Country |
Client/Finance |
Project |
Services |
Period |
|
Afghanistan |
JICA |
Project Formulation Study for Recovery and Reconstruction (Human
Resources Development & Capacity Building Sector)
Study on the current status and identification of problems of human
resources development and education sector, especially from the viewpoint
of capacity building of the people in charge of country reconstruction and
recovery, to formulate future technical assistance programs in this
sector. |
S |
2002 |
| Bangladesh |
DANIDA |
Technical Review of the Rural
Development Project RDP-16 Phase II The main
activities of RDP-16 Phase II are to:
rehabilitate and maintain a number of selected economically sustainable
transport networks and associated markets in the project area;
assist in the long term development of a sustainable local maintenance
capability;
develop a sustainable employment opportunities programme for targeted local
groups which will have a particular focus on Women in Development
activities.
Implementation of the project is carried out through the Local Government
Engineering Department (LGED) of the Ministry of Local Government Rural
Development and Co-operatives (MLGRDC). |
TR |
2001 |
|
Bangladesh |
JBIC |
Rehabilitation of Caustic Soda Factory in Chittagong
Study on environmental pollution measures for pulling down the caustic
soda factory |
S |
1998 |
|
Bangladesh |
JICA |
Construction of Revetment on the Bank of Meghna River
Revetment works on the Meghna Bridge site for protection for Meghna
Bridge against erosion and deposition. |
BD |
1997-1998 |
|
Bangladesh |
JICA
Government/Grant |
Meghna and Meghna Gumti Bridge Construction
Meghna Bridge
Type: PC box girder (max. span 87 m), Length: 930 Width: 9.2 m, Approach
road: 1,965 m in total length
Meghna-Gumti Bridge
Type: PC box girder (max. span 90 m), Length: 1,480 m, Width: 9.2 m,
Approach road: 1,430 m in total length |
FS
DD, CS |
1984-1985
1985-1996 |
|
Bangladesh |
JICA |
Industrial Development Study of Chittagong Region
Formulation a comprehensive plan for industrial development of
Chittagong Region with a view of vitalization and modernization of the
national economy up to year: 2005. |
FS |
1994-1995 |
|
Bangladesh |
JBIC |
Paksey Bridge Construction
Survey and investigation for construction of a highway bridge over
Ganges River (PC Box Girder, 1,800 m in length) |
SAPROF |
1993-1994 |
|
Bangladesh |
JICA
Government/Grant |
Construction of Revetment on the Bank of Meghna River
Protection of the existing revetment in Camille side to project the
Mooney Bridge and its access road against scouring. |
BD
DD, CS |
1992
1992-1993 |
|
Bangladesh |
JICA |
North West Region Flood Protection and Drainage Improvement
Japan/UK joint master plan study for region-wide flood control and
feasibility study for selected options.
Study area: 34,200 km2 |
MP, FS |
1991-1993 |
|
Bangladesh |
JICA |
Kurigram Irrigation and Flood Control-South Unit
Formulation of irrigation and drainage development and flood control
plan.
Net area: 63,000 ha |
FS |
1991-1993 |
|
Bangladesh |
ADB |
South East Region Water Resources Development
Land and water resources development to support regional agricultural
production for food grain self-sustenance.
Study area: 9,000 km2 |
FS |
1990-1993 |
|
Bangladesh |
JBIC |
Dhaka Container Terminal
Plan of construction of a container terminal (8 ha), general cargo
jetty (3 ha), and across road (4.8 km). |
SAPROF |
1992 |
|
Bangladesh |
JICA |
Model Rural Community Development
Development of model area rural community.
Phase I: Kachua, Nabinagar, Bancharampur and Debidwar districts, Comilla
(106,450 ha)
Phase II: Homna and Daudikandi districts, Comilla (Study area: 550 km2) |
MP |
1990-1991 |
|
Bangladesh |
JICA |
Dhaka-Narayanganj Container Terminal Development
Stagewise development of Dhaka port container terminal (1st stage
development scheme).
Annual throughput: Year 1995; 69,000 TEUs |
MP, FS |
1989-1991 |
|
Bangladesh |
Government/ADB |
Power Transmission and Distribution
T/L: East-West intertie transmission system 230 kV/27.5 km
D/L: Distribution network expansion in Chittagong |
DD, CS |
1984-1991 |
|
Bangladesh |
Government/JBIC |
Madhapara Hard Rock Mining
Economic review of previously prepared plan for large-scale aggregate
production.
