Country |
Client/Finance |
Project |
Services |
Period |
|
East Timor |
UNOPS |
Urgent Rehabilitation Project of Restoration of Navigation Aids and
Fender System at the Port of Dili
Detailed design, assistance to tendering process, and construction
supervision for rehabilitation of navigation aids and fender system. |
DD, CS |
2000-2001 |
|
East Timor |
JICA |
Study on Urgent Rehabilitation Plan
Formation of urgent rehabilitation plan for roads, bridges, ports,
irrigation and power of East Timor in order to contribute UNTAET's
infrastructure rehabilitation plan. |
S |
2000 |
|
Indonesia |
Government/JBIC |
Ciliwung Cisadane River Flood Control Project
Mitigation of flood damages in the area along the lower reaches of the
Cisadane river by means of the construction of the Ciliwung floodway and
the river improvements of lower reaches of the Cisadane river.
Ciliwung Floodway Tunnel
Length of tunnel: 913 m, Inner diameter of tunnel: 8.0 m, Discharge
capacity: 300 m3/s per 1 channel
Cisadane River Channel
Improvement length: 15 km, Design discharge: 1,500 m3/s for 25
year probable flood |
DD, CS |
1999-2005 |
| Indonesia |
Directorate General of Water Resources Development |
Sector Loan For Water
Resources Development II (PTSL II) PTSL-I was
completed in 2000 under financial assistance from the Government of Japan.
Subsequently, the Directorate General of Water Resources (DGWR) has obtained
the Loan Agreement from the Donor.
The main objectives of the Project are to increase cropping intensity and
farming productivity as well as to improve living standards. The related
objective of the Project is to formulate a framework and standardised
procedures for preparatory works for f 19 sub-projects scattered in Sumatra,
Java, and Kalimantan islands |
PM,CS |
2002-7 |
|
Indonesia |
Government/JBIC |
Way Sekampung Irrigation Project III
Construction of main and secondary canals, on farm systems, and land
development for Bekri (6,500 ha) and West Rumbia (5,790 ha). |
CS |
1999-2004 |
|
Indonesia |
Government/JBIC |
Urgent Bali Beach Conservation
24 groins; 104,250 m3, 3 offshore breakwaters; 8,000 m3,
2 submerged breakwaters; 11,400 m3, 4 headlands; 101,000 m3,
artificial reef; 27,900 m3, littoral nourishment; 1,030,000 m3
environment conservation |
DD
CS |
1991-1993
1997-2004 |
|
Indonesia |
JICA
Government/JBIC |
Renun Hydropower and Associated Transmission Line
Reservoir:
Catchment area: 263.5 km2
Dam: Concrete weir, H=8.0 m, L=31.5 m
Power Plant Type: Surface type
Net head: 435.6 m
Installed capacity: 2 x 41 MW
Annual energy output: 313.5 GWh/year
Tanggari II Hydroelectric Power
Net head: 123.1 m
Rated discharge at weir: 18.5 m3/s
Mean discharge at weir: 9.76 m3/s
Surface power station: installed capacity: 19.0 MW; firm energy: 79.7 GWh/year;
secondary energy: 12.3 GWh/year; average energy: 92.0 GWh/year
Transmission lines: 3.8 km |
FS
DD
CS |
1983-1985
1987-1988
1992-2004 |
|
Indonesia |
JICA |
Study on Rural Energy Supply with Utilization of Renewable Energy in
Rural Areas
Formulating a guideline for introduction of renewable energies in
Eastern Region of Indonesia, preparing actual development plans for
selected sites, and installation of pilot plant, transfer of necessary
knowledge and technology to concerned personnel, and preparation of a
manual for implementation of the project. |
MP |
2000-2003 |
|
Indonesia |
Government/JBIC |
Small Scale Irrigation Management Project (SSIMP)-III
Increase agricultural production through improvement of irrigation area
of about 20,000 ha in the provinces of Nusa Tenggara, Sulawesi, and Maluku. |
DD, CS |
1998-2003 |
|
Indonesia |
Government/ADB |
Musi Hydroelectric Power
Trans-basin run-of-river type hydropower development in Upper Musi
basin.
Power: Sarau scheme; 68 MW, 289 GWh/year
Susup scheme; 43 MW
Waterway:
Headrace tunnel: 5.0 m dia. x 2,578 m long
Penstock tunnel: 4.0 - 1.6m dia. x 588 m long
Tailrace tunnel: 5.1 m dia. x 4,030 m long
Power plant type: Underground type
Installed capacity: 210 MW (3 x 70 MW)
Annual energy output: (Primary) 467 GWh, (Secondary) 673 GWh
Gross head: 404.4 m
Max. plant discharge: 62.0 m3/sec/kW, 473 GWh/year
Transmission Line (Musi P/S - Curup S/S - Bukit Asam S/S): 150 kV/213 km |
DD, CS |
1991-2003 |
|
Indonesia |
Government/IBRD |
Besai Hydroelectric Power
High head run-of-river type peaking power plant for reinforcement and
integration of the Lumpung Power System.
Power: 90 MW (45 MW x 2), 369 GWh/year
Power generation and energy output
Installed capacity: 90 MW (45.0 MW x 2)
Annual energy, primary: 144 GWh
Annual energy, secondary: 258 GWh
Intake dam:
Type: Gated concrete weir
Dam crest elevation: EL. 726.3 m
Weir crest elevation: El. 714. 5m
Penstock:
Type: Inclined/horizontal pressure shaft, steel lined
Diameter: 3.8 m to 1.8 m (3.4 m on an average)
Length: 164.197 m
Powerhouse:
Type: Aboveground type |
DD
CS |
1989-1991
1993-2003 |
|
Indonesia |
JICA |
Special Assistance for Project Sustainability for Kota Panjang
Hydropower Plant and Transmissoin Line Projects (Phase I and II)
The objectives of the SAPS study are to evaluate the social and
environmental impacts of the hydropower plant and transmission line
projects, collect data for post-evaluation of the projects and to propose
a comprehensive sustainable plan for the affected villages. |
SAPS |
2002 |
| Indonesia |
JBIC |
Bali Beach Conservation Project Additional Design,
Environmental Study
·
Assess the environmental impacts of measures to
replenish eroding beaches in the south of Bali.
