Country |
Client/Finance |
Project |
Services |
Period |
|
Cambodia |
JICA |
The Study on Regional Development of The Phnom Penh-Sihanoukville Growth
Corridor
The Study will propose " Regional Development Master Plan of the
Phnom Penh-Sihanoukvill Corridor" with a focus on the latter aspect,
that is, encouraging industrial development of the corridor in close
relationship with Shhanoukvill Export Processing Zone (EPZ).
The Study will include a feasibility study on the said EPZ as well as
technical transfer to the counter parts and those involved in the Study
during the course of the Study. |
MP, FS |
2002-2004 |
|
Cambodia |
JICA
Government/Grant |
The Project for Rehabilitation of National Road No. 7 (Kompong Cham
Section)
Rehabilitation of two bridges (Moat Khmung Bridge and Mream Treak
Bridge) and road along Route No. 7 from the east side of Mekong River
around the Mekong River Bridge construction area to Thnal Totoeng (11.5
km). |
BD
DD, CS |
2000-2001
2001-2004 |
|
Cambodia |
JICA |
Rehabilitation and Reconstruction of Agricultural Production System in
the Slakou River Basin
Agricultural reconstruction/development in the upper to middle basin of
the Slakou river as a model for the reconstruction/development of shallow
bounded reservoir irrigation systems in the Kingdom of Cambodia. |
MP, FS |
2001-2002 |
|
Cambodia |
JICA
Government/Grant |
Rehabilitation and Upgrading of Electricity Supply Facilities in Phnom
Penh, Phase II
Rehabilitation of power supply units in Phnom Penh City including power
demand forecast and review for power supply organization.
T/L: 22 kV, Overhead 48 km, Underground 33 km
S/S: Upgrading 44 nos., New 62 nos.
Low tension line 184.7 km2 |
BD
DD, CS, OM |
1997-1998
1999-2002 |
|
Cambodia |
JICA |
Project for Siem Reap Generating Facilities
The project aims to install new power generating facilities (10 MW) in
the city of Siem Reap, and to extend transmission lines (22 kV) between
the new and old facilities. |
BD |
2001 |
|
Cambodia |
JICA |
Drainage Improvement and Flood Control in the Municipality of Phnom
Penh
Improvement of existing urban drainage and flood control system in
Phnom Penh area.
Component A: Reinforcement of dikes
Kop Srov dike (7.65 km), Tompun dike (4.44 km), Svay Pak drainage
sluiceway (1.5 x 2.0 m)
Component B: Tumpun watershed drainage improvement
Pumping Station (15 m3/s), Meanchey drainage stretch (2.64 km),
Tum Mup Toek drainage sluiceway (10 m3/s), Salang drainage
stretch (0.9 km) |
MP, FS
BD |
1997-1999
2001 |
|
Cambodia |
JICA
*Government/Grant |
Construction of Mekong Bridge
Main bridge: 1,000 m (80 m+7@120+80 m), 12.6 m in width, PC 9 span
continuous box bridge
Approach bridge: 360 m in total length (PC continuous connecting girder)
Access road: 2,237 m in total length |
FS, EIA
BD
DD, CS |
1995-1996
1996
1997-2001 |
|
Cambodia |
ECFA |
Rural Electrification Project by Utilizing Renewable Energy
Technical assistance for formulation of rural electrification project(s)
by utilizing solar power, wind energy, mini hydropower, etc., in the
Eastern and Southern Part of Cambodia. |
S |
2000 |
|
Cambodia |
JICA |
Siem Reap Water Supply Project
Comprehensive master plan and feasibility study for water supply for
City of Siem Reap including review of water quality of Ton Le Sap Lake,
West Barai Lake, Ton Le Sap River, and underground water, and out lining
of water supply routes and preliminary design for water supply pipelines
based on the water resource management scheme and demand forecast of
treated water. |
MP, FS |
1996-2000 |
|
Cambodia |
Government/ADB |
Power Rehabilitation Project
Expansion and rehabilitation of diesel power generating facilities and
distribution system in Phnom Penh, Siem Reap and Sihanoukville. |
DD, CS |
1996-1999 |
|
Cambodia |
JICA |
Mekong River Integrated Development
Technical assistance for formulation of strategic planning for Japanese
technical assistance to Mekong River water resources development.
Contacted the Mekong River Commission to discuss the future cooperation of
Japanese engineering assistance for the reparian countries of Mekong River
Technical assistance. |
S |
1997 |
|
Cambodia |
JICA |
Siem Reap Airport Improvement Project
Expansion and rehabilitation of existing airport in Siem Reap. Basic
design study for implementation of the project with financial assistance
of Japanese Grant Aid including traffic demand forecast, social and
natural environmental survey. |
BD |
1997 |
|
Cambodia |
Federation of Economic Organizations |
Sihanoukeville Industrial Estate Development
Technical assistance for preliminary study of industrial estate
development in the hinterland of Sihanoukeville Port. |
S |
1996 |
|
Cambodia |
ADB |
Project Management Coordination and Project Implementation in the Power
Sector
Implementation in the power sector including installation of new diesel
power generator (6,200 kW x 3 nos.) to power station in Phnom Penh. |
DD, CS |
1993-1996 |
|
Cambodia |
Government/Grant |
The Rehabilitation & Upgrading of Electricity Supply Facilities in
Phnom Penh
Installation of new diesel power generator (5 MW x 2 nos.) to No. 5
power station in Phnom Penh, distribution network and control system
improvement. |
DD, CS |
1993-1996 |
|
Cambodia |
JICA |
Integrated Agricultural and Rural Development Project in the Suburbs of
Phnom Penh
Formulation of integrated agricultural and rural development plan which
focus on irrigation improvement for the study area (16,000 ha in total) in
Tonle Bati, Takeo Province Kandel String, and Kandal Province. |
MP, FS |
1993-1995 |
|
Cambodia |
ADB |
Project Implementation in the Agriculture Sector (Irrigation Component)
Rehabilitation works of irrigation facilities, selection and provision
agriculture equipment and fertilizer provision to 6 states in Cambodia
(Project area: 50,000 ha in total). |
DD, CS |
1993-1995 |
|
Cambodia |
Government |
Initial Environmental Examination of the Prek Thnot Multipurpose
Project
Conduction of the IEE in respect to natural aspects, and social aspects
such as water quality, aquatic ecosystem, compensation and resettlement
relevant issues.