Planned annual output: 1,700,000 tons |
FS |
1989-1990 |
|
Bangladesh |
Government/ADB |
Pabna Irrigation and Rural Development
Flood protection: Flood embankments 121 km
Drainage: 4 pumping stations, drainage channels 419.8 km
Irrigation: 29,000 ha, 2 pumping stations, irrigation canals 170 km
T/L: 35.4 km |
DD, CS |
1980-1990 |
|
Bangladesh |
Government/ADB |
Chittagong Port Land Reclamation Project
Land reclamation (70 ha) by dredging the estuary of Kamaphuli River,
consisting of 43 ha for fertilizer plant, 20 ha for housing lots and 7 ha
for jetty area.
Jetty: 15,000 DWT x 1
Civil Works: Yard pavement, Dredging/Reclamation |
CS |
1982-1983 |
|
Bangladesh |
Government/JBIC |
Goalpara-Barisal Transmission Line
T/L: 132 kV/136 km
Transformer: 10/13.3 MVA 4 units |
DD, CS |
1961-1981 |
|
Bangladesh |
Government |
Beramara Gas Turbine Power Plant
General consultation
Power: 2 x 20 MW |
DD, CS |
1974-1976 |
|
Bangladesh |
JICA |
Jamuna Bridge
|
S |
1972-1975 |
|
Bangladesh |
JICA |
Karnafuli Hydropower Extension
|
S |
1969-1970 |
|
Bhutan |
JICA |
Lhuntsi Mongar Integrated Agricultural Development
Formulation of integrated agricultural development plan in 2 districts
in eastern region of the country, feasibility study on the priority
project and transfer of technology to the government staff. |
FS |
1988-1989 |
|
Bhutan |
JICA
Government/Grant |
National Cash Crop Development
Improvement and modernization of National Seed and Plant Program (NSEPP)
for promotion of export-oriented cash crops. |
FS
DD, CS |
1986-1987
1987-1989 |
|
Bhutan |
JICA
Government |
Agricultural Mechanization
Training center: Total floor area 1,800 m2, Machine shed: 20
m2 |
S
DD, CS |
1982
1983-1985 |
|
India |
Government/JBIC |
Attappady Wasteland Comprehensive Environmental Conservation Project
Overall project coordination in formulating implementation program,
review of survey and detailed design, preparation of special schemes for
poverty prevention and project monitoring.
Project aims to prevent land degradation through proper forest management,
water resources development and agricultural development, to restore the
wasteland through soil and water conservation measures, and to alleviate
rural poverty through rural infrastructure development. |
PM |
1999-2003 |
|
India |
JBIC
Government/JBIC |
Kurnool-Cuddapah Canal Modernization Project
Special Assistance for Project Formation (SAPROF), detailed design and
construction supervision for the new irrigation canal construction for
planned area and engineering services for pre-construction and
construction supervision.
Main canal: 305.6 km, Distribution: 825.9 km
localized area: 106,400 ha, Pilot area: 10,000 ha |
SAPROF
DD, CS |
1994-1995
1998-2003 |
|
India |
Government/JBIC |
National Highway No. 5 in Andra Pradesh State
Widening the existing two-lanes carriageway to four-lanes including
strengthening the existing pavement for a length of 79 km. |
CS |
1999-2002 |
|
India |
Government/JBIC |
Simhadri & Vizag Transmission System
400 kV T/L (DC): 330 km
220 kV T/L (SC): 96 km
400/202 kV Substations: 29 Nos.
220/132 kV Substations: 5 Nos. |
DD, CS |
1999-2002 |
|
India |
Government/JBIC |
Rengali Irrigation Project
Overall project management, assistance in procurement procedure,
construction supervision, operation and maintenance, and technical
guidance and training for the irrigated rural and agricultural development
project.
Legt Bank Canal: L=41.31 km, W=18 m, Regulator: 18 nos., Distributor and
Minor Canal: 84 nos., 619 km in total |
DD, CS |
1998-2002 |
|
India |
Government/JBIC |
Manipur Sericulture Projects
Detailed design, tender assistance and construction supervision for
facilities of sericulture and institutional development including gender (WID)
guidance, preparation of O&M manual and system.