·
Devise means to mitigate (reduce to acceptable
levels) any negative environmental impacts.
·
Prepare an Environmental Management Plan
describing how mitigation and monitoring will be carried out, to ensure that
the environment is protected where necessary.
Prepare and submit to Government authorities (BAPEDALDA and
the AMDAL Commission) reports and other documents necessary to obtain
government approval and an environmental permit for the project. |
EIA,EMP |
2001-2002 |
|
Indonesia |
JICA |
Study on Flood Control and Water Management in Limboto-Bolango-Bone
Basin
The objectives of the study are:
1) to formulate a master plan of sustainable flood control and water
management plan in Limboto-Bolango-Bone basin,
2) to conduct the feasibility study on the priority projects, and
3) to transfer technology to counterpart personnel in the cause of the
study |
MP, FS |
2001-2002 |
|
Indonesia |
JICA |
The Study on Critical Land and Protection Forest Rehabilitation at
Tondano Watershed
The Study aims at development of a land-use plan in the Study area
(54,000 ha) and development of a critical land and protection forest
rehabilitation plan in the Intensive Area. |
MP, FS |
2000-2002 |
|
Indonesia |
Government/JBIC |
Batang Hari Irrigation
Weir (Cascade type)
Crest Elevation: El. 109 m
Crest Width: 189.6 m
Inundation Area: 8.2 km2
Design Development Area: 17,000 ha |
DD
CS |
1994-1996
1998-2002 |
|
Indonesia |
Government/ADB
Government/JBIC |
Peusangan 1&2 Hydroelectric Power
Lake Tawar and Peusangan river hydropower potential development with an
aim at restructuring present diesel dependent power generation.
Peusangan No.1 P/S; 44.6 MW, 113 GWh/year
Peusangan No.2 P/S; 42.6 MW, 196 GWh/year,
150 kV/65 km
Peusangan No. 1 Hydropower Station
Net Head: 146.1 m
Available discharge for power generation: 7.2 m3/sec.
Installed capacity: 44.6 MW
Annual energy output:
- Primary 77.1 GWh
- Secondary 35.8 GWh
Peusangan No. 2 Hydropower Station
Net Head: 237.9 m
Available discharge for power generation: 7.2 m3/sec.
Installed capacity: 42.6 MW
Annual energy output:
- Primary 122.6 GWh
- Secondary 73.4 GWh |
DD
DD, CS |
1992-1994
1994-2002 |
|
Indonesia |
Government/JBIC |
Lower Solo River Improvement
Mitigation of flood damages on the flood prone area, and contribution
to the stability of agricultural production and to accelerate
socio-economic activities in Bojonegoro and Babat area.
River Improvement Works
- Dikes: 492 km
- Revetment: 23,000 m.
- Sluiceway with gates: 250 nos.
- Bridges: 11 new and 7 raising
- Associated roads: 28 km
- Short-cut channel: 1.5 km
North Diversion Floodway (D/D)
Jabun Retarding Basin (D/D) |
DD
FS
CS |
1992-1994
1994
1996-2002 |
|
Indonesia |
JBIC |
Special Assistance for Project Sustainability for Establishment of
Geographic Information System for DKI Jakarta
Study on present operation and maintenance system of GIS for DKI on
technical as well as on institutional aspects, and formulation of
assistance program for effective utilization of GIS. |
SAPS |
2001 |
|
Indonesia |
Indonesia
* |
Special Assistance for Project Sustainability for Twenty Four
Infrastructure Rehabilitation Projects (Package A)
Review study of completed infrastructure projects in river improvement
and water resources development sector under the Japanese ODA loan,
formulation of rehabilitation plan, and recommendation on improvement of
maintenance system. |
SAPS |
2001 |
|
Indonesia |
JICA |
Urgent Countermeasures for Sedimentation in Wonogiri Multipurpose Dam
Reservoir
The prime objective of this Project is to decrease sediment influx into
the Wonogiri dam reservoir to retain the reservoir capacity as much as
possible for flood control, and stable water supply for irrigation,
domestic and industrial use and hydropower generation. To this end, the
following 3 components will be examined in this study:
1) Construction of two check dams on the Kali Kuduang just before the
river enters into the reservoir.
2) Sediment dredging in front of the intake. (100,000m3)
3) Supply of a unit of sediment removal system comprising dredger, working
boat, discharge pipes and accessories. |
BD |
2001 |
|
Indonesia |
JICA |
Study on Rural Water Supply in Nusa Tenggara Barat and Nusa Tenggara
Timur
The study aims to formulate a strategy and implementation plan for
rural water supply (groundwater and springs in the area), and to review
and give recommendations on operation & maintenance services for
sustainable water supply management. |
MP, FS, BD |
2001 |
|
Indonesia |
JICA |
Sector Assistance Strategy Formulation Study on Agriculture and Fishery
Sector
Consists of
- Evaluation of the 3rd umbrella-cooperation in the agriculture sector
(completed Oct. 2000)
- Sector analysis of agriculture and fishery in Indonesia, and to develop
a cooperation plan in this sector to be carried out by Japanese aid. |
S |
2001 |
|
Indonesia |
JBIC |
Infrastructure Rehabilitation Projects (Package C)
The purpose of the project is to examine seven projects in the water
resource and irrigation sector and two projects in the port sector. These
were all found to be in need of rehabilitation in the previous study
packages A and B of completed infrastructure projects financed by ODA
loans.
The present study will provide support for adopting specific measures and
putting in place supervisory arrangements in implementing rehabilitation
work aimed at strengthening project operation, maintenance and control. |
SAPS |
2001 |
|
Indonesia |
JBIC |
Establishment of Geographic Information System for DKI Jakarta Project
The purpose of the project is to build up a geographic information
system for DKI Jakarta, thereby contributing to the urban development plan
and urban infrastructure management. The project also will help refine and
improve comprehensive local administrative services including collection
of fixed assets tax. Although basic functions of the geographic
information system are currently serviceable, the inability to add and
update data in an appropriate manner is posing an impediment to the
provision of services as a whole.