Preparation of Terms of Reference (TOR) for further Environmental Impact
Assessment (EIA) with the report |
FS |
1994 |
|
Cambodia |
Private Company |
Medical Facilities Improvement
Improvement of water supply facilities at a hospital in Phnom Penh. |
BD, DD |
1992-1994 |
|
Cambodia |
JICA |
Rehabilitation and Reconstruction of Electricity Supply in Phnom Penh
and Siem Reap
Rehabilitation and reconstruction plan on the existing power supply
system in Phnom Penh and Siem Reap City. |
MP, FS |
1993 |
|
Cambodia |
ECFA |
Comprehensive Study for Reconstruction of Cambodia
Preliminary survey, data collection and analysis for medium and long
term reconstruction program.
Sectors covered by this study:
Macro economy, urban & regional, and institutional development,
agriculture, manufacturing, tourism, transportation, electricity, water
supply, sewerage, healthcare, education, woman in development, mapping and
surveying. |
S |
1992 |
|
Cambodia |
Private Company |
Transportation Sector Study for Reconstruction of Cambodia
Study and investigation on road, bridge, ferry and port facilities. |
S |
1992 |
|
Cambodia |
Private Company |
Angkor Region Tourism Development Study
Preliminary study for reconstruction in tourism sector and balanced
regional development. |
S |
1990 |
|
Cambodia |
Japanese Government |
Prek Thnot Multipurpose Dam
|
FS |
1961-1962 |
|
Cambodia |
Government |
Sambor Multipurpose Project
|
S |
1961-1962 |
|
Lao PDR |
Government/ADB |
Community Management Irrigation Sector Project
The project consists of the following four (4) parts;
i) community mobilization and training,
ii) development of community managed irrigation system (about 70 CMI
system, 3,800 ha including access road with a total length of 90 km),
iii) construction of district feeder roads (two feeder roads with a total
length of about 60 km), and
iv) and institutional support for CMI development. |
DD, CS |
1997-2004 |
|
Lao PDR |
JICA |
Basic Study on the Roads and Bridges in Indonesia Area
The study aims to evaluate the direct and indirect impacts and effects
the construction of roads and bridges in the three Indochina countries has
had in the area, and to analyze the acquired data for further reference in
preparing future basic designs for Japanese Grant Aid. |
S |
2002 |
|
Lao PDR |
JICA |
Study on Transmission Line and Substation System Development
Formulation of an optimal development plan (target year 2020) of
transmission line and substation for domestic electric supply. |
MP |
2001-2002 |
|
Lao PDR |
JICA |
The Telecommunications Development
Preparing master plan for complete and reasonable long-term development
plan for telecommunications network including recommendation for setting
up a network management structure up to the year 2015. |
MP |
2001-2002 |
|
Lao PDR |
JICA |
Feasibility Study on Nam Ngiep-I Hydroelectric Power Project
Formulation of the optimum plan and assessment of environmental,
technical and economic/financial feasibility for the construction of Nam
Ngiep-I Dam (185m high, rockfill type dam) and hydropower station (440
MW).
The study is divined into the following three (3) stages:
1. Environmental Impact Stage;
2. Detailed Investigation Stage and;
3. Feasibility-grade Stage |
FS |
1998-2002 |
|
Lao PDR |
JICA |
Nam Ngum Power Station No. 1 Rehabilitation
2 generators: 30 MW |
BD |
2001 |
|
Lao PDR |
JICA |
The Study on Special Economic Zone Development in Border Area (Savanakhet
Province)
Formulation of a development plan of Special Economic Zone (SEZ) in
Savanakhet Province including i) policy and concept of SEZ as a trigger
for economic development, ii) institutional framework building plan for
development and management of SEZ, and iii) preliminary physical plan of
SEZ. |
MP |
2000-2001 |
|
Lao PDR |
JICA |
Integrated Agricultural Development
Formulation of Action Program which contributes to more effective
promotion of the agricultural development, implementation schedule, based
on the framework of Strategic Vision, the development strategy for the
agricultural sector of Lao PDR, and of Vision 2020 recognized as the basic
development policy. |
MP |
2000-2001 |
|
Lao PDR |
JICA |
Small Scale Agricultural and Rural Development Program along the Mekong
River
Formulation of a master plan for the small scale agricultural and rural
development program, covering 11 districts in the 3 provinces, Bolikhamsai,
Khammuoane and Savanakhet, along the Mekong River and conduct of a
feasibility study on the selected priority project in the course of the
master plan. |
MP, FS |
1998-2000 |
|
Lao PDR |
JICA
Government/Grant |
Pakse Bridge Construction
Construction of the bridge crossing the Mekong River and access road at
Pakse.
