and Bella Vista.
Total highway length: 118 km |
FS |
1989-1991 |
|
Bolivia |
JICA |
Chapare Zone Land Use Study
|
S |
1980 |
|
Brazil |
JICA |
Study for Improving Rural People's Livelihoods through Agricultural
Activities and Sound Natural Resources Management in the State of Amazonas
Formulation of a plan for income generation and provision of employment
opportunity through creating agricultural system under rational natural
resource use, which will contribute natural environment conservation. |
MP, FS |
2000-2001 |
| Brazil |
Confidential |
Expert Witness in Marine
Fouling Case Examination of underwater
photographs of fouled vessel and identify the species of barnacle present;
Examination of other documents related to the case including divers’
inspection report, vessel voyage log, correspondence between lawyers, etc;
Provision of Expert Opinion and Report on likelihood of barnacles having
settled on the hull of the vessel and grown to the size claimed by the
owners, during a lay-up period off the port of Sepetiba in Brazil;
Review and provision of a written opinion on reports produced by the Expert
engaged by the vessel owners, from the British Museum (Natural History). |
EW |
2001 |
|
Brazil |
JETRO |
Rural Electrification Project with Photovoltaic Technology
Feasibility Study for Rural Electrification using Photovoltaic
Technology in Northern 3 states.
Total number of non-electrified communities in the 3 states: 27,968 |
FS |
2000-2001 |
|
Brazil |
JICA |
Integrated Water Resources Development in Parana Province
Formulation of master plan for the utilization of water resources for
urban, agricultural, industrial, and hydropower development and
environment conservation in the State of Parana which includes 11 rivers
and coastal basin with target year of 2015. |
MP |
1994-1996 |
|
Brazil |
JICA |
Salto Pilao Hydroelectric Power Development
Hydroelectric power development program on the middle reach of Itajai
River.
Maximum discharge: 71.9 m3/sec
Installed capacity: 113.6 MW (56.8 MW x 2)
Energy output: 654.2 GWh/year |
FS |
1993-1994 |
|
Brazil |
JICA |
Itajai River Basin Hydropower Potential Study
Basinwide hydropower project inventory survey, project screenings and
formulation of a master plan.
Pre-feasibility study for three top ranking schemes selected in the master
plan study. |
MP |
1990-1991 |
|
Brazil |
JICA |
Cubatao Municipal Area Disaster Prevention
Debris flow and flood prevention and afforestation for environmental
conservation on mountain slopes to protect Cubatao city and industrial
zone located nearby Sao Paulo. |
MP, FS |
1989-1991 |
|
Brazil |
JICA |
Itajai River Basin Flood Control
Blumenau-Gaspar river section (river stretch improvement 32 km,
affected population 160,000) and Lower Itajai river stretch (new floodway
construction 10 km, river improvement main stream 20 km, affected
population 100,000). |
MP
FS |
1986-1990
1988-1990 |
|
Brazil |
JICA |
Cassava Alcohol Production
|
S |
1978 |
|
Brazil |
JICA |
Export Corridor Development
|
S |
1972 |
|
Chile |
JICA |
Construction of New Bio-Bio Bridge
Confirmation for feasibility of the bridge replacement and its design
to be constructed over the Bio-Bio river in Conception City. |
FS |
1992-1994 |
|
Chile |
JICA |
Rehabilitation and Conservation Program of Bridges
Preparation of a rehabilitation and maintenance program for 240 bridges
on the Pan American Highway and connecting arterial highways, including
establishment of bridge maintenance database and recommendations on bridge
inspection and maintenance. |
FS |
1991-1993 |
|
Chile |
JICA
Government/Grant |
Puerto Montt Fishery Complex
Construction of fishing port complex in the Los Lagos Region
Fish catch landing: 41 tons/day
Fishery boat call: 187 boats/day
Facilities: PC floating jetty, 10 m x 75 m x 3 m, control and terminal
building 2,900 m2, other buildings 630 m2 |
FS
DD, CS |
1986
1987-1989 |
|
Chile |
JICA |
Tololo Pampa Groundwater Agricultural Development
Study on development potentials of land and ground water resources, and
formulation of combined plan for groundwater exploitation and irrigation
development in the semi-arid area of the Tololo Pampa (33,000 ha).
Exploitable groundwater resources: 49.2 million m3
Irrigation development area: 8,400 ha |
FS |
1987-1988 |
|
Chile |
JICA |
Cerro Colorado Regional Development
|
S |
1977-1978 |
|
Chile |
JICA |
Baker and Pascua River Basins Hydropower Development
|
MP |
1976 |
|
Colombia |
JICA |
Slope Area Small Scale Irrigation
Feasibility study on small scale irrigation scheme covering 4 slope
areas of 300 ha in total. |
FS |
1985-1987 |
|
Costa Rica |
Private Company |
Boruca Hydroelectric Project
Review of feasibility study for the development of hydroelectric power
and transmission line. |
S |
1993-1994 |
|
Costa Rica |
Government/IDB |
Moin and Caldera Industrial Parks and Free Zones Establishment
Feasibility study for the construction of free-trading port and two
light industrial parks.
Moin area: Industrial park 20.5 ha, free zone 10.0 ha
Caldera area: Industrial park 22.9 ha, free zone 12.3 ha |
FS |
1980-1981 |
|
Cuba |
JICA |
Remediation of Oil Contaminated Sediment in Havana Bay
Havana Bay in Cuba is one of the most polluted bays in the world, and
its clean up, in particular removal and treatment of oil-contaminated
sediment, has a high priority. In this project, the extent of pollution
will be identified, and various approaches to clean up Havana Bay will be
explored. Capacity development is one of the prime goals of the Study, and
the expert will work closely with Cuban environmental experts to develop
effective remediation technologies. |
S |
2001-2002 |
|
Dominica |
JICA |
Marigott Fishery Port Improvement Project
Basic Design for the Construction of fishery facility and procurement
of equipments to improve the facility of fish caught. |
BD |
1999-2000 |
|
Dominican Republic |
JICA |
The Study on the Improvement of Sewerage System and Environment in the
City of Santiago
Master Plan for development of sewerage system, Feasibility Study on
Priority projects to improve the sanitary environmental conditions in the
city of Santiago and neighboring two municipalities (Licey and Tamboril)
and to protect water pollution in the Yaque del Norte River. |
MP, FS |
2001-2002 |
|
Dominican Republic |
JICA |
Integrated Rural Development Project of Yaque del Sur River Basin
Formulation of master plan and feasibility study on Multi Basin
Development including rehabilitation of irrigation facilities and
reinforcement plan of farmers' cooperation.
Study area: 65,000 ha
Irrigation area: 33,000 ha |
MP, FS |
1997-1999 |
|
Dominican Republic |
JICA
Government/JBIC |
Yuna River Basin Hydropower
El Torito scheme: Run-of-river type, rated head 229.2 m, 7,200 kW, 32.1
GWh/year, T/L 69 kV 8 km
Los Veganos scheme: Run-of-river type, rated head 134 m, 7,700 kW, 35.4
GWh/year, T/L 69 kV 4 km |
FS
DD, CS |
1982-1984
1985-1987 |
|
Dominican Republic |
Government |
Countrywide Power Development
|
S |
1976 |
|
Ecuador |
JICA
Government/JBIC |
Catarama Area Agricultural Development
Development of irrigation and drainage facilities in the Catarama River
basin.
Irrigation: 5,800 ha, main irrigation canals 21 km, secondary irrigation
canals 51 km, and drainage canals 76 km |
FS
DD, CS |
1981-1982
1990-2002 |
|
Ecuador |
JICA |
Port Guayaquil Development
Master planning and feasibility study in the new development area
including soil investigation, topo/bathymetric survey and environmental
investigation for the development of the biggest and most active port in
Ecuador. |
MP, FS |
1994-1995 |
|
Ecuador |
JICA |
Chone-Portoviejo River Basin Water Resources Development
Multi-basin integrated water resources development to meet projected
water demand in and around Portoviejo City.
Study area: 4,400 km2
The study aims for the provision of additional water supply of 2,200 x 106
m3/year for the new water supply treatment plant. |
FS
DD |
1991-1993
1993-1995 |
|
Ecuador |
JICA |
Small Fishery Port Development in Manabi Province
Regional fishing port development in view of coastal fisheries and
fishing village development.
Feasibility study for priority schemes. |
MP |
1990-1992 |
|
Ecuador |
JICA |
Esmeraldas Export Processing Zone Development
Establishment of export processing zone with main focus on promotion of
Ecuador's export-oriented and value-added industries. |
FS |
1991 |
|
Ecuador |
JICA |
Manabi State Comprehensive Water Resources Development
Stagewise comprehensive water resources development to year 2010
involving irrigation, domestic water supply, shrimp farming, flood control
and drainage improvement, watershed management and salinity intrusion
control.
Study area: Entire Manabi State 19,000 km2 |
MP |
1988-1990 |
|
El Salvador |
Government/JBIC |
Reconstruction of Major Transportation Infrastructure
Improvement of Pan-American Highway (CA-1) and Coastal Highway (CA-2).
Package I: San Marcos Lempa Bridge and Cuscatlan Bridge 466 m in total
Package II: San Martin ~ San Rafael Cedros 21.7 km
Package III: North Trunk Highway ~ Tonacatepaque 3.8 km |
DD, CS |
1995-2003 |
| El
Salvador |
JICA |
Detailed Design of Port
Reactivation Project in La Union Province: Environmental Study
Planning and supervision of marine environmental surveys
throughout the project site;
Review of Environmental Permit, granted by the El Salvador Ministry of
Environment and Natural Resources;
Identification of the requirements of the Environmental Mitigation and
Monitoring Measures specified in the Permit;
Derivation of mechanism for incorporating mitigation measures in the port
design;
Preparation of Environmental Management Plan describing the Mitigation
Measures and Environmental Permit Conditions, the manner in which they will
be achieved and the Environmental Monitoring that will be conducted to
ensure that mitigation is effective in reducing the impacts of the
development. |
S, EMP |
2001-2 |
|
El Salvador |
JICA
Government/Grant |
Rehabilitation of the Bridges along the Main Trunk Roads
Basic Design for the rehabilitation of the following bridges that were
damaged by hurricane "Mitch".
La Perla bridge (70 m)
Hiboa bridge (146 m)
Tiuapa bridge (113 m) |
BD
DD, CS |
1999-2000
2000-2002 |
|
El Salvador |
JICA |
Study for Port Reactivation in La Union Province
Formulation of master plan and feasibility study for the port
reactivation in La Union Province including development of new container
terminal. |
MP, FS |
1997-1998 |
|
El Salvador |
JICA
Government/Grant |
Rehabilitation of Bridges along the Litoral Highways in Eastern Region
Construction of new Torola Bridge (on CA-7, L=75 m, W=79 m) and new Don
Luis de Moscoso Bridge (on CA-1, L=140 m, W=7.9 m) for rehabilitation of
national infrastructure. |
MP
DD, CS |
1993-1994
1994-1997 |
|
El Salvador |
JICA
Government/Grant |
Rehabilitation of Bridges along the Litoral Highway
Preparation of basic designs, detailed design and construction
supervision for the construction of five medium scale bridges along the
Litoral Highway (CA2). |
BD
DD, CS |
1992-1993
1993-1995 |
|
El Salvador |
Government |
Railway Improvement
|
S |
1966 |
|
Guatemala |
JICA |
Sustainable Rural Development for the Reduction of Poverty in the
Central Highland Region
To conduct the master plan study aiming primarily at reduction of
poverty in rural areas of the Central Highland Region through the
integrated approach of: (1) increase of income by agriculture promotion
and rural house-hold industry development; (2) improvement of living
conditions such as health service, sanitation and water supply; and (3)
conservation and effective use of natural resources by collection and
analyzing existing data and information, conducting field surveys and
research in the model areas. |
MP |
1999-2001 |
|
Guatemala |
JICA |
Aurora International Airport and Santa Elena Regional Airport
Modernization and Expansion
Improvement of the existing two international airports by
reconstructing terminal buildings and airport and aviation support
facilities. |
MP, FS |
1988-1990 |
|
Guyana |
JICA |
Coastal Area Power Development
Preliminary investigation for power development in the regions on the
Atlantic Coast. |
S |
1989 |
|
Guyana |
JICA |
Garden of Eden
5,700 kW x 4 nos.
2,000 kW x 3 nos.
1,000 kW x 1 no. |
S |
1988 |
|
Honduras |
JICA
Government/Grant |
Rural Water Supply in the Health Region No. 2, Phase I & II
Groundwater development and improvement of rural water supply system in
West part of Honduras. Conducted procurement of equipment and materials
for the construction of 200 tube wells and construction supervision of 30
well including technical assistance. |
BD
DD, CS |
1993
1993-1995 |
|
Honduras |
JICA |
Rehabilitation of Puerto Cortez
Master plan (target 2010) and feasibility study (target year 2000) for
the rehabilitation of the Puerto Cortez. |
MP, FS |
1993-1994 |
|
Honduras |
Government |
Nationwide Road Improvement
Operation, maintenance and training for heavy equipments to be utilized
for nationwide arterial roads rehabilitation and maintenance. |
CS |
1989-1992 |
|
Honduras |
JICA
Government/Grant |
Comayagua Province Groundwater Development
Two-staged groundwater development and community water supply.
Water supply: 1st stage 2,590 m3/day for 51,800 people, 2nd
stage 4,529 m3/day for 56,500 people |
FS
DD, CS |
1988-1989
1990-1992 |
|
Honduras |
JICA
Government/JBIC
JBIC |
Choluteca River Basin Agricultural Development
Dam: Gravity, 93.5 m high, 217 m long, 210,000 m3 volume
Irrigation: Net area 20,600 ha, main canals 28.3 km
Environmental impact analysis and institutional development for irrigation
development of 24,000 ha for SAPROF |
FS
DD
SAPROF |
1977-1984
1985-1988
1992 |
|
Honduras |
Government/IDA |
Lower Choluteca River Basin Inundation Protection
Flood diversion, river channel improvement and irrigation by flood
diversion (3,000 ha).
Groundwater irrigation: 1,400 ha, 27 wells
Basic design of pilot farm: 42 ha |
S |
1979-1980 |
|
Honduras |
Private Company |
New Tegucigalpa International Airport
Runway: 2,800 m x 45 m, taxiway, apron and related facilities |
S |
1977-1979 |
|
Honduras |
Government/Private Company |
Sasayap Navigation
|
S |
1965-1966 |
|
Jamaica |
JBIC |
Kingston Metropolitan Area Water Supply
Supplemental study for water resources development at Rio Cobre River
basin, installation and expansion of water supply equipments, and
rehabilitation of existing wells and irrigation facilities. |
SAPROF
SAPI |
1993-1996
1999-2000 |
|
Jamaica |
Private Company/JBIC |
Greater Montego Bay Water Supply
Technical Assistance in detailed design and construction supervision
for improvement and extension of existing water supply system. |
DD, CS |
1989-1992 |
|
Jamaica |
JICA |
Rio Cobre Irrigation System Modernization and Expansion
Modernization and expansion of the present irrigation system and
introduction of diversified cropping patterns into the annual crop
rotation.
Irrigation: 12,680 ha |
FS |
1986-1987 |
|
Jamaica |
JICA |
Black River and Lower Morass Agricultural Development
Improved irrigation farming for stable and incremental food production
for self -sustenance.
Irrigation: Pumping irrigation 12,000 ha |
FS |
1984-1985 |
|
Mexico |
JICA |
Harisco Coastal Area Agricultural Development
Pre-feasibility study for the coastal area agricultural development.
Location: the east coastal area in Harisco (12,000 km2) |
S |
1994 |
|
Mexico |
JICA |
Mazatepec Hydropower Station Rehabilitation
Countermeasure study for restoration of the capacity/output of power
plant by preventing sediment accumulation in the reservoir and
rehabilitating of damaged hydraulic equipment. |
FS |
1992-1993 |
|
Mexico |
JICA |
Pacific Coast Port Improvement
Systematic development of container ports on the Pacific coast (six
ports).
Project target year: 2005 |
MP, FS |
1989-1990 |
|
Nicaragua |
JICA
Government/Grant |
Bridge Reconstruction Project along Highway between Nejapa - Izapa
Construction of 4 bridges (San Lorenzo: 50 m, Fatima: 50 m, Rio Seco:
30 m, El Tamarindo: 70 m) along the Pan American Highway in Nicaragua. |
BD
DD, CS |
1993
1994-1996 |
|
Nicaragua |
JICA |
Road Network Development
Preparation of arterial road network development plan (3,000 km long,
target year 2010) and feasibility study for the selected highways (200
km). |
MP, FS |
1993-1994 |
|
Panama |
JICA |
Project Formulation Study for the Fortification of Plan Panama (PPP)
and Support of Information Technology Infrastructure
Study on the current status of info-communications access with special
emphasis on the infrastructure and service conditions, and identification
of problems in the existing info-communications access and environment and
IT infrastructure to formulate future technical assistance programs in IT
sectors. |
S |
2002 |
|
Panama |
JICA |
Study on Solid Waste Management Plan for Municipality of Panama in the
Republic of Panama
The objective of the study was to design and formulate a Master Plan
project for solid waste management for Municipality of Panama. The project
also includes a feasibility study on priority project which will be
selected from the M/P. Development of effective environmental management
institution was one of the key issues addressed in the Study. |
S |
2001 |
|
Panama |
Government/Gov. of Panama, U.S.A., and Japan |
Panama Canal Alternative Study
Study on the alternatives to the existing Panama canal in view of
increasing traffic volume and timeworn existing canal. |
S
FS |
1991-1992
1991-1993 |
|
Panama |
JICA |
Panama Canal Improvement Project
Urgent improvement plan and long-term development study of the 2nd
canal construction, sea-level canal plan has been proposed instead of
lock-canal system.
Jetty: 60-150,000 DWT lock-gate system
Civil Works: Navigation channel, Communication system |
MP |
1990 |
|
Panama |
JICA |
Calaca Coal Thermal Plant Development
Preparation of scope of works for consulting services
Power: 350,000 kW x 1 |
S |
1985-1986 |
|
Paraguay |
Private Company |
Stroessnel Airport Development
|
S |
1979 |
|
Peru |
Government/JBIC |
Sierra-Natural Resources Management and Poverty Alleviation
This project will cover approximately 150 small basins in mountainous
regions above 2,000 m (Sierra) and target approximately 900 farming
communities. It aims to raise agricultural production, alleviate poverty
and conserve the environment in those areas. |
PM |
2000-2005 |
|
Peru |
Government/JBIC |
Provincial Cities (Piura & Chimbote) Water Supply and Sewerage
System Improvement and Expansion
1. Piura City Water supply improvement (construction of new water
treatment facilities, improvement and expansion of the service pipeline
network, and construction of new service reservoirs, improvement and
expansion of the water distribution network, and installation of domestic
water meters). Sewerage improvement (improvement and expansion of sewage
treatment plants, improvement and expansion of the sewage pipeline
network, improvement and expansion of pumping stations)
2. Chimbote City Water supply improvement (improvement and expansion of
water treatment plant, improvement and expansion of reservoir, improvement
and expansion of service reservoirs, improvement and expansion of water
distribution network, and installation of domestic water meters).Sewerage
improvement (improvement and expansion of sewage treatment plants,
improvement and expansion of the sewage pipeline network). |
DD, CS |
2000-2003 |
|
Peru |
Government/JBIC |
Rural Highway Rehabilitation and Improvement Project II
Rehabilitation and improvement of road network between inland areas and
coastal zones in Southern and Northern parts of the country.
Northern Trunk Line: Chichayo-Chongoyape 60km
Southern Trunk Line: Abancay-Chalhuanca 118km
Northern Rural Road: Chongoyape-Cajamarca 244km |
DD, CS |
2000-2002 |
|
Peru |
Government/JBIC |
El Nino Affected Highway Rehabilitation Project
Rehabilitation, Improvement and/or Construction works of highways which
were affected of El Nino phenomenon between the months of August 1997 and
June 1998.
Rehabilitation of paved highways
- Heoes de la Bren Highway 134km
- La Oroya-Huancayo Highway 123km
- Cruce Olmos-Corral Quemado Highway 56km
- Huaura-Sayan-Churi Highway 45km
- Lima-Canta Highway 72km
Improvement of Unpaved Highways
- Chamaya-Jaen-San Ignacio Highway 50km
- Huaura-Sayan-Churin Highway 61km
- Jauja-Tarma Hig76hway 56km
Construction of Bridges
Collana Bridge at the Heoes de la Brena Highway 150m. span
Stuart Bridge at the La Oroya-Huancayo Highway 100m. |
PM |
2000-2002 |
|
Peru |
JICA |
Canete River Basin Water Resources Development
Formulation of an integrated master plan for water resources
development in the Canete River Basin, covering water supply to Lima as
well as irrigation and hydropower development. Feasibility studies on
priority projects selected in the master plan. |
MP, FS |
1999-2000 |
|
Peru |
JICA
Government/Grant |
Underground Water Development in Vizcachas Plateau
Underground water supply from the plateau in the Andes to Lake Aricota
aimed at maintaining the water level of the Lake, increasing power
generation and securing water supply for agricultural and domestic use.
substations: 66/33 kV, 33/10 kV
Transmission line: 33 kV/60 km, 10 kV/11 km |
BD
DD |
1998
1999-2000 |
|
Peru |
Private Company/
Government |
Marca II Water Transmission Project
Assistance in preparation of tender document for the construction of
water transmission tunnel (10 km) and open channels (42 m in total). |
DD |
1998 |
|
Peru |
JBIC |
Callao Port Development Project
Updating of JICA's feasibility study, preparation of the Implementation
Program, terms of reference for design and supervision services.
Dredging volume: 2,400,000 m3
Reclamation volume: 1,750,000 m3
Container wharf: 350 m, -14 m depth
Grain wharf: 270 m, -14 m depth |
SAPROF |
1994 |
|
Peru |
JICA |
Rimac River Basin Disaster Prevention
Study on preventative measures against flood and debris flow/slope
failure in Lima Region.
Study area: 3,200 km2, river length: 130 km, average river bed
slope: 1/30, annual mean rainfall: 400 mm/year, design flood discharge:
660 m3/sec., flood affected population: 1.8 million |
MP |
1987-1988 |
|
Peru |
JICA |
Cajamarca Mine-Related Infrastructural Development
|
S |
1976 |
|
Trinidad and Tobago |
JICA |
Water Supply Supervisory System Improvement
Establishment of most suitable water supply supervisory system (1992 -
2005) for Water and Sewerage Authority, and improvement and expansion of
the existing central water super. |
MP, FS |
1989-1991 |
|
Venezuela |
JICA |
Apure River Basin Improvement
Comprehensive and stagewise river improvement and river channel
stabilization for inland navigation.
Study area: 30,000 km2 |
FS |
1992-1993 |
|
Venezuela |
Private Company |
Wood Chip Export Terminal Project
Construction of wood chip loading berth and storage terminal at the
Orinoco River, (the 2nd largest river in South America), capable of
loading 300,000 BDT (600,000 m3) of chip per year.
Jetty: 40,000 DWT x 1, Cargo Equip |
Pre-FS |
1991 |
|
Venezuela |
JICA |
Chama River Basin Conservation
Basin-wide flood and debris flow control in Chama river basin.
Study area: 3,785 km2, river channel length: 175 km
Preparation of an action plan for urgent flood control |
MP |
1988-1990 |