The study will verify the current system operations, analyze the cause of
the problems, and on the basis of these findings, will organize a workshop
to make recommendations on how to improve the system. |
SAPS |
2001 |
|
Indonesia |
JBIC |
24 Infrastructure Rehabilitation Projects (Package A)
Some of the infrastructure projects supported by the ODA loans have
been in operation for long periods of time after completion and are in
need of restoration and rehabilitation due to natural disasters and other
reasons. The purpose of the project is to restore and rehabilitate the
existing infrastructure, which is regarded as a priority by the government
of Indonesia.
The study will conduct technical and other examinations required for
rehabilitation work, with regard to the projects supported by ODA loans
and whose need for rehabilitation has been approved. |
SAPS |
2001 |
|
Indonesia |
Government/JBIC |
Study on Policy Reform in Water Resources Sector (WATSAL)
Objectives are to improve national institutional framework for water
resources development and management, organizational and financial
framework for river basin management, regional water quality management
regulatory institutions and implementation, and national irrigation
management policy, institutions and regulations. |
S |
2000-2001 |
|
Indonesia |
Government/JBIC |
Sector Program Loan for Water Resources Development Project
Monitoring services for project implementation and technical services
for design review.
The major objectives of the project are to achieve:
a) tangible and quick effects on employment generation,
b) food security, and
c) protection of socially vulnerable groups caused by economic crisis. |
S, DD, CS |
1999-2001 |
|
Indonesia |
Government/JBIC |
Agricultural Development Project II (ADP-II)
Assistance in the design location selection, supervision and
implementation of estate crop development (18 Provinces and 12
Commodities), Rehabilitation of production and collection roads in nucleus
estate and smallholder project (9 Provinces and 19 Sites). |
DD, CS |
1997-2001 |
|
Indonesia |
Government/JBIC |
Integrated Horticulture Development in Upland Areas (IHDUA)
Feasibility study, project management and technical assistance on
horticulture development in Java, Sumatra, Sulawesi, Kalimantan, East and
West Nusa Tenggara, Riau, Jambi, Lampung and D.I. Aceh.
Major components of the Project includes all the necessary activities
comprising preparatory works, infrastructure improvement and development,
procurement of agricultural input and quality seed development equipment,
training, and consulting services. |
FS, DD, CS |
1995-2001 |
|
Indonesia |
Government/ADB
Government/JBIC |
Wonorejo Multipurpose Dam Project
Construction of Wonorejo Dam and Segawa Dam in order to supply raw
water to Surabaya and its vicinity for domestic and industrial use, flood
control for the downstream area of the Song and the Gondang rivers and
power generation.
<Wonorejo Dam>
Reservoir:
- Catchment area: 126.3 km2 incl. the Segawe basin
- Annual mean runoff: 8.1 m3 /s
- Reservoir Area: 3.85 km2 at HWL
Dam:
- Type of dam: Zoned rockfill, with center core
- Dam height: 100 m
- Crest length: 545 m
<Wonorejo Power Station>
- Diameter of penstock: 1.9 m
- Length of penstock: 195 m
- Turbine: 1 unit x 6.3 MW, Horizontal Francis type
- Generator: 1 unit x 7 MVA
- Max. discharge: 12.0 m3/s
- Annual energy output: 31.7 GWh
Transmission Line:
- Voltage: 70 kV
- Length: 13 km
<Segawe Diversion Scheme>
Intake Weir:
- Catchment area: 82.8 km2
- Annual mean runoff: 6.4 m3/s
- Weir type: Gated weir
- Discharge capacity: 530 m3/s
<Tiudan Water Conveyance System>
Tiudan Headworks:
- Type: Gated weir
- Crest elevation: El. 102.0 m
- Height: El. 12.0 m
- Gate: 4 nos. 5.8 m H x 6.5 m W
Canal:
- Type: Open trapezoidal canal
- Length: 3.6 km including an aqueduct
- Flow capacity: 15.0 m3/s
<Tulungagung Pumping Station>
Pump:
- Type: Vertical shaft mixed flow
- Unit: 3 nos.
- Capacity: 225 m3/min./unit- Dia.: 1.35 m |
FS
DD
CS |
1981-1982
1992-1995
1994-2001 |
|
Indonesia |
Private Company |
Cikarang Hijau Indah Industrial Estate Development Preliminary Study
Study on the development viability of the Industrial Estate in the
Cikarang Hijan Indah Area (230 ha). |
S |
2000 |
|
Indonesia |
JICA |
Integrated Agricultural and Rural Development in Highland Area
Master plan and feasibility study for selected 8 model areas in Ban
dung on the integrated agricultural development in highland area a.s a
model for further upland agriculture development. |
MP, FS |
1999-2000 |
|
Indonesia |
Government/JBIC |
Sector Program Loan for Agriculture and Forestry Sector
Monitoring services for project implementation and technical services
for design review.
The project comprises following subprojects:
a) Flood crops production development for sustaining food security
b) Rehabilitation of blackish water shrimp culture infrastructure
c) Shrimp and fish hatcheries improvement
d) Fishing ports development
e) Infrastructure development for poultry rural rearing multiplication
center
f) Slaughterhouse development
g) Social forestry development program
h) Rural infrastructure development for estate crops area
Sector Program Loan (SPL) in Water Resources Development (WR-SPL) |
S, DD, CS |
1998-2000 |
|
Indonesia |
Government/ADB |
Integrated Irrigation Sector Project II (IISP-II)
Rehabilitation and upgrading of irrigation and drainage system (45,000
ha), development of new irrigation schemes (5,000 ha), land development
activities (4,500 ha), and efficient O&M (110,000 ha), as well as
assistance in transfer of small irrigation schemes (less than 500 ha)
under the governmental programme in North Sumatra, South East Sulawesi,
Bali, and West Nusa Tenggara Province. |
FS, DD |
1995-2000 |
|
Indonesia |
Government/JBIC |
Major and Minor Drainage Improvement Works in Surabaya Urban
Development Project
Drainage improvement for Gurungsari canal and Diversion channel in
Southern and Western part of Surabaya. |
CS |
1994-2000 |
|
Indonesia |
Government/JBIC |
Road Rehabilitation Project III
Project management support, consulting services for construction
supervision and transfer of technology of rehabilitation works for about
1,500 km of roads which consist of pavement improvement by overlay and
improvement of shoulders and side drainage ditches in 8 provinces of
Sumatra and West Java. |
DD, CS |
1994-2000 |
|
Indonesia |
JICA
Government/JBIC |
Gilirang Irrigation
Master plan and feasibility studies and detailed design for
agricultural infrastructure development project.