bridge length: 1,380 m
Bridge type: Continuous rigid frame PC box girder
Access road length: 3,030 m |
FS
BD
DD
CS |
1995-1996
1996
1996-1997
1997-2000 |
|
Lao PDR |
JICA |
Watershed Management Plan for Forest Conservation in Vangvieng District
Formulation of integrated watershed management plan in Vangvieng
district in order to contribute to the improvement of resources management
and livelihood of the local people. |
MP |
1996-1998 |
|
Lao PDR |
JICA |
Preliminary Survey on Integrated Inundation Mitigation and Agricultural
Development Project in Vientiane Plain
General development plan of farming area with main focus on flood
control along the Nam Gum River. |
S |
1997 |
|
Lao PDR |
JICA
Government/Grant |
National Route 13 Road Betterment and Bridge Rehabilitation
North-south back-bone of highway network in the country, total length
1,245 km (from Luang Prabang to the Cambodian border) and 39 bridges
required reconstruction. |
BD
DD, CS |
1993-1994
1995-1997 |
|
Lao PDR |
Agricultural Development Consultants Association (ADCA) |
Integrated Agricultural and Rural Development Projects
Field reconnaissance and preliminary survey over the following
prospective development areas:
- Integrated Agriculture and Rural Development Project in Southern Plain
- Phon Hong Plain Agricultural Development and Settlement Project
- Laksao Area Integrated Agriculture and Rural Development Project
- Small Scale Irrigation Development Project to Reduce Slash and Burn
Cultivation in Hilly and Mountainous Areas of Central and Northern
Provinces |
S |
1996 |
|
Lao PDR |
JICA |
The Integrated Agriculture and Rural Development Project in the
Bolovens Plateau
Food security, self-sufficiency, promotion of agricultural production,
and improvement of rural life in Bolovens Plateau. |
MP, FS |
1995-1996 |
|
Lao PDR |
JICA
Government/Grant |
Agricultural and Rural Development in the Suburbs of Vientiane
Rural development in the outskirts of Vientiane city
Irrigation: 1,700 ha, Intake pumps: 4 units, Headrace: 11 km, Regulation
pond: 66, 100 m3, Main irrigation canals: 4.83 km, Farm roads:
28.39 km |
FS
DD, CS |
1988-1989
1990-1994 |
|
Lao PDR |
JICA |
Oudomxay Province Agricultural Development- Slash and Burn Cultivation
Control
Irrigated agricultural development in flat lowland and hill areas with
a focus on slash and burn cultivation control in Xai, Beng and Hun
Districts, Oudomxay Province. |
MP, FS |
1992-1993 |
|
Lao PDR |
JICA
Government/Grant |
Nam Ngum Hydropower Station Restoration, Stage II
No. 3 and No. 4 generators 80 MW (Stage II) |
BD
DD, CS |
1989
1989-1992 |
|
Lao PDR |
Government/IDA |
Xedone Hydropower
Basin-wide optimal site identification and feasibility study for
priority schemes in Xedone basin.
Power: Extension of Xedone 2 hydropower scheme 54 MW |
FS |
1990-1991 |
|
Lao PDR |
JICA |
Vientiane Area Drainage System Improvement
Improvement of the flood control and drainage system, putting main
focus on inland water drainage in the area surrounded by the Mekong and
Hong Xeng rivers, Wattay Airport and That Luang Marsh (52 km2). |
MP, FS |
1989-1990 |
|
Lao PDR |
JICA
Government/Grant |
Tha Ngon Model Farm Rehabilitation
Renewal and repairing of pumping equipment and irrigation and drainage
facilities.
Irrigation canals: 14.9 km, Drains: 15.2 km |
BD
DD, CS |
1986-1987
1987-1988 |
|
Lao PDR |
JICA
Government/Grant |
Vientiane Area Substations Rehabilitation
Restoration of existing six substations
Phone Tong S.S.: 74 MVA, 115/22 kV
Thana Leng S.S.: 10 MVA, 115/22 kV
Sisaket Switching Station: 22/400V/230V
That Luang Switching Station: 22/400V/230V
Wattay Switching Station: 22/400V/230V
Sokpalouang Switching Station: 22/400V/230V |
S
DD, CS |
1985-1986
1986-1988 |
|
Lao PDR |
Government/JBIC |
Na Phok Village Construction
Land preparation and rural community development in three villages (500
ha). |
DD, CS |
1973-1974 |
|
Lao PDR |
ADB |
Tha Ngon Agricultural Development
Pump station: Irrigation 32.4 m3/min., Drainage 52 m3/min.
Canals: Mains 8 km, Laterals 41.1 km in total
Flood gate: Two barrel culverts (2.0m high, 2.4m wide) Gate 2.0 m x 5.0 m
Drainage canals: 34.5 km in total |
S
DD, CS |
1963
1968-1974 |
|
Lao PDR |
Japanese Government
IBRD/Nam Ngum Development Fund |
Nam Ngum Hydroelectric Power Development
Dam: Concrete gravity, H=75 m, V=370,000 m3, Crest Length
468 m
Reservoir: Surface area at H.W.L; 370 km2, gross storage
capacity; 7,030,000,000 m3, effective storage capacity;
4,700,000,000 m3
Power: 30 MW
T/L: 115 kV/144 km |
S, DD, CS |
1959-1973 |
|
Lao PDR |
JICA
Government/Grant |
Vientiane International Airport Extension
Runway extension: 3,000 m, holding apron improvement: 213,120 m2,
apron improvement: 2,052 m2, new exit taxiway: 600 x 23 m x 2,
parallel taxiway extension: 440 m x 23 m |
S, DD, CS |
1968-1972 |
|
Lao PDR |
Government |
Vientiane Plain Irrigation
|
FS |
1967-1968 |
|
Lao PDR |
UN/UNDP |
Nam Ngum River Basin Development
|
MP, FS |
1959-1964 |
|
Lao PDR |
UN/UNDP |
Lower Nam Ngum Irrigation
|
FS |
1961-1962 |
|
Lao PDR |
Japanese Government |
Lower Mekong-Major Tributaries (34 rivers) Reconnaissance Survey
|
S |
1959-1961 |
|
Lao PDR |
UN |
Comprehensive Lower Mekong Development Reconnaissance Survey
|
S |
1956 |
|
Myanmar |
JICA |
Study on Integrated Mangrove Management through Community Participation
in the Ayeyawady Delta
Formulation of an Integrated Mangrove Management Plan which aims at the
rehabilitation and sustainable use of the mangrove resources by the local
communities. Transfer of relevant technical skills/knowledge to the
Myanmar Counterpart personnel through en-the-job training during the
course of study. |
MP |
2002-2005 |
|
Myanmar |
JICA |
Renewable Energies in Rural Area
Formulating a guideline for the introduction of renewable energies in
rural areas of Myanmar, preparing actual development plans for selected
sites, and installation of pilot plant(s) necessary knowledge and
technology to concerned personnel in Myanmar and the preparation of a
manual will be implemented for efficient introduction of renewable
energies in Myanmar. |
MP |
2001-2003 |
|
Myanmar |
JICA |
Rehabilitation of Baluchaung No. 2 Hydropower Plant
The project aims to improve power generation efficiency of the
Baluchaung No. 2 Hydropower Plant, which supplies 20% of the nation's
electricity. The rehabilitation work consists of replacing and repairing
severely deteriorating facilities and machinery such as transformers,
supplementary machinery of turbines and control panels. |
BD |
2001-2002 |
|
Myanmar |
JICA |
Solid Waste Disposal in Yangon City
Assist in formulating solid waste disposal planning in Yangon city. |
S |
2000-2001 |
|
Myanmar |
Government |
Yeywa Hydropower Project
Study to confirm the feasibility of the project from technical,
environmental and economic viewpoints.