Manipur Sericulture Project:
- Mulberry Sector (2,720ha), Eri sector (1,500ha)
- Beneficiaries (30,720) |
DD, CS |
1998-2001 |
|
India |
Government/JBIC |
Madhya Pradesh Sericulture Projects
Detailed design, tender assistance and construction supervision for
facilities of sericulture and institutional development including gender (WID)
guidance, preparation of O&M manual and system.
Madhya Pradesh Sericulture Project:
- Mulberry Sector (3,000ha), Tasar sector (4,000ha)
- Beneficiaries (47,460) |
DD, CS
|
1998-2001 |
|
India |
Government/JBIC
JBIC |
Dhauliganga Hydroelectric Project
Review of feasibility and tender designs, tender assistance services
and review of quality control system and manuals for development of 280 MW
hydropower station with run-of-river power generation. (gross head 311 m,
Dam: H=56 m, concrete faced rockfill dam).
Prepared a basic design of a GLOF (glacier lake outburst flood) Forecast
and Warning System, and prepared technical notes on the detailed design of
a GLOF Forecast and Warning System based on which the implementation
agency could establish GLOF Forecast and Warning System effectively
The study aimed at countermeasures against the GLOF hazards, consisting of
(i) inventory of existing glacier lakes along the Hindu Kush Himalayan,
(ii) monitoring of potential risk lakes for draining, and (iii)
operational early warning mechanism for GLOF hazards. |
DD
SAPI
|
1997-1999
2001 |
|
India |
JBIC |
Study on Glacier Lake Outburst Flood (GLOF) in Upperstream of
Dahauliganga Dam
Study on potential of GLOF and technical assessment to judge whether
dam withstand GLOF. |
S |
2000 |
|
India |
Government/JBIC |
National Highway No. 2 Improvement
Widening of the existing two-lanes section to four-lanes, improvement
of drainage facilities and construction of bridge (51.3 km). |
DD, CS |
1993-2000 |
|
India |
Government/IBRD |
Nathpa Jhakri Hydroelectric Development
Damsite:
- Catchment area (damsite): 49,820 km2
- Maximum power discharge: 405 m3/sec.
- Normal H.W.L: El.1,493.50 m
Dam:
- Type: Concrete gravity type
- Height: 60.5 m
Waterway
- Headrace tunnel: 10.15 m dia. x 27,300 m long
- Surge tank: 21 m dia x 301 m deep
- Penstock line: 4.9 m dia x 633 m long x 3 lines
- Tailrace tunnel: 10.15 m dia. x 1,080 m long
- Gross head: 425 m
Power Station:
- Type: Underground type
- Turbine: Francis type: 6 units
- Installed capacity: 250 MW x 6 units
- Annual energy output: 7,447 GWh/year |
DD, CS |
1990-1999 |
|
India |
JICA |
Feasibility Study on National Highway Bypasses
Pre-feasibility study on bypasses improvement in proposed 10 cities and
feasibility study for high priority 3 bypasses.
Target year: 2002 |
FS |
1997-1998 |
|
India |
JBIC |
Renewable Energy Project
Special Assistance for Project Formation (SAPROF) study for promotion
of accelerated development of renewable energy resources such as small
hydro, solar energy, wind energy, co-generation and bio energy. The
project aims at the improvement in the living conditions and for sustained
development of rural and agricultural areas in India. |
SAPROF |
1997-1998 |
|
India |
JICA
Government/Grant |
Nizamuddin Bridge Construction on NH-24
L=550.0 m, W=22.6 m
Prestressed concrete continuous I beam, Open caisson foundation
Approach road: 750 m in total length |
BD
DD, CS |
1994-1995
1995-1998 |
|
India |
JBIC
Government/JBIC |
Upper Kolab and Upper Indravati Irrigation
Kolab dam: concrete/masonry dam, H=55 m, L=646 m
Main canal: 58.8 km, Irrigation: 48,000 ha, Hydropower: 320 MW
Indravati dam: H=45 m, L=555 m
Main canal: 66 Km, Irrigation: 109,300 ha, Hydropower: 600 MW |
SAPI
CS |
1993
1995-1998 |
|
India |
JBIC |
Madhya Pradesh and Manipur Sericulture Projects
Special assistance for project formulation to up-date of feasibility
study and prepare of implementation program for the phased sericulture
development.
-Madhya Pradesh Sericulture Project:
Mulberry Sector (3,000ha), Tasar sector (4,000ha)
- Manipur Sericulture Project:
Mulberry Sector (2,720ha), Eri sector (1,500ha) |
SAPROF |
1996-1997 |
|
India |
JBIC |
Transmission and Distribution System/Construction of Small
Hydroelectric Power Project
Investigation on sub-projects handled by the Government of India to
clarify of the priority. |
SAPI |
1995 |
|
India |
JICA |
Sharda Canal CAD (Command Area Development)
Rehabilitation and expansion of irrigation and drainage systems in the
Hardoi secondary canal commanding area (3-4 sites, 30,000 ha - 40,000
ha/site). |
FS |
1990-1991 |
|
India |
JBIC |
Power System Improvement and Micro/Mini Hydroelectric Development
Updating of previously prepared feasibility study for improvement of
existing power system by installation of micro/mini hydroelectric plants. |
SAPROF |
1988-1989 |
|
Nepal |
JICA
Government/Grant |
Construction of Sindhuri Road, Section II
Mountainous road construction project from Sindhuri Bazar to Khurkot
(39 km) |
BD
DD
CS |
1999
2000-2001
2000-2004 |
|
Nepal |
JICA |
Project for Extension and Reinforcement of Power Transmission and
Distribution System in Kathmandu Valley (Phase-3)
The project aims to construct new K-3 substation (66/11 kV) and 66 kV
transmission line from existing Siuchatar substation to K-3 S/S to
increase power distribution capacity in Kathmandu. |
BD |
2002 |
| Nepal |
DFID |
Environmental Due Diligence
Visit selected industries and evaluate the environmental
risks and opportunities associated with the Government of Nepal’s programme
to privatise state-owned-enterprises (SOEs)
Assess the potential for levering environmental improvements in industries
subject to divestment
Liaise with stakeholders to assess the knowledge and awareness of
Environmental Due Diligence (EDD) and its potential as an environmental
management tool, within government and outside· Conduct a training needs
assessment of Government and the Consultancy sector and devise appropriate
courses of training in EDD
Make recommendations for targeted support from the UK Government in the
privatisation process, to improve environmental performance in the
privatised industries. |
EDD |
2001 |
|
Nepal |
JICA |
Earthquake Disaster Mitigation in the Kathmandu Valley
Master Plan for Earthquake Disaster Mitigation cooperating with
Government and NGO.
Total studied area: 585 km2 |
MP |
2001-2002 |
|
Nepal |
JICA |
Development of Urban Environmental Strategies in Nepal
Environmental conditions in Katmandu Basin have been deteriorating
rapidly due to urbanization and industrialization. However, effective
approaches to improve the situation have not been identified. In this
Study, a comprehensive review of urban environmental issues in Katmandu
Basin will be made, and strategies to improve urban environment will be
developed. |
S |
2001-2002 |
|
Nepal |
JICA |
Urban Environmental Planning in the Kathmandu Valley in the Kingdom of
Nepal
Technical Assistance to grasp and evaluate environmental conditions and
environmental measures taken.
Also, responsible to propose possible measures for identified
environmental problems and develop its implementation program.
Additionally, responsible to recommend on further cooperation by Japan.
Corresponding to the developed implementation program. |
S |
2001-2002 |
|
Nepal |
JICA |
Improvement of Intersections in Kathmandu City
The project aims at improving 10 intersections to improve the urban
traffic condition in Kathmandu city |
BD
DD |
2000-2001
2001-2002 |
|
Nepal |
JICA
Government/Grant |
Construction of Sindhuri Road, Section IV: Nepaltoc-Dhulikel
Construction of bridges access roads and causeways;
Bridges: 5 nos., W=4.25 m, L=244 m in total, prestress single line
Roads: 51 km
Causeway: 8 nos. |
BD
DD
CS |
1995-1996
1996-1998
1997-2002 |
|
Nepal |
JICA |
Kathmandu-Naubise Alternate Road Project
New road construction from Kathmandu to Naubise. |
FS |
2000-2001 |
|
Nepal |
JICA |
Lumbini Urban Development
Formulation of urban infrastructure development plan in Lumbini Area
(road, water supply, sewerage, power supply, communication system, solid
waste treatment plant etc.) |
S |
2000-2001 |
|
Nepal |
JICA |
Improvement of Water Supply Facilities in Kathmandu City
Improvement of improper function of the existing water supply facility
and develop new water supply systems to cope with the rapidly increasing
water demand in Kathmandu, Lalitpur and Bhaktapur municipalities. The
project consists of 3 sub-projects, namely Shaibhu, Manohara and Balkhu
project. The major facilities and equipment proposed in each project are
as follows:- service reservoir- new distribution- raw water conveyance-
run-of-river water intake- water treatment plant |
BD |
2000-2001 |
|
Nepal |
JICA |
Improvement of Existing Air Traffic Services Equipment and System under
the Tribhuvan International Airport Modernization Project
Improvement of existing air traffic control system and equipment. |
S
DD, CS |
1999
1999-2001 |
|
Nepal |
JICA |
Bheri-Babai Hydroelectric Project
Formulating the optimum plan and assessing technical, economic,
financial, and environmental feasibility of the Project.
Type: Run-of-river type |
FS |
1998-2001 |
|
Nepal |
JETRO |
Rural Power Supply Project by Utilizing Renewable Energy
Feasibility study on rural electrification project by utilizing solar
power in the western part of Nepal. |
FS |
2000 |
|
Nepal |
Government/ADB |
Melamchi Water Supply Project
Project management including overall project coordination, review of
the designs and contract documents of the following project components.
- Melamchi Diversion
- Water Treatment
- Bulk Distribution
- Hydropower Generation
- Distribution Network |
PM |
1999-2000 |
|
Nepal |
JICA |
The Study on Flood Mitigation Plan for Selected Rivers in the Terai
Plain
Formulation of master plan for flood mitigation for selected rivers in
the Terai plain and feasibility study for the priority (urgent) project(s)
identified in the Master Plan. |
MP, FS |
1997-1999 |
|
Nepal |
Government/JBIC |
Kulekhani Disaster Prevention-I&II
Construction of permanent preventive measures around Kulekhani power
station including consolidation dams, slope stabilization work, road
improvement, etc.
Phase I
- Slope stabilization works near the valve house of Kulekhani No. 1 P/S
- PC anchor: 98 nos. x 28 m
- Rockbolt: about 1,000 nos. x 5 m
- Check dams: 6 nos.
- Sabo works near Kulekhani No.2 P/S
- Check dams: 3 nos.
- Channel works: 600 m
- Slope protection works
- Rehabilitation of Project inspection road (Kulekhani No. 1 P/S - No.2
P/S):10 km
- Urgent restoration of penstock line of Kulekhani No. 1 P/S: 99 m
- Temporary restoration of Mandu headworks of Kulekhani No.2 P/S
- Master Plan Study for sediment control on Kulekhani watershed
Phase II
- Improvement of intake structure of Kulekhani No. 1 P/S
- Permanent restoration of Mandu headworks of Kulekhani No.2 P/S
- Check dams in Kulekhani watershed: 2 nos.
- Project inspection road (Kulekhani dam - Kulekhani No. 1 P/S): 21 km
- Telemetering system for Kulekhani No. 1 P/S |
DD, CS (I)
DD, CS (II) |
1990-1995
1996-1999 |
|
Nepal |
JICA
Government/Grant |
Construction of Sindhuri Road, Section I: Bardibas-Sindhuli Bazar
Construction of bridges access roads and causeways;
Bridges: 9 nos., W=7.5 m, L=740 m in total, prestress single line
Access roads: 4,075 m
Roads: 37 Km
Causeway: 17 nos., 1,118 m in total |
BD
DD, CS |
1995-1996
1996-1998 |
|
Nepal |
JICA |
Disaster Prevention Plan for Severely Affected Areas by 1993 Disaster
in the Central Development Region
Reduction of landslides, debris flows and sedimentation including basic
and selection of the priority areas with initial environmental examination
(IