List of NK Experience in Asia (East)
|
Country |
Client/Finance |
Project |
Services |
Period |
|
China |
WB |
Third Inland Waterway Project
Review of technical specifications of bidding documents for
construction of dam/ship lock, and procurement of equipment for turbines
and generators. |
DD |
2002 |
|
China |
JBIC |
Follow-up Study for Haikou and Hangzhou Airport
Investigation on environmental and financial management of the two
airports and a survey on procurement procedures. |
S |
2001-2002 |
|
China |
Government |
Project of Water Transfer of Dafuofang Reservoir
Preliminary design to confirm technical viability of construction
method by Tunnel Boring Machines (TBM), preparation of bid documents for
design, manufacturing and delivery of TBM.
Tunnel: 85.3 km |
D |
2001 |
|
China |
JICA |
Study on Basic Design for the Establishment of Environmental
Information Network
Establishment of networks to communicate and share environmental
information gathered at the urban level, including installation of
following equipment.
- Local Area Network (LAN) Equipment (61 cities)
- System Software and Environmental Application Software (61 cities)
- Satelite Telecommunication Equipment (81 cities) |
BD, DD, CS |
2000-2001 |
|
China |
JICA
Government/JBIC |
Baishi Multipurpose Dam Project
Hydraulic model test for and supervision of the construction of an RCD
dam and reservoir aimed at flood control, irrigation water supply,
municipal and industrial water supply, power generation, fish culture, and
crab farming in Liaoning Province.
Dam type: Concrete gravity type, High: 50.3 m |
MP, FS
CS |
1996-1997
1997-2001 |
|
China |
JBIC |
Sustainable Technical Assistance for Fuzhou and Shenzhen International
Airport
Investigation of economical and environmental impact of the project
including procurement and private management issues. |
S |
2000 |
|
China |
JBIC |
Construction of Longdong Dam in Sanjiang Pingyuan in Heilongjian
Province
|
SAPI |
2000 |
|
China |
Government/JBIC |
High Category Operation System for Shanghai Pudong International
Airport Project
Formulation of the Instrument Landing System (ILS) operation manuals
for the basic CAT-III and suggestion the necessary technical requirements,
specifications and drawings resulting from the technical review. |
BD |
1999-2000 |
|
China |
JBIC |
Technical Assistance for the Guangzhou Baiyun International Airport
Relocation Project
Review of existing feasibility study and assessment of economical and
environmental impact.
Taxiway: length 3,800 m, 3,600 m, width 45 m. |
S |
1999-2000 |
|
China |
JICA |
Water Resource Development in Shenfu-Dong Sheng Mining Area
Study on water resource development for coal mining
Design of an integrated water use plan covering surface water use and
wastewater re-use plans and feasibility study on the construction of dam,
wastewater treatment/re-use facilities from technical, economic and
environmental points of view. |
MP, FS |
1997-2000 |
|
China |
JICA |
Dalian Environmental Improvement Model Zone Management Project
Integrated environmental management study including water & air
pollution control and institutional development in Dalian environmental
Model Zone (217.24 km2). |
MP, FS |
1996-2000 |
|
China |
JICA
Government/JBIC |
Shanghai Pudong International Airport
Airport area 25 km2
Estimated air traffic demand in year 2015: 70 million/year
Estimated air cargo demand in yea 2015: 4.5 million t./year
Annual aircraft movements: 320,000 times
Runway: 4,000 m x 4 |
MP, FS
DD
OM |
1994-1996
1996-1997
1999-2000 |
|
China |
Government/JBIC |
Tianshengqiao-I Hydroelectric
Reservoir type
Dam: Concrete faced rockfill, Gross head 178 m, Crest Length 1,168 m,
V=18,800,000 m3
P/S: Aboveground, 1,200 MW
Reservoir:
- Catchment area (damsite): 50,139 km2
- Average annual discharge (damsite): 612 m3/sec.