Dam: 132 MCM, rockfill, H=44.5 m, L=230 m
Main canal: 47.5 km
Secondary canal: 37.2 km |
MP, FS
DD |
1994-1995
1998-2000 |
|
Indonesia |
JBIC
Government/JBIC |
Way Sekampung Dam and Irrigation
Batutegi: rockfill, H=120 m
Dam: V=9,000,000 m3, Crest Length=590 m
Power: 24 MW
Irrigation: 76,790 ha in total |
SAPROF
DD, CS |
1991-1992
1994-2000 |
|
Indonesia |
Government/ADB |
Tanggari II Hydroelectric Power
Tondano lake and cascade development
Power: Run-of-river type, 19,000 kW
Tanggari II Hydroelectric Power
Net head: 123.1 m
Rated discharge at weir: 18.5 m3/s
Mean discharge at weir: 9.76 m3/s
Surface power station
installed capacity: 19.0 MW
firm energy: 79.7 GWh/year
secondary energy: 12.3 GWh/year
average energy: 92.0 GWh/year
Transmission lines: 3.8 km |
BD, DD
CS |
1990-1998
1994-2000 |
|
Indonesia |
Government/JBIC |
Project Type Sector Loan for Water Resources Development
Evaluation, monitoring, technical assistance and formulation of
possible subsequent project for rehabilitation/completion/upgrading of
medium and small irrigation of 38 schemes, 100,285 ha of village
irrigation schemes, 7 schemes of swamp development, 32 schemes of pond
water resources conservation and 8 schemes of flood control and river
works. |
S, DD, CS |
1997-1999 |
|
Indonesia |
Government/IBRD |
Hydro Inventory and Pre-feasibility Studies
Updated hydroelectric and pumped storage inventories, formulated a long
term strategy for hydro-resource development and identification of
priority schemes. |
S |
1996-1999 |
|
Indonesia |
JICA
Government/Grant |
Cooperative Rural Electrification in Aceh
Integrated cooperative rural electrification development in Aceh and
construction of small hydropower plant in Aceh province. |
MP, FS
BD
DD, CS |
1993-1994
1996-1997
1997-1999 |
|
Indonesia |
Government/JBIC |
Ujung Pandang Port Urgent Rehabilitation
Detailed design and construction supervision of container terminal and
multi-purpose berth including container marshaling yard, CFS, maintenance
shop, administration building etc.
The container terminal of Hatta Quay has planned to handle 600,000 TEU/yr.
Container Berth 670 m x -10.0 m
Multi-purpose Berth 180 m x -10.0 m
Container Yard 130,000 m2
Dredging 1.6 mill. cu.m
Reclamation 2.1 mill. cu.m |
DD, CS |
1992-1999 |
|
Indonesia |
JICA |
Agricultural Teacher and Youth Farmer Training Center Project
Basic Design for Implementation of Agricultural Training Center at
Mataram in Lombok Island in West Nusa Tenggara.
Project site 3,000 ha |
BD |
1998 |
|
Indonesia |
Private Company |
Preliminary Survey of Siguragura & Tangga Power Stations
Inspection of the tunnels and hydromechanical equipment for the
Siguragura and Tangga power stations.
Siguragura P/S: Headrace Tunnel (D=6 m, L=983 m), Tailrace Tunnel (D=6.1
m, L=448 m), Draft Tunnel (D=8.7 m, L=38 m)
Tangga P/S: Headrace Tunnel (D=6.1 m, L=1,616 m) |
S |
1998 |
|
Indonesia |
JICA |
Assessment Study on Interim of Bush Fire Prevention Project in
Indonesia
Implementation of assessment study on interim of the bush fire
prevention project in Indonesia using the PCM methods. |
S |
1998 |
|
Indonesia |
JICA |
The Improvement in Quality of the Tropical Fruits
Master plan for each four provinces (238,000 km2) to
increase small scale farmers' income through improvement in quality of the
target tropical fruits correspond to need for supply for domestic and
international market.
Study area: North Sumatra, West Java, East Java, South Sulawesi |
MP |
1997-1998 |
|
Indonesia |
JICA |
The Study on Comprehensive Management Plan for the Water Resources of
the Brantas River
Formulation of a comprehensive water resources management plan for the
Brantas River basin including a structural development plan for
appropriate water use management.
Catchment area: 11,800 km2
River length: 320 km |
MP |
1996-1998 |
|
Indonesia |
Government/JBIC |
Monitoring, Evaluation and Technical Assistance of Agricultural
Development Project (ADP)
The project comprises the following subprojects:
a) Land development,
b) Rehabilitation of collection and production road,
c) Establishment of group processing centers,
d) Estate crop development in special areas, and
e) Fish landing ports development in Eastern Indonesia
Scope of works:
i) Monitoring of whole subprojects
ii) Post-evaluation of the subprojects a), b), c) and d)
iii) Technical assistance for implementation of sub-project a) |
DD, CS |
1995-1998 |
|
Indonesia |
Government/JBIC |
Small Scale Irrigation Management Project (SSIMP) - II
Surface water irrigation subproject (9 subprojects)
Sumbawa groundwater irrigation subproject
Osao groundwater irrigation subproject |
S, DD, CS |
1995-1998 |
|
Indonesia |
Government/IBRD |
Provincial Irrigated Agriculture Development Project (PIADP)
Project management for completion and development of on-going small
scale irrigation schemes, 129 ongoing schemes in 13 provinces. |
CS |
1992-1998 |
|
Indonesia |
Private Company |
Karawang Utama Industrial Estate Development
Establishment of an industrial estate and EPZ in West Karawang, Greater
Jakarta
Total development area: 1,050 ha
Development was divided to 3 Phases which each phase consist of 305 ha |
S
DD, CS |
1991
1992-1998 |
|
Indonesia |
Private Company |
MM2100 Industrial Town (Bekasi Area Cibitung Industrial Estate
Development)
Industrial estate development in Greater Jakarta
Development area of phase 3: 440 ha
Water purification plant: 30,000 m3/day
Sewerage treatment plant: 27,000 m3/day
Total development area: 1,000 ha |
FS
DD, CS
DD, CS |
1989-1990
1989-1992
1996-1998 |
|
Indonesia |
JICA |
Greater Jakarta Urban Drainage and Waste Water Disposal
Improvement of urban drainage and development of integrated sewerage
system in Jakarta metropolitan area.
Study area: 650 km2
Channel Improvement and Construction: 87.5 km
Pump Station Construction: 2 pump stations
Sewerage Development Area: 16,604 ha, 140 villages
Treatment Plant: 6 places, 160 ha (in total) Served Population 6,449,000 |
MP, FS
DD |
1989-1991
1996-1998 |
|
Indonesia |
JICA
Government/JBIC |
Bila Irrigation
Dam: Rock-fill, H=30.5 m, L=230 m
Irrigation: 9,800 ha, main canals 27.5 km, secondary canals 117 m, main
and secondary drains 86.5 km |
FS
DD
CS |
1981-1982
1986-1989
1991-1998 |
|
Indonesia |
Private Company |
Deltamas City Development Project
Review of the existing master plan (3,600 ha) and basic and detailed
design for the first phase (360 ha) on residential estate development in
Bekasi area. |
BD, DD |
1997 |
|
Indonesia |
IBRD |
Asahan No. 3 Hydroelectric Power Project
Review and up-dating of the existing feasibility study and study on
environment and resettlement.
Main dam: zoned rockfill, 129 m high, 365 m long 9,200,000 m3
in volume
P/S: aboveground, 100 MW x 4 units |
Review of F/S |
1997 |
|
Indonesia |
Government/ADB |
Merangin-2 Hydroelectric Power Plant
Preparation of detailed engineering design for development of
hydroelectric power plant (Concrete weir dam, V=72,950 m3,
underground powerhouse 88 MW). |
DD |
1996-1997 |
|
Indonesia |
JBIC |
Riam Kanan Irrigation
Improvement of the water management method and strengthening the
agricultural activities. |
SAPS |
1996-1997 |
|
Indonesia |
JICA |
Revision of Jakarta Water Supply Development Master Plan
Review of existing plan and progress of the project for establishing
plan up to year 2019 on water supply project in development Jakarta
Metropolitan Area. |
MP, FS |
1995-1997 |
|
Indonesia |
JICA |
Comprehensive Water Management Plan in JABOTABEK
Preparation of water management plan including flood control for
JABOTABEK area (Jakarta Metropolitan Area, Bogor, Tanggerang, and Bekasi
provinces). |
MP, FS |
1995-1997 |
|
Indonesia |
Government |
Kesamben Hydroelectric Power
Review and analysis on previous study and future demand, and
preparation of suitable implementation plan to expand the capacity of
existing plant on Karangkates dam reservoir. |
FS |
1995-1997 |
|
Indonesia |
JICA
Government/Grant |
Reservoir (Embung) Project in East Nusa Tenggara II
Formulation of basic planning for rural development in small scale
impounding, and feasibility study for priority development area selected.
Detailed design and construction supervision for embung, irrigation canals
and rural water supply facilities. |
BD
DD, CS |
1994-1995
1996-1997 |
|
Indonesia |
JICA |
Integrated Air Quality Management in Jakarta Metropolitan Area
Preparation of an air pollution central strategy until 2010 in
consideration of socio-economic conditions, and a more concrete action
plan until 2000. |
FS |
1994-1997 |
|
Indonesia |
Government/ADB |
ADB Eleventh Road-Road Betternment and Bridge Replacement Program
Construction of 127 bridges comprising in excess of 5,000 lineal meters
and upgrading of existing national and provincial roads totaling some
2,300 km throughout the 13 provinces. |
CS |
1992-1997 |
|
Indonesia |
Government/JBIC |
The Urgent Rehabilitation of Ferry Terminals in East Java and Bali
Island
Construction, rehabilitation, and maintenance of 5 ferry terminal
facilities:
Ujung Terminal 650 GT x 1B
Kamal Terminal 650 GT x 1B
Ketapang Terminal 2,000 GT x 2B
Gilimanuk Terminal 2,000 GT x 2B
Padang Bai Terminal 1,000 GT x 1B |
DD, CS |
1991-1997 |
|
Indonesia |
Government/JBIC |
Pamarayan-Ciujung Irrigation System Rehabilitation
Construction of a new intake barrage, improvement of existing
irrigation and drainage systems and roads, and provision of equipment for
barrage operation and maintenance.
Irrigation: 24,200 ha |
DD, CS |
1989-1997 |
|
Indonesia |
Government/JBIC |
Way Rarem Dam and Irrigation
Reservoir:
Catchment area (damsite) 328 km2
Gross storage capacity 72,400,000 m3
Effective storage capacity 68,000,000 m3
Dam:
Type rockfill, center core type
Height 31 m
Crest length 1,450 m
Embankment volume 1,100,000 m33
Irrigation:
Net irrigation area 22,000 ha
Main irrigation canals 65.3 km
Secondary irrigation canals 157.7 km
Tertial canals 792 km |
FS
DD
CS
OM |
1975-1976
1977
1979-1991
1992-1997 |
|
Indonesia |
Private Company |
Container Terminal Development in Batam Island Project
Pre-investment study including review of container tariff system and
set-up of financial analysis base.
Phase I: 1998, Vessels 1,400,000TEU, L=2,100m, D=15m
Phase II: 2002, Vessels 2,025,000TEU, L= 3,000m, D=15m
Phase III: 2015, Vessels 3,000,000TEU, L=3,000m, D=15m |
S |
1994-1996 |
|
Indonesia |
JICA |
Kampur Indragiri River Basin Integrated Development
Overall development plan of Kampur-Indragiri river basin to year 2019. |
MP, FS |
1993-1996 |
|
Indonesia |
Government/JBIC |
Mt. Kelud Urgent Volcanic Disaster Mitigation
Testing and investigation, assistance in supervision of construction
works at the site, and transfer of knowledge to counterparts. |
DD |
1992-1996 |
|
Indonesia |
Government/JBIC |
Jakarta Water Supply
Technical assistance in institutional development and project
management for executing detailed design and construction supervision of
water distribution network rehabilitation and in fill extension works. |
DD, CS |
1992-1996 |
|
Indonesia |
Government/JBIC |
East Jakarta Flood Control
Construction of Eastern Banjir canal (upper and middle reaches),
improvement of Buaran river, Terusan Sunter, Marunda drain and Sunter and
Cipinang rivers.
Stage 1
- Eastern Banjir Canal: upper stretch: 5.4 km, design flood: 100-year
- Salinity control barrage: 1 nos.
- Buaran River improvement: lower reaches: 5.6 km, design flood: 25-year
Stage 2
- Eastern Banjir Canal: middle stretch: 8.0 km, design flood:100-year
- Marunda Drain: 5.5 km, Design flood: 25-year
- Improvement of Suntar and Cipinang Rivers: 7 km, Design flood: 25-year
- Tersan Suntar Drain: 7.6 km, Design flood: 25-year |
DD, CS |
1988-1996 |
|
Indonesia |
JICA
Government/JBIC |
Komering Irrigation
Komering-I area: Construction of new irrigation and drainage system;
35,290 ha
Belitang area: Rehabilitation of existing irrigation and drainage system;
19,890 ha |
FS
DD
CS |
1980-1981
1985-1989
1991-1996 |
|
Indonesia |
JICA |
Embung (Small Scale Impounding Pond) Development
Existing and potential Embung Development Project in the study area and
feasibility study for priority project(s). |
MP, FS |
1994-1995 |
|
Indonesia |
Government/ADB |
Flores Emergency Reconstruction (Roads and Bridge Component)
Emergency reconstruction of road and bridges damaged by earthquake in
Flores 4 provinces.
Road length: 337 km in total
Bridge: 15 (314 m in total) |
DD, CS |
1994-1995 |
|
Indonesia |
JICA |
Metropolitan Area Environmental Master Plan
Formulation of a total master plan for the improvement of urban
environment. |
MP |
1994-1995 |
|
Indonesia |
Government/ADB |
Sumatra Irrigation Agricultural Development Project (SIADP)
Phase I: Project Inventory and Feasibility Study
Phase II: Detailed Design |
FS, DD
|
1993-1995 |
|
Indonesia |
JICA |
Ciujung - Cidurian Integrated Water Resources Development
Development of water conveyance system to supply domestic and
industrial water to the Jabotabek area from the Ciujung - Cidurian. |
FS |
1993-1995 |
|
Indonesia |
Government/JBIC |
Ular River Basin Flood Control and Improvement of Irrigation Project
Project area: 45,000 ha, Irrigation area: 18,500 ha
Main canal: 46.68 km, Secondary canal: 155 km |
DD, CS |
1991-1995 |
|
Indonesia |
Government/ADB |
Nusa Tenggara Agricultural Development
Construction and rehabilitation of Pengga dam and irrigation systems.
Irrigation system area: 22,255 ha in total
HLD extension: 4.8 km |
DD, CS |
1990-1995 |
|
Indonesia |
JBIC
Government/JBIC |
Small Scale Irrigation Management Project (SSIMP) - I
Incremental agricultural production through improvement of irrigation
management.
Tiu Kulit Dam Irrigation subproject, West Nusa Tenggara 1,700 ha
Oesao Groundwater Irrigation subproject, East Nusa Tenggara 600 ha |
SAPROF
S, DD, CS |
1988-1989
1990-1995 |
|
Indonesia |
JICA
Government/JBIC |
Upper Solo River Improvement and Madiun River Urgent Flood Control
Improvement of 22 km long section of the Madiun River, improvement of
river sections at the confluence of 4 tributaries, and construction of 3.8
km long short cut channel.
Excavation: 3,793,000 m3, Embankment: 1,882,000 m3,
Revetment: 5.9 km, Drainage Ditch: 59.5 km and
Bridge: 5 nos. |
FS
DD, CS |
1980
1987-1995 |
|
Indonesia |
JICA
Government/JBIC |
Langkeme Irrigation
Irrigation: 6,400 ha, 4 weirs, water diversion canals 39.6 km, main
canals 30.0 km |
FS
DD
CS |
1980-1981
1983-1985
1988-1995 |
|
Indonesia |
Private Company |
CCM Balraja Industrial Estate Project (PT. Cipta Cakra Murdaya)
Master plan for 300 ha industrial estate, and detailed design of
infrastructures and related facilities for first stage (20 ha) of the
industrial estate development. |
MP, DD |
1994 |
|
Indonesia |
Government/JBIC |
Porong River Rehabilitation
Improvement and rehabilitation of damaged river structures along Porong
river channel including protection of Porong bridge and improvement of
inspection road.
River channel length: 51 km |
DD, CS |
1989-1994 |
|
Indonesia |
JICA |
Rural Area Photovoltaic Hybrid Systems Utilization Study
Photovoltaic-microhydro and photovoltaic-diesel hybrid power systems
for rural electrification in West Java and West Nusa Tenggara Provinces.
Establishment and operation of test plants. |
FS |
1989-1994 |
|
Indonesia |
Government/JBIC |
Upper Solo River Improvement
Improvement of Upper Solo river channel (6.2 km) and two tributaries
(8.5 km), construction of 2 short-cut channels (4 km).
Excavation: 2,511,000 m3, Embankment: 898,000 m3,
Revetment: 3.7 km, Drainage ditch: 19 km and
Establishment of flood forecasting and warning system |
CS |
1987-1994 |
|
Indonesia |
JICA
Government/JBIC |
Dayeuhkolot Workshop Renovation
Construction and installation of machine tools and equipment and their
initial run for overhaul of hydraulic turbines and generators. |
FS, MP
DD, CS |
1987-1988
1991-1994 |
|
Indonesia |
JICA
Government/JBIC |
Brantas Middle Reaches River Improvement
Total length: 99 km
1st stage:
Design flood discharge: 1,350 m3/s, river bed dredging:
7,088,000 m3/s, levee embankment: 516,000 m3/s
2nd stage:
Design flood discharge: 1,500 m3/s, river bed dredging:
7,525,000 m3/s, levee embankment: 857,000 m3/s,
telemeterized flood forecasting and warning system
Catchment area: 11,800 km2, River length: 320 km |
FS
DD
CS |
1972-1973
1980
1983-1994 |
|
Indonesia |
JICA
Grant
Government/JBIC |
Surabaya River Improvement-Stage I and II
River channel improvement, 5 km stretch for 20-year flood and 19 km
stretch for 5-year flood and rehabilitation of existing 2 dams including
river dredging works. |
MP, FS
DD, CS
FS
DD, CS |
1971-1973
1975-1981
1979
1988-1994 |
|
Indonesia |
Private Company |
Reassessment of the Feasibility on the Century Plaza, Wisman Bank
Dharmala Building, Mega Plaza, ATD Plaza, and Jakarta Regent Hotel
Review and assessment of the present conditions of the ongoing projects
and reevaluation of the projects' feasibility from the viewpoint of
possible financiers and investors. |
S |
1993 |
|
Indonesia |
JICA |
Middle-level Agricultural Technical Training Center
Investigation on the conditions of the center's facility to determine
the causes of deterioration and to formulate and implementation remedial
plan project includes supervising education equipments for training. |
S, CS |
1993 |
|
Indonesia |
JBIC |
Brantas River Basin Water Resources Development Project
Evaluation of pertinency of post-construction project management. |
SAPS |
1992-1993 |
|
Indonesia |
JICA |
National Irrigation Development Formulation Program
Formulation of program incorporating rationale and guideline to the
current and future 5-year development plan in view of sustenance of rice
and basic food grains. |
MP |
1992-1993 |
|
Indonesia |
Private Company |
Sudirman Central Business District
Master consulting services and detailed design of infrastructure for a
new central business district.
Total area: 43.3 ha |
DD |
1992-1993 |
|
Indonesia |
JBIC |
Rice Seed Production and Distribution
Evaluation of sustainability of campaign program and promotion of using
the good quality seed to the farmers. |
SAPS |
1992-1993 |
|
Indonesia |
Government/IBRD |
Second JABOTABEK Urban Development - Major Drainage Works Component
Construction of drainage system for the central part of Jakarta. |
DD, CS |
1991-1993 |
|
Indonesia |
JBIC |
Rural Credit Development and Agricultural Cooperatives Strengthening
Feasibility-level supplemental project study and preparation of an
implementation program. |
SAPROF |
1991-1993 |
|
Indonesia |
JICA |
Southern Sumatera Integrated Regional Development
Integrated regional development in 4 provinces (Jambi, South Sumatra,
Bengkulu, and Lampung Provinces), Southern Sumatera.
Study area: 218,000 km2 |
MP |
1991-1993 |
|
Indonesia |
Government/JBIC |
First Nine Provinces Road Rehabilitation
Project management support, technical support and training/transfer of
knowledge support for the urgent rehabilitation of the existing national
and provincial highways in 9 provinces of Sumatra and West Java.
19-national highway sections: 668.8 km
23-provincial highway sections: 873.9 km |
CS |
1990-1993 |
|
Indonesia |
Government/ADB |
Central Java Groundwater Irrigation Development
Groundwater irrigation development in selected areas (27,500 ha),
preparation of farmer-group pilot investment schemes for groundwater
irrigation, support programs strengthening private drilling contractors
and groundwater abstraction regulation program, training and institutional
development, engineering for production wells and irrigation and drainage
facilities. |
FS, DD |
1988-1993 |
|
Indonesia |
Government/IBRD |
East Java and Sulawesi Groundwater Development I&II
Technical assistance in planning, design and implementation of
groundwater irrigation development in East Java (680 tubewells) and in
Central and South Sulawesi (345 tubewells). |
DD, CS |
1988-1993 |
|
Indonesia |
Government/ADB
Government |
Tulungagung Hydroelectric Power
Power: 1st stage 30,000 kW, 2nd stage 16,000 kW |
FS, DD
CS |
1984-1989
1990-1993 |
|
Indonesia |
Environment Agency, Japan |
Study on Strategic Response Against Global Warming and Climate Change
Case study on countermeasures for global warming in Indonesia. |
S |
1991-1992 |
|
Indonesia |
Government/JBIC |
Sembayat Barrage
Review of previous study and detailed design for river improvement and
flood control on the Solo River basin. |
FS, DD |
1991-1992 |
|
Indonesia |
JICA |
Cidanao and Cibanten River Basins Water Resources Development
Municipal and industrial water supply to Cilegon area.
Project target year: 2000 |
FS |
1990-1992 |
|
Indonesia |
Government/JBIC |
Mamak Mini Hydroelectric Power
Hydropower generation using available head of Mamak irrigation dam.
Power: 500 kW |
CS |
1990-1992 |
|
Indonesia |
Government/ADB |
Third Irrigation Sector Project-Teluk Lada Irrigation
Rehabilitation and improvement of irrigation facilities, and flood
control including drainage improvement in Teluk Lada area, West Java.
Project area: 7,500 ha |
DD, CS |
1988-1992 |
|
Indonesia |
Government/ADB |
Mamak Dam and Irrigation
Dam: Rockfill, H=41.5 m, V=436,000 m3 and 3 saddle dams
Irrigation: Mamak System 3,884 ha, Kakiang System 1,544 ha |
DD, CS |
1988-1992 |
|
Indonesia |
Government/ADB |
Local Development Project, Rural Roads II - Bali and West Nusa Tenggara
Provinces ADB Eighth Road
Technical advisory services, construction supervision and equipment
management.
Total road length: 2,370 km including 1,000 bridges |
CS |
1987-1992 |
|
Indonesia |
Government/IBRD |
Central and West Java Provincial Irrigation
Training and coordination consulting to assist and strengthen project
staff and organization for programming, investigating, studying,
designing, undertaking, and operation and maintenance of irrigation
projects. |
FS, DD, CS |
1987-1992 |
|
Indonesia |
JICA
Government/JBIC |
Riam Kanan Irrigation
Net area 32,610 ha (swamp area 15,000 ha), main canals 48.8 km,
secondary canals 276 km, main drains 53 km, secondary drains 221 km |
FS
DD
CS |
1978-1979
1980-1983
1986-1992 |
|
Indonesia |
Government/JBIC
JICA
Government/JBIC |
Riam Kanan Multipurpose Dam
1st stage:
Dam: Earth-fill, H=56 m, V=820,000 m3,
Power=30,000 kV (Diesel Power: 500 kW x 2 nos.)
T/L: 70 kV/54 km, Irrigation: 32,000 ha
2nd stage:
No.3 power unit installation: 10,000 kW |
FS, DD, CS
FS
DD, CS
|
1961-1974
1978-1979
1980-1992 |
|
Indonesia |
Private Company |
Cikande Industrial Park Development
Advisory services in physical survey and demand analysis and review of
master plan and feasibility study for the development of Cikande
Industrial Park, which is located 50 km west of Jakarta.
Project site: 600 ha |
MP, FS |
1991 |
|
Indonesia |
JBIC |
Lower Bengawan Solo Basin Flood Control
Feasibility-level supplemental project study and preparation of an
implementation program. |
SAPROF |
1991 |
|
Indonesia |
Japanese Government |
Central Kalimantan Swamp Improvement
Irrigated agriculture development in swamp area in Central Kalimantan. |
S |
1991 |
|
Indonesia |
Government/ADB |
Access Channel Optimization Study and Review for Master Plan of Benoa
Port
Review and updating of existing master plan for Benoa port development. |
MP, FS |
1990-1991 |
|
Indonesia |
JICA |
Surabaya-Mojokerto Toll Road
Construction of 39 km long toll road section in East Java. |
FS |
1990-1991 |
|
Indonesia |
JICA |
Nias Island Irrigated Agricultural Development
Irrigated agricultural development in Nias Island, North Sumatera.
Study area: 14,000 ha |
FS |
1990-1991 |
|
Indonesia |
Private Company |
Terboyo Industrial Park Semarang Development
Technical assistance in construction supervision and contract
management for 1st stage development (67 ha). |
DD, CS |
1990-1991 |
|
Indonesia |
Government/JBIC |
South Sumatera Road Rehabilitation
Road improvement between Lubuklinggau and Kotabumi.
(Total road length 467.4 km, bridge replacement 26 sites, landslide
protection 13 sites) |
DD, CS |
1987-1991 |
|
Indonesia |
Government/JBIC |
Mt. Semeru Urgent Rehabilitation -Volcanic Debris and Mud Flow Control
Sabo dam rehabilitation: 2 dams 12,700 m3
River excavation: 4 river stretches 1,282,000 m3
Levee embankment: 4 river stretches 11.1 km |
DD, CS |
1985-1991 |
|
Indonesia |
Government/JBIC |
West Jakarta Flood Control
Flood damage mitigation (25-year flood) in West Jakarta and its
surrounding area (8,200 ha).
1st phase 752 ha, 2nd phase 2,540 ha, 3rd phase 4,908 ha and Total 8,200
ha |
DD, CS |
1985-1991 |
|
Indonesia |
Government/ADB |
Tes No.1 Hydroelectric Power Development
Rehabilitation and extension of existing hydropower plant harnessing
Lake Tes and Ketaun river.
Power: 15,000 kW |
DD, CS |
1984-1991 |
|
Indonesia |
Government/JBIC |
Lower Jeneberang River Urgent Flood Control
River channel improvement, establishment of flood forecasting and
warning system, and flood drainage improvement in Ujung Pandang city.
River improvement
Design flood discharge: 2,100 m3/s - 2,300 m3/s
River channel improvement: Dredging 60,000 m3, Excavation
730,000 m3, Dike 9,040 m, Revetment 2,370 m
Drainage improvement: Design discharge, 10.5 m3/s - 30.0 m3/s
Drainage channel improvement: Dredging 50,000 m3, Excavation
40,000 m3, Revetment 27,600 m |
DD
CS |
1983-1984
1987-1991 |
|
Indonesia |
JBIC |
Semarang Port Development
Post construction appraisal and project sustainability study. |
S |
1990 |
|
Indonesia |
JICA |
Air Selagan Irrigation
Irrigated agricultural development for stable and incremental paddy
rice production in Selagan river basin.
Study area: 23,000 ha |
FS |
1989-1990 |
|
Indonesia |
ADB |
Medan Urban Transportation Study
Integrated multi-modal urban transport development and management in
Medan metropolitan region, including preparation of urban road improvement
and traffic management action plan and public transport improvement action
plan, and establishment of urban transport data base. |
MP, FS |
1989-1990 |
|
Indonesia |
JICA |
Center for Development of Appropriate Agricultural Engineering
Technology
Assistant the Ministry of Agriculture develop farm machinery suitable
for Indonesia farmers. Project includes supervising education equipments
for training. |
CS |
1989-1990 |
|
Indonesia |
Government/JBIC |
Lower Asahan River Flood Control
Improvement of 43 km long section of the Asahan River against 1,100 m3/s
flood discharge and 19 km long section of the Silau River against 1,200 m3/s
flood discharge, and detailed design for flood forecasting and warning
system. |
DD |
1988-1990 |
|
Indonesia |
Private Company |
JABOTABEK Area Telecommunication Network Development
Telephone network development in the JABOTABEK area to year 2004. |
MP, FS |
1988-1990 |
|
Indonesia |
JICA |
Mechanized Agricultural Farming Center
Development of a 3-ha (new development: 1.4 ha, rehabilitation of
existing farm plants: 1.6 ha) mechanized agricultural farming center with
irrigation and other necessary facilities.
Sore house 128 m2
Dam: Rockfill, H=41.5 m, V=436,000 m3 and three saddle dams
Irrigation: Mamak system: 3,884 ha, Kakiang System: 1,544 ha |
DD, CS |
1988-1990 |
|
Indonesia |
|