600 MW (150 MW x 4 units), 2,815 GWh/year |
S
FS |
1994-1995
1998-2000 |
|
Myanmar |
Government |
Thanintharyi (Tenasserim) River Basin Hydropower Development
Preliminary hydropower potential study for electric power supply
development in the target area. |
S |
1996-1997 |
|
Myanmar |
Private Company |
Tavoy Industrial Port Complex Development
Conceptual study including survey and analysis on existing port
facilities, selection of the optimum project sites, preparation of port
layout plan of planned new port along the Mawlamyne river. |
S |
1996 |
|
Myanmar |
Government |
Bilin Hydropower Project
Review of existing study, survey on the feasibility from technical and
economic viewpoints and suitable method of the project, and preparation
for construction of dam type hydropower scheme (800-1,000 GWh, 700 MW,
Target year 2005). |
FS |
1994-1996 |
|
Myanmar |
Private Company |
Intersection Improvement in the City of Yangon
Conceptual study for improvement of the Pyay/Insein/Hledam/University
Roads Junction to cope with expected traffic growth.
Elevated section: L=2,300 m in total |
S |
1995 |
|
Myanmar |
Private Company |
Ta Sang Hydropower Project
Reconnaissance study
Capacity: 3,600 MW
Dam: 162.5 m high |
S |
1993-1994 |
|
Myanmar |
Government/JBIC |
Balu Chaung No. 1 Hydroelectric Project
Installation of the 28 MW at No. 1 power station to increase the system
capacity, supplying 200 GWh per annum hydropower to existing system, and
improvement of existing output of No. 2 power station to 168 MW, 146 GWh. |
DD, CS |
1984-1992 |
|
Myanmar |
ADB |
Yenwe Multipurpose Dam
Dam: Earth-fill, 72 m high, 2,200,000 m3 volume
Irrigation: 48,000 ha
Power: 16,000 kW |
FS |
1980-1981 |
|
Myanmar |
JICA |
Irrawaddy Bridge
|
FS |
1974-1975 |
|
Myanmar |
Government/
Japanese Government |
Balu Chaung No.2 Hydroelectric Power Development - 1st Stage
Power: Run-of-river type, net head 425.2 m, 84,000 kW, 235 GWh/year
T/L: 230/132 kV, 770 km |
S, DD, CS, OM |
1954-1964 |
|
Thailand |
Government/JBIC |
Second Bangkok International Airport Project, Ground Improvement -
Phase II
・ Ground
Improvement Works for the Landslide Road System
・ Ground
Improvement Works for East Runway/Taxiway and Cargo Aprons. |
CS |
2001-2004 |
|
Thailand |
Government/JBIC |
Regional Development Program II
Overall project management of the following program.
- Tourism Facilities, 11 sub-projects with total budget of construction
cost 856.92 million Baht.
- Environmental Facilities, 1 sub-projects with total budget of
construction cost 166.44 million Baht.
- Natural Study Center, 4 sub-projects with total budget of construction
cost 221.33 million Baht. |
PM |
2001-2004 |
|
Thailand |
|
Development of a Building Safety System Focussing on Fire Prevention
To secure safety of buildings, analysis of present conditions,
formulation of strategies for five safety, recommendations on amendment of
the five safety regulations, on technical manuals/guidelines and
examination of the possibility of establishing a center for evaluation
concerning building safety. |
MP |
2001-2003 |
|
Thailand |
JBIC |
Agricultural Credit for Rural Development Project (1) to (4)
This project was implemented, aiming to make agricultural production
more efficient and increase the income of small-scale farmers by spreading
the use of agricultural credit through the provision of sub-loans. The
implementing agency, Bank for Agriculture and Agricultural Cooperatives (BAAC)
is considering the building of a Crop Information System (CIS), the data
base system for farmers and agricultural cooperatives.
This study will make recommendations for building CIS in a way that will
bring more benefits (in the form of more efficient production and
increased profitability) to farmers, thereby strengthening the role of
agricultural credit through BAAC and leading to reduction in disparities
between urban and rural areas. |
SAPS |
2001-2002 |
|
Thailand |
JBIC |
The Environmental Fund Project
This Fund was established to efficiently meet the financial
requirements of the environmental projects across Thailand. Under the
assistance of ODA loans, 24 solid waste disposal projects and 4 waste
water treatment projects have been formulated and approved as
sub-projects.
This study will draw up a project formulation manual for local
municipalities, which are responsible for sub-project formulation, and
screening guidelines for the Ministry of Science, Technology and
Environment, which is responsible for screening projects. The study will
also make proposals on how to address environmental and social
considerations, and invite personnel for training, in an effort to ensure
that the sub projects are executed accurately. |
SAPI |
2001-2002 |
|
Thailand |
JICA |
Integrated Regional Development Plan for Border Area
Preparation of integrated regional development master plan (target
year: 2020) with main focus on border development linking with East-West
Transport Corridors within the framework of Greater Mekong Sub-regional
Cooperation (GMS).
Study Area:
Thailand: 4 provinces (Mukdahan, Nakhon Phanom, Sakhon Nakhon, and Kalasin:
26,000 km2)
Laos: 2 provinces (Savannakhet and Khammouan: 37,000 km2) |
MP, pre-FS |
2000-2002 |
|
Thailand |
JICA |
Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan
Area
- strengthen the institutional capacity of relevant organizations
including local communities through technology transfer in the course of
the Study,
- formulate a redevelopment plan and conduct a case study for the Din
Daeng-Makkasan-Huay Khwang area, and
- prepare recommendations for urban renewal in the Bangkok Metropolitan
Area. |
MP, FS |
2000-2002 |
|
Thailand |
JETRO |
Tha Sae-Bang Saphan Water Conveyance Project
The water conveyance pipeline from Tha Sae Dam (under planning) Saphan
Industrial Estate (Total pipeline length: about 70 km). |
FS |
2000-2001 |
|
Thailand |
Government/JBIC |
Map Ta Phut Industrial Port Phase I&II
Review of existing studies, preparation of detailed drawings and
supervision of construction for the phase I area, and management of
construction for the phase II area selected from the designed second phase
development area.
Inner Basin (-12.5 m): Multipurpose Terminal (2-Berths), Liquid-cargo
Terminal (2-Berths), Shell/Client Terminal (10-Berths)
Outer East Basin (-15.5 m - 17.5 m): Soyang Chemical Terminal (2-Berths),
BCP/IPP Terminal (1-Berth) |
DD, CS
S
DD
CS, OM |
1984-1992
1991
1994-1995
1996-2001 |
|
Thailand |
JICA |
Project Formulation Study on Improvement of the Quality of Agricultural
Products
Study aims at formulation of projects in Quality of Agricultural
Products sub-sector (Fishery, Livestock and Agro-Industries) under
assistance of Japanese Government. |
S |
2000 |
|
Thailand |
JICA |
The Study on Improvement of Small Scale Irrigation Program (SSIP) in
North-Eastern Region
Study aims to clarify and define the constraints of the selected three
(3) projects with respect to efficient utilization of the constructed
facilities through field investigations and exchange of opinions with
officials concerned, and to make recommendations for improvement of the
present SSIP at various stages such as villagers initiated project
proposal, planning, designing, construction, O&M, etc. |
S |
2000 |
|
Thailand |
JBIC |
Tha Sae Reservoir Project
Review and up-grading of the existing project plan in order to prepare
for the project implementation by JBIC loan. The scope of the project is
construction of reservoir (Zoned Earth Fill, H=59 m) in Chumporn Province
to improve water supply to meet the water demand for irrigation and for
industry and to control floods. |
SAPROF |
2000 |
|
Thailand |
JICA |
Second Mekong International Bridge Construction Project
Detailed design and preparation of tender documents for construction of
international bridge crossing the Mekong river between Mukdahan, Lao PDR,
and Savannakhet, Thailand Bridge (1.4 km, Extra Dosed), Access road,
Revetment, Immigration facilities. |
DD |
1999-2000 |
|
Thailand |
JETRO |
Outer Bangkok Ring Road (Southern Portion) Construction Project
Review of the engineering, economic feasibility study and the
environmental impact assessment of the Southern Bangkok Outer Ring Road.
L=941 m (Cable-Stayed Bridge) |
FS |
1999-2000 |
|
Thailand |
JICA |
Sewage Sludge Treatment/Disposal and Reclaimed Wastewater Reuse
Master plan study on sewage sludge treatment and reuse of reclaimed
wastewater in Bangkok Metropolitan area. |
MP |
1998-1999 |
|
Thailand |
JICA |
Kok Ing Nan Water Diversion
Study for construction of water diversion canal and tunnel for 2.5
billion cubic meter volume of water.
The maximum discharge capacity of canal structures would be 175m3/s
(River Training: 50 km, Total Canal Length: 40 km, Total Tunnel Length: 60
km, Total Irrigation Area: 300,000 ha). |
MP, FS |
1996-1999 |
|
Thailand |
Government/JBIC |
Outer Bangkok Ring Road (Eastern Portion) New Highway
Review of detailed design and construction supervision of 64 km long
(divided 4-lanes) new motorways including 8 grade-separated interchanges
which connect eastern suburbs of Bangkok. |
CS |
1994-1999 |
|
Thailand |
JBIC |
Study on Present Condition and Policy in Agricultural Sector
Collection of statistical data for analyses of present condition in
agricultural sector and trend survey in agricultural policy. |
S |
1998 |
|
Thailand |
JBIC |
BMA Waste Water Management Project
Survey and investigation for construction of sewerage treatment systems
in Thonburi (51.22 km2) and Khlong Toey (57.15 km2)
districts in Bangkok Metropolitan area. |
SAPROF |
1997-1998 |
|
Thailand |
JBIC |
Mae Kuang Irrigated Agriculture Development Project
Review the current situation of the project and surrounding region,
study on appropriate land use and water utilization plan, and review and
recommendate of operation and maintenance system. |
SAPS |
1997-1998 |
|
Thailand |
JICA |
Western Seaboard Regional Development
Comprehensive regional development for Western Seaboard of Thailand
(targeting year: 2011, end of the 10th 5-year plan)
Study area: 6 provinces (28,352 km2, 2.77 million people), all
of the related local and national government administrations. |
MP |
1996-1998 |
|
Thailand |
Private Company
(Rayong Olefins Co., Ltd.) |
Rayong Olefins Port Development
Carried out a conceptual design of the RTT jetty for Rayong Olefins
Co., Ltd., as the step I of the port development.
Also carried out the detailed design stage as step II, and construction
supervision for step III for the port development.
Berth No. 1: 100,000 DWT
Berth No. 2: 20,000 DWT |
S
DD
CS |
1995
1996-1997
1997-1998 |
|
Thailand |
Private Company |
Golden Gateway Project
Preparation of technical pre-feasibility study to determine the
suitable location for construction of deep sea port (200,000 DWT) in
Bokpyin area, the suitable way for construction of land bridge. |
S |
1997 |
|
Thailand |
JICA |
Lampang-Chiang Mai Motor Way
Preparation of detailed engineering design for construction of the 32
km length motor way including two tunnels.
Bridge: 290 m, Viaduct: 9.4 km in total, Interchange, Tunnel: 3.8 km + 0.7
km |
DD |
1996-1997 |
|
Thailand |
JICA |
Bang Saphan Industrial Estate Development
Formulation of comprehensive development framework of Bang Saphan and
its surrounding area, and the feasibility study of the port and the
industrial estate development of Bang Saphan. |
FS |
1995-1997 |
|
Thailand |
ECFA/Government |
Southern Seaboard Industrial Region Development
Feasibility study for the development of Banratcha Port and Long Suan
Port in the Southern Seaboard as the proposing sites for industrial estate
construction.
Also conducted the comparative study for other alternative development
locations from both technical and financial aspects. |
FS |
1996 |
|
Thailand |
Private Company |
Malaysia-Thai Landbridge Project
Feasibility study for the development of Long Kawi Port and Song Khla
Port for the future possible site of gateways connecting the Gulf of Siam
and the Andaman Sea. |
FS |
1996 |
|
Thailand |
Private Company (Thai LNG Power Corporation) |
Map Ta Phut Port Phase-3 Development
Assistance in tender evaluation for construction of the port and
related structures for handing LNG. |
DD |
1996 |
|
Thailand |
Private Company |
Sukhumvit City Tower Construction
Construction supervision for Sukhumvit City Tower, 230,000 m2
of floor of floor area-complex in 38 stories with 3 basement stories
located at Sukhumvit Road Soi 24 Bangkok for the City Realty Co., Ltd. |
CS |
1993-1996 |
|
Thailand |
Private Company |
Investment Study on Map Ta Phut Port
Preliminary engineering and economic study on the land reclamation at
Map Ta Phut Port, including outline estimate of land cost on rental basis. |
S |
1995 |
|
Thailand |
Private Company |
Marine Facility for Banpu Port
Port and reclamation study for establishment of IPP complex to conduct
bidding including outline design of coal unloading berth and coal
unloading and storage conveyor plans. |
S |
1995 |
|
Thailand |
JICA |
Inter-Urban Toll Expressway Construction
Lampong~Doi Saket: 98.2 km
Bon Pong~Cha Am: 133.8 km |
FS |
1993-1995 |
|
Thailand |
Government/JBIC |
Agricultural Credit for Rural Development
To assist EAC (Bank for Agriculture and Agricultural Cooperatives) in
improving its ability to give appropriate advice to farmers on producing
their products and improving the ability of JICA's staff in the field of
financial management and improving the administrative accounting system. |
S |
1993-1994 |
|
Thailand |
Private Company |
Caltex Refinery Reclamation
Development of the land for port development
Reclamation fill: 12,000,000 m3
Revetment: 4.5 km |
DD |
1992-1994 |
|
Thailand |
Private Company |
Industrial Port Concentrate Unloading Berth and Storage Facility for
Padaeng Industry Port (Map Ta Phut Port)
Copper smelter berth to unload materials and to ship out copper import
with annual shipment of 1.0 million tons (Jetty: 60,000 DWT x 1, 10,000
DWT x 1)
Cool water supply system and Heat-effuent discharge system with a intake
capacity of 8.9 m3/sec.
Unloader: one unloader on wharf
Vessel Size: maximum vessel size: 30,000 DWT
Wharf for Acid Storage: Wharf for approx., 1,000 DWT vessel |
S
DD, CS |
1991
1992-1994 |
|
Thailand |
UNIDO |
Steel Based Industrial Complex in Western Seaboard
Pre-investment studies of industrial estates of steel complex including
master plan study for the Bang Saphan Port and infrastructure. |
S |
1993 |
|
Thailand |
JICA |
Lower Northeast and Upper East Regions Development
Identification of development potentials and constrains of agriculture,
forestry, fishery and livestock, industry, infrastructure, tourism,
urbanization. |
MP |
1992-1993 |
|
Thailand |
Private Company |
National Fertilizer Port for Map Ta Phut Port
Fertilizer plant berth to unload materials and ship out fertilizer with
annual shipment of 2.0 million tons.
Jetty: 60,000 DWT x 1, 30,000 DWT x 1
Cargo Equipment: Bucket-unloader x 1, Belt conveyor system |
S |
1992 |
|
Thailand |
Private Company |
Puratchap Port Construction
Review on Port Detailed Design, focusing on the stability of
breakwater, alignment of berth and breakwater and overall project
implementation, including cost, construction period and tender documents. |
S |
1992 |
|
Thailand |
JICA |
Nationwide Inter-Urban Toll Motorway Development
Toll expressway network from the view point of national and regional
development, toll road system and organization for implementation and
operation and examine socio-economic development effect.
Study area: 540,000 km2 |
MP |
1990-1992 |
|
Thailand |
Government/JBIC |
Mae Kuang Irrigated Agricultural Development
Main dam: Earth-fill, 73 m high, 610 m long, 4,700,000 m3
volume
Right sub dam: Earth-fill, 40 m high, 640 m long, 1,100,000 m3
volume
Irrigation: 28,000 ha |
CS |
1987-1992 |
|
Thailand |
Government/JBIC |
Export Oriented Crop Promotion Sustenance
Advisory services to identify export-oriented crops, evaluate the
potential for developing prospective crops, establish a computerized
management information system. |
DD |
1990-1991 |
|
Thailand |
Government/IBRD |
Southern Seaboard Development
Large-scale Peninsular Thailand development including trans-peninsular
land bridge, highway and railway systems with container terminals, and oil
and gas related industries, deep sea ports, offshore submarine pipelines
and other supporting infrastructures. |
MP, FS |
1990-1991 |
|
Thailand |
Private Company |
Matsui Factory Construction Project
Preparation of Basic Conceptual Design including conceptual design of
factory building, showing plan and elevation views, basic structural
requirement, land development and infrastructural facilities.
Study area: floor 2,160 m2 |
BD |
1990 |
|
Thailand |
Private Company |
Chantaburi Resort Project
Preparation of a comprehensive program for development of Chantaburi
Garden including main components of Agricultural, Resort, Training and
Housing lot development.
Study area: Chantaburi Garden 800 ha (5,000 rai) |
FS |
1990 |
|
Thailand |
JICA |
Phukhet Municipality Sewerage and Drainage Improvement
Comprehensive program for improvement and development of sewerage and
storm water drainage system in Phukhet municipal area, and urgent priority
schemes. |
MP |
1989-1990 |
|
Thailand |
Government |
Kong Chi Mun Area Water Resources Development
Multi-regional water resources development in Nong Khai area (13
provinces, 350,000 ha). |
S |
1989-1990 |
|
Thailand |
JICA |
Phatthaya Area Integrated Development
Comprehensive urban development with main focus on revival of
internationally reputed resort and establishment of new regional center.
Project target year: 2006 |
S |
1988-1990 |
|
Thailand |
JICA
Government/JBIC |
Laem Chabang Coastal Area Industrial Development
Deep sea port within the framework of the overall industrial and urban
development program.
Container berth: 33,000 DWT x 7, Tapioca handling berth: 140,000 DWT x 1,
Sugar/Molasses handling berth: 20,000 DWT x 1, Break bulk berth: 40,000
DWT x 7 |
MP, FS
DD, CS |
1984-1985
1987-1990 |
|
Thailand |
Government/ADB |
Khlong Sadao Dam Construction
Augmentation of raw water supply to the Had Yai/Songkhla water works.
Dams: Main dam: Earth-fill, 37.5 m high, 775 m long, Saddle dam:
Earth-fill, 11 m high, 450 m long
Total fill volume 1,340,000 m3 |
FS, DD |
1988-1989 |
|
Thailand |
JICA |
Central Region Road Development
Overall road network development in 26 provinces, Central Region.
Trunk highway network 6 routes, 238.6 km
Supplemental road network 14 routes, 403.4 km |
MP, FS |
1987-1989 |
|
Thailand |
Government/JBIC |
Bangkok International Airport Expansion
Expansion of apron, passenger and cargo terminal buildings, fire
station and all other associated utilities and facilities
Runway: 3,700 m x 60 m, Taxiway: 2,100 m x 23 m - 30 m, Parallel taxiway:
2,900 m x 28 m, Apron: 763,000 m2 (expansion and overlay),
Terminals: 291,000 m2, Parking area: 110,000 m2
(3,000 cars), and related facilities, Diesel: 1,000 kW x 4 nos., 850 kW x
3 nos., 500 kW x 1 no. |
DD, CS |
1980-1989 |
|
Thailand |
JICA |
Chao Phraya River Basin Flood Forecasting and Warning System
Development
Basin-wide flood forecasting system
Catchment area: 162,000 km2 |
FS |
1987-1988 |
|
Thailand |
Government/JBIC |
Productivity Road Program-Stage III
Nong Bua-Ban Lup Pho productivity road: 162.6 km, 8 other productivity
roads: 300 km |
CS |
1986-1988 |
|
Thailand |
JICA |
New Krung Thep Bridge Construction and Thonburi Road Extension
Bangkok metropolitan highway bridge across Chao Pharya river.
PC box girder, 2,093 m long, 17.9 m wide |
FS |
1986-1987 |
|
Thailand |
Government/JBIC |
New Flyover Bridge and Approach Road Construction for Bangkok
International Airport
Bridge: L = 500 m (with 1 junction), W = 6 m (1 lane ) + 1.5 m
(pedestrian)
Crossing over Vibhavad-Rangsit highway
Approach: L = 80 m, W = 6 m (1 lane)
Traffic capacity: 1,820 vehicles/h
Substructure: Reinforcement Concrete Pier with PC pile
Superstructure: PCI girder bridge deck |
DD, CS |
1984-1987 |
|
Thailand |
JICA |
Sakae Krang River Basin Development
Basin-wide agricultural development
Irrigation: 46,700 ha, V=2,500,000 m3
Dam: Rockfill
Main canals: 76.7 km |
FS |
1984-1986 |
|
Thailand |
Government/JBIC |
New Village Development Program
Village infrastructural development, farm productivity promotion,
vocational training and rural people organization in 1,025 villages, 38
provinces. |
CS |
1980-1986 |
|
Thailand |
Government/JBIC |
Nong Pla Lai Multipurpose Dam
Dam: Earth-fill, 31 m high, 4,060 m long, 4,000,000 m3
volume
Irrigation: 21,200 ha, Municipal and industrial water supply: 36.2 million
m3/day |
DD |
1984-1985 |
|
Thailand |
JICA |
Nong Kho-Laem Chabang Water Pipeline
Municipal and industrial water supply
1st stage: Pipeline 14.4 km, design water discharge 0.82 m3/s
2nd stage: Pipeline 14.4 km, design water discharge 0.82 m3/s |
FS |
1983-1984 |
|
Thailand |
JICA |
Northeastern Region Road Development
Master plan (70 links, 2,700 km in total), and feasibility study on
construction and improvement (15 links 502.1 km) and rehabilitation 90 km,
8 routes. |
MP, FS |
1982-1983 |
|
Thailand |
JICA |
East Coast Multi-Basin Integrated Water Resources Development-Phase II
Long-term and multi-regional water resources development to year 2001.
Irrigation: 16,700 ha in total
3 dams: earthfill, H=20~21 m |
MP, FS |
1982-1983 |
|
Thailand |
JICA |
Upper Pa Sak Medium-Scale Irrigation
Irrigation: 13,500 ha in total
4 dams: earthfill, H=35.3 m ~57 m, V=770,000 m3 ~ 3,330,000 m3 |
FS |
1981-1983 |
|
Thailand |
JICA |
Northern Region Road Development
Master plan: Short/medium-term development: 31 links 862.1 km,
long-term development: 13 links 325.7 km (170,000 km2, 16
routes, 409.3 km), and feasibility study (14 routes, 417.2 km |
MP, FS |
1980-1982 |
|
Thailand |
Government/IBRD |
Phitsanulok Irrigation
On-farm development of 100,000 ha
Lateral canals: 760 km
Drains: improved 120 km, Newly constructed 215 km |
DD, CS |
1976-1981 |
|
Thailand |
JICA |
Nong Bua-Ban Lam Chi Bon Highway
Improvement: 41.9 km, new road construction: 112.8 km |
FS |
1979-1980 |
|
Thailand |
JICA |
Phetchabun-Chai Badan Highway
|
FS |
1978-1979 |
|
Thailand |
Government/Japanese Government |
Southern Thailand Hydroelectric Development Project
|
FS |
1967-1978 |
|
Thailand |
IBRD |
Udorn/Nong Khai/ Vientiane Transmission Line Project
Transmission line: 115 kV/ 70 km, single circuit
Substations: Nong Khai S/S ( newly constructed ), 1 x 5 MVA: 115 kV/ 22
kV, Udorn S/S (extension of existing facilities), Extension of one feeder
of 115 k |
D, CS |
1970-1972 |
|
Thailand |
Japanese Government, Mekong Committee |
Nong Khai-Vientiane Bridge
|
S |
1968-1969 |
|
Thailand |
Japanese Government, Mekong Committee |
Lower Mekong River Tributaries Development
|
S |
1958-1961 |
|
Thailand |
UN |
Lower Mekong River Basin Development
|
S |
1956-1958 |
|
Vietnam |
Government/JBIC |
Dai Ninh Hydropower Project
Aim for stable supply of electric power by building hydropower plant
using the water power resources of the Dong Nai water system. |
CS |
2001-2006 |
|
Vietnam |
Government/JBIC |
Hai Phong Port Rehabilitation Project
Phase I
Wharf: 10,000 DWT x 15
Cargo Equipment: Transfer crane system, Various marshaling yard equipment,
including, folk-lift-trucks and mobile cranes
Civil Works: Transit shed/CFS, Bank protection, Pavement expansion,
Sub-soil improvement, Revetment/Embankment
Phase II
Container Terminal in Chua Ve Port: 2 berth, reclamation, pavement, road,
buildings, utilities
Channel Improvement Work: D=-5.5 - 5.7m, levee, protection work
Operation and Maintenance Training Program |
FS
DD, CS
DD, CS |
1993
1995-2000
2000-2005 |
|
Vietnam |
Government/JBIC |
Nhon Trach Water Supply in Dong Nai Province
Water Supply to industrial zone and residence along National Road No.
51 such as: Tam Phuoc, An Phuoc, Long Thanh and Nhon Trach in Dong Nai
Province with capacity of 100,000 m3/day. |
DD, CS |
2000-2004 |
|
Vietnam |
Government/JBIC |
Da Den Dam Water Supply System in Ba Ria-Vung Tau Province
Clean water supply for domestic and industrial use and other business
and services activities in the urban areas and industrial zones in Ba Ria
- Vung Tau province with a capacity of 50,000 m3/day. |
DD, CS |
2000-2004 |
|
Vietnam |
IBRD |
Water Resources Assistance Project
Preparation of three component of the Vietnam Water Resources
Assistance Project(1) Integrated Development of the Thu Bon Basin(2)
Irrigation Modernization(3) Dam Safety Management |
MP, FS |
2002-2003 |
|
Vietnam |
JBIC |
Sector Loan for Poverty Reduction and Rural Development
The objective of the study is to alleviate poverty in village area.
Project will consist of the following components: a) Rehabilitation,
upgrading and construction of rural road system, b) Rehabilitation,
upgrading and construction of water supply system, c) Rehabilitation,
upgrading and construction of irrigation system, and d) Rehabilitation,
upgrading and construction of power distribution system. |
MP, FS |
2002-2003 |
|
Vietnam |
Government/JBIC |
Rural Infrastructure Development and Living Standard Improvement
Project (III) (SPL-III)
Overall monitoring and evaluation, and provision of technical advise
and recommendations for implementation of sub-projects in following four
sectors.
Water supply sector: 25 subprojects
Road sector: 60 subprojects
Electricity distribution sector: 60 subprojects
Irrigation sector: 25 sub projects |
PM |
2001-2003 |
|
Vietnam |
JICA |
Nationwide Water Resources Development and Management
Formulation of master plan for nationwide water resources development
and management including integrated river basin management plan for the
sele |