- Design flood discharge (damsite): 28,500 m3/sec.
- Reservoir area: 176 km2
- Gross storage capacity: 10,257 x 106 m3
- Effective storage capacity: 5,800 x 106 m3
- Normal H.W.L: El. 780 m
Dam:
- Type: Concrete faced rockfill dam
- Height: 178 m
- Crest length: 1,168 m
- Embankment volume: 18.8 x 106 m3
Power Station:
- Type: Aboveground, run-of-river type
- Turbine: 300 MW x 4
- Installed capacity: 300 x 4
- Annual energy output: 5,200 GWh/year |
DD, CS |
1993-2000 |
|
China |
JBIC |
SAPROF for Changjiang River Basin Urban Flood Control Project
Special Assistance for Project Formation (SAPROF) for the construction
of flood control facilities for the bank area cities of the Changjiang
River.
Dike: expansion 531 km in total, reconstruction 59 km |
SAPROF |
1999 |
|
China |
JBIC |
SAPI for JBIC Financial Environmental Projects
Special assistance for implementing on-going environmental projects by
disseminating various loan procedures to the Chinese authorities and
improving their environment monitoring system. |
SAPI |
1998-1999 |
|
China |
JBIC |
Yellow River Delta Integrated Agricultural Development Project
Special Assistance for Project Formulation (SAPROF) for the project
which aims to increase agricultural production and to improve income gaps
between cities and farm villages in two regions of the north-eastern part
of Shandong Province, Xiazhen and Daluhu. |
S |
1998-1999 |
|
China |
JICA |
Taihang Shan Integrated Agricultural Development Project in Hebei
Province
Master plan study on integrated agricultural and rural development and
environmental and soil conservation project for target area of 31,000 km2
and feasibility study for selected model areas in 4 districts. |
MP, FS |
1998-1999 |
|
China |
JICA |
Integrated Management Plan for the Water Environment of Min River in
Chengdu District
Master plan study on the integrated management for the improvement and
restoration of the water environment of the Min River in Chengdu district,
and feasibility study on the selected projects.
Population: 9,600,000
M/I water supply: 2,400 million t/day |
MP, FS |
1996-1997 |
|
China |
IBRD/WB |
Shandong Environmental Project
Design review and advisory services for various schemes for
environmental improvement including wastewater treatment and district
heating system. |
DD |
1996-1997 |
|
China |
JBIC |
Heilongjiang Integrated Agricultural Development
Improvement of agricultural infrastructure in Heilongjiang. |
SAPROF |
1995-1996 |
|
China |
JICA |
Project Formulation Study on Future Assistance for Environmental
Management
Project finding and formulation study based on previous study on water
pollution and waste control. |
S |
1995-1996 |
|
China |
IBRD/WB |
Inland Waterway Project
Review of tender documents for construction of inland waterway, dam. |
DD |
1995 |
|
China |
JICA |
Heilongjiang Integrated Agricultural Development
Modernization and expansion of rural agricultural and fishery
production, and promotion of export oriented agro-processing industries in
Heilongjiang Province including feasibility study on the development of
selected state-operated farms.
Development area: 196,000 ha |
FS |
1993-1995 |
|
China |
JICA
Government/JBIC |
Guanyinge Multipurpose Dam
Catchment area: 2,795 km2
Dam: Concrete gravity, H=82 m, L=1,040 m, V=1,970,000 m3
Flood water retention: 748,000,000 m3
M/I water supply: 687,000,000 m3/year
Irrigation: 26,800 ha
Power: 19,500 kW |
FS
DD, CS |
1986-1988
1988-1995 |
|
China |
JICA |
Zhejiang Province Road Development
City road network development for short-, medium- and long terms in the
Zhejian Province. (Project target year: 2000, 2010, 2020 respectively)
with the context of the 8th Five-years National Development Plan. |
MP, FS |
1992-1994 |
|
China |
JBIC |
Qingdao Development Project
Integrated regional development in Qingdao.
1) Water SupplyMaximum water supply:
- 40,000m3/dayPipeline: 8,000mm dia. x 21,000 m, 1,000 mm dia.
x 13,000 m
- Pump: 7 nos. Transmission
- pipeline: 800~1,000 dia. x 92,030 m
2) Sewerage Maximum waste water treatment:
- 35,000 m3/day Storm sewer: 300~1,500 mm dia. x 15,705 m
- Sanitary sewer: x300 ~ 800 mm dia.x 6,800 m
- Pump: 7 nos.
3) Ferry Terminal
- Transport Demand:
・ Vehicles 210,000
・ Cargo 265,000 t
・ Passengers
4,460,000
- Multipurpose quay: 80 m
- Ferry quay: 80 m x 2 |
SAPROF |
1992-1993 |
|
China |
Private Company |
Dalian Industrial Estate Development
Project area: 217.0 ha
Road: 27.2 ha, Park: 3.0 ha, Utilities: 1.5 ha |
FS, DD, CS |
1991-1993 |
|
China |
JICA |
Liaohe Delta Comprehensive Agricultural Development
Modernization and expansion of regional agricultural and fishery
production, and promotion of export-oriented agro-processing industries in
Liaohe delta including feasibility study for Bai Shi Multipurpose Dam
Project (upstream scheme) and a model irrigation scheme. |
MP, FS |
1990-1993 |
|
China |
ADB |
North Hainan Water Resources Development
Multi-basin water resources appraisal and water demand projection (to
year 1995 and 2005). |
S |
1991-1992 |
|
China |
JICA |
Han Jiang River Basin Telemeterized Flood Forecasting and Warning
System
Establishment of a telemeterized flood forecasting and warning system
in the Middle and Lower Han Jiang basin.
Study area: 60,000 km2 |
FS |
1990-1992 |
|
China |
Private Company |
Reconnaissance Study for Shangdi Hi-Tech Park in Beijing
Field study for high-tech industrial development park in Haidian Ward
of Beijing City (171.5 ha).
Manufacturing industries (69.4 ha), residential complex (25.3 ha), roads
and parks (51.4 ha)
Planed day-time population: 28,000 |
S |
1991 |
|
China |
Government/JBIC |
Tianshengqiao Hydropower -Basuo Hydropower Station
Dam: Concrete gravity, H=58 m, V=26,000,000 m3
Power: Run-of-river, gross head 204 m
1st stage; 880,000 kW, 4,920 GWh/year
2nd stage; 880,000 kW, 8,200 GWh/year |
DD |
1985-1991 |
|
China |
Private Company |
Northeastern China East -West Crossing Superhighway
Superhighway networks in Beijing, Qinhuangdao, Jinzhou, Shenyang,
Dandong and Dalian. |
S |
1990 |
|
China |
JICA |
Xi'an City Domestic Waste Management
Establishment of municipal-wide waste management system up to year
2000.
Study area: 172 sq-km, projected population: 2 million, planned waste
disposal: 3,340 tons/day |
MP, FS |
1988-1990 |
|
China |
JICA |
Qingdao Municipal Area Export Processing Zone Development
Stagewise development of export processing zone.
Study area: 250 ha |
MP |
1988-1989 |
|
China |
JICA |
Dalian Port Development
New Dalian port area development, and the improvement of the existing
Dalian port area up to year 2000.
Commercial port expansion, including two container, berth expansion,
planned shipment of 15 million tons.
Jetty: 50,000 DWT x 2, 30,000 DWT x 2, 20,000 DWT x 4, 15,000 DWT x 2 |
MP, FS |
1987-1988 |
|
China |
JICA |
Shanghai-Nanjing Superhighway
Inter-urban superhighway: 4-6 lanes, 296 km |
FS |
1986-1987 |
|
China |
JICA |
Fei Lai Xia Multipurpose Dam
Catchment area: 34,097 km2
Dam: Rock-fill and concrete gravity combined, H=51.5 m, L=1,185 m,
embankment V=3,568,000 m3
Flood water retention: 1,495,000,000 m3
Inland navigation: 500-ton vessels/100 km
Power: 174 MW, 627 GWh/year |
FS |
1986-1987 |
|
China |
Japan China Economy and Trade Association |
Qingdao Municipal Area Export Industries Development
Physical and social infrastructures and utilities for export oriented
industries. |
S |
1986-1987 |
|
China |
JICA |
Tianjin Groundwater Development
Hydrogeological explorations for Huan Zhuang Wa Area (800 km2).
M/I water supply: 50 mil. m3/year |
FS |
1985-1987 |
|
China |
JICA |
New Qingdao Port Extension
Water supply to new port area
Pipeline: 26.6 km, 20,000 m3/day |
FS |
1984 |
|
China |
JICA |
Sanjiang Plain Agricultural Development
Development area: 46,000 ha, irrigation, mechanization |
S |
1983 |
|
Korea |
Nippon Export and Investment Insurance (NEXI) |
Environmental Evaluation Study on Seoul Beltway Project
Review of the existing EIA reports and evaluation of appropriateness of
environmental consideration of the Seoul Beltway Project to be implemented
by private finance.
Length: 36.3 km
Width: 37.8 km, 4 lanes
Bridges: 51
Tunnels: 5
Interchanges: 5
Toll gates: 2 (main route), 4 branch route |
S |
2001-2002 |
|
Korea |
Univ./Government |
Seoul-Inchon Navigation
Hydraulic Model Study for Inchon Lock. |
DD |
1997 |
|
Korea |
Dohwa Consulting Engineers/KOWACO |
Review of Flood Control Capability Improvement Project of Soyanggang
Dam
Review Dohwa's hydrological study and alternative schemes for flood
control capability improvement of the dam, and select an optimum scheme. |
Advisory |
1997 |
|
Korea |
Government |
Muju Pumped Storage Power Plant Development
Technical assistance for KOPEC
Power: 600 MW |
DD, CS |
1989-1995 |
|
Korea |
Government/JBIC |
Imha Multipurpose Dam
Dam: Rock-fill, H=73 m
Power: 50 MW, municipal, industrial and irrigation water supply, flood
control, Crest Length = 515 m, V=2,990,000 m3 |
DD
CS |
1983-1984
1988-1992 |
|
Korea |
Saman Engineering Consultants/Government
Government/JBIC |
Juam Multipurpose Dam
Type: rockfill, H=57 m, Crest length 330 m, V=4,470,000 m3,
Power: 22.5 MW, Irrigation: 130,000 m3/day, Water supply:
1,933,000 m3/day |
DD
CS |
1983-1985
1986-1991 |
|
Korea |
Yooshin Engineering |
Yongdam Multipurpose Dam Development Project
Feasibility Study which includes plan formulations and basic designs. |
FS |
1990 |
|
Korea |
JICA |
Han River System Small and Middle Rivers Environmental Conservation
River management and environmental conservation including improvement
of river structures. |
S |
1989 |
|
Korea |
Government/JBIC |
Hapcheon Multipurpose Dam
Dam: Concrete gravity, H=97 m, Crest Length 472 m
Power 100 MW, V=900,000 m3
Municipal, industrial and irrigation water supply: 599,000,000 m3/year
Flood control: 80,000,000 m3 |
FS, DD, CS |
1982-1989 |
|
Korea |
Government |
Jinan Hydropower
Advisory Services for pre-feasibility and feasibility studies of the
project. |
FS |
1986 |
|
Korea |
Government |
Samrangjin Pumped Storage Power Plant Development
Dams: Upper dam; Rock-fill, H=104 m, V=1,040,000 m3, Lower
dam; Rock-fill, H=62 m, V=1,822,000 m3
Power: Rated head 345 m - 288 m, 590 MW
T/L: 154 kV/7 km |
DD, CS |
1980-1986 |
|
Korea |
Government |
Imgye Multipurpose Dam
Dam: Concrete gravity, H=83 m, Crest Length 402 m
Power: 160 MW, municipal, industrial and irrigation water supply, flood
control |
DD |
1983-1984 |
|
Korea |
Government |
Hongcheon Multipurpose Dam
Dam: Concrete gravity, H=86 m, Crest Length 374 m,
V=3,100,000 m3
Power: 90 MW, municipal, industrial and irrigation water supply, flood
control |
DD |
1983-1984 |
|
Korea |
Government |
Hamyang Multipurpose Dam
Dam: Rock-fill, H=94 m, Crest Length 402 m
Power: 13 MW, municipal, industrial and irrigation water supply, flood
control |
DD |
1983-1984 |
|
Korea |
Government |
Kunsan Multipurpose Dam
Dam: Rock-fill, H=61 m
Power: 50 MW, irrigation, flood control |
DD |
1983-1984 |
|
Korea |
Government |
Myungcheon Multipurpose Dam
Dam: concrete gravity, H=61 m, Crest length 310 m, Power 50 MW |
DD |
1983-1984 |
|
Korea |
Government/JBIC, IBRD |
Chungju Multipurpose Dam
Dam: Concrete gravity, H=97.5 m, V=902,000 m3, Crest Length
447 m, Storage capacity: 2,280 x 106 m3, Catchment area: 6,648
km2, River basin: 26,200 km2
Municipal and industrial water supply: year 1986-2001; 2,015 mil. m3/year
Flood control: Rainfall gauging station: 20, Water level gauging station:
6, Warning station: 5, Repeating sta.: 3, Dam control station: 1
Power: 412 MW, 770 GWh/year
T/L: 154 kV/9 km |
FS, DD, CS |
1978-1983 |
|
Korea |
Government |
North Han River System Hydropower Stations Automatic Control System
(Seven Power Stations)
6 hydropower stations in the North Hang river system. |
FS, D |
1981-1982 |
|
Korea |
Government |
Chongpyong Pumped Storage Power Plant Development
Main Dam
Type: rockfill, H=62 m, L=290 m, V=935,000 m2
Saddle Dam
Type: rockfill, H=24 m, L=220 m, V=155,000 m3, Power: 440 MW |
FS, DD, CS |
1974-1980 |
|
Korea |
Government/JBIC |
Daecheong Multipurpose Dam
Dam: Concrete gravity and rock-fill combined, H=72 m, (concrete, V=
490,000 m3 volume and rock-fill 600,000 m3)
Power: 90 MW, T/L: 154 kV/24 km
Irrigation: 66,300 ha, water supply |
FS, DD, CS |
1972-1980 |
|
Korea |
JICA |
Long-Term Multipurpose Dam Development (Han, Nagdong, Seomjin and Geum
River Basins)
|
MP |
1977-1979 |
|
Korea |
Government/ADB |
Andong Multipurpose Dam
Dam: Rock-fill, H=83 m, V=430,000 m3
Power: 90 MW, water supply |
DD, CS |
1972-1976 |
|
Korea |
FAO/UNDP
ADB |
Nagdong River Basin Comprehensive Water Resources Development
|
MP
FS |
1968-1972
1976 |
|
Korea |
Government |
Soyang Gang Multipurpose Dam
Dam: Rock-fill, H=125 m, V=9,600,000 m3
Power: 200 MW
T/L: 154 kV/108 km, flood control, irrigation, water supply |
S, D, CS |
1962-1973 |
|
Korea |
Government |
Geum River Basin Development
|
MP |
1967-1972 |
|
Korea |
Government |
Nationwide Pumped Storage Power Plants Development
|
S |
1969-1970 |
|
Korea |
Government |
Nam Gang Multipurpose Dam
Type=rockfill, H=22 m, Crest Length=969 m, V=770,000 m3,
Power=10 MW |
S, D, CS |
1965-1970 |
|
Korea |
Government/ADB |
Seoul-Inchon Superhighway
Total highway length: 4-lane, 30 km |
DD, CS |
1968-1969 |
|
Korea |
Private Company/
Government |
Uiam Hydropower
Detailed design and technical assistance in construction supervision. |
DD, CS |
1963-1967 |
|
Korea |
Government |
Sayun Dam
Dam: Earth-and rock-fill combined, H=48 m, L=293 m, V=696,420 m3,
industrial water supply |
D, CS |
1963-1965 |
|
Korea |
Government |
Chunchon Hydropower
Dam: H= 40 m, V=210,000 m3, Crest Length=399 m, Power=57,6MW |
DD, CS |
1962-1965 |
|
Korea |
Government |
Sumjingang Hydropower
Dam: Gravity, H=14 m, Crest Length=341 m, V=400,000 m3,
Power=38,800 km2 |
D, CS |
1962-1965 |
|
Mongolia |
JICA
Government/Grant |
Rehabilitation of Power Plants in Sum Centers, Phase III
Rehabilitation of the generating facilities in 25 sum centers through
provision of new diesel engine generators.
66 kW 5 nos.
100 kW 15 nos. |
BD
DD, CS |
1999
1999-2000 |
|
Mongolia |
JICA
Government/Grant |
Rehabilitation of Power Plants of Sum Centers, Phase II
Installation of new diesel power generators for 45 sum centers of 12
Aimags.
60 kW 48 nos.
100 kW 74 nos. |
BD
DD, CS |
1998
1998-2000 |
|
Mongolia |
JICA |
Rural Power Supply by Renewable Energy
Master plan study on electric power supply to the off-grid
"sum" centers with alternatives of solar power, wind power,
diesel power and hybrid systems. The study includes installation,
operation and maintenance of renewable energy pilot power plants. |
MP |
1998-2000 |
|
Mongolia |
JICA |
National Tourism Development
Formulation of a national tourism master plan with the target year 2015
and of tourism development plans for selected model areas with the target
year 2015. |
MP |
1998-1999 |
|
Mongolia |
JICA |
Strengthening of Agricultural Cooperatives
Nationwide survey for agricultural cooperatives' action plan
establishing commodity distribution system. |
MP |
1996-1997 |
|
Mongolia |
JICA |
Central Region Integrated Agricultural and Rural Development
|
MP |
1994 |
|
[Client/Finance] |
[Services] |
|
JICA |
: |
Japan International Cooperation Agency |
S |
: |
Studies |
|
JBIC (OECF) |
: |
Japan Bank for International Cooperation |
MP |
: |
Master Plan |
|
Grant |
: |
Japanese Grant |
FS |
: |
Feasibility Study |
|
IBRD |
: |
International Bank for Reconstruction and Development |
SAPROF |
: |
Special Assistance for Project Formation |
|
WB |
: |
The World Bank |
SAPI |
: |
Special Assistance for Project Implementation |
|
ADB |
: |
Asian Development Bank |
SAPS |
: |
Special Assistance for Project Sustainability |
|
UN |
: |
United Nations |
D |
: |
Design |
|
UNDP |
: |
United Nations Development Program |
BD |
: |
Basic Design |
|
UNIDO |
: |
United Nations Industrial Development Organization |
DD |
: |
Detailed Design |
|
IDA |
: |
International Development Association |
CS |
: |
Construction Supervision |
|
FAO |
: |
Food and Agriculture Organization |
OM |
: |
Operation and Maintenance |
|
JETRO |
: |
Japan External Trade Organization |
PM |
: |
Project Management |
|
ADCA |
: |
Agricultural Development Consultants Association, Japan |
|
|
|
|
ECFA |
: |
Engineering Consultant Firms Association, Japan |
|
|
|
|
IDI |
: |
Infrastructure Development Institute, Japan |
|
|
|
*Finance source appears when the source is different from the client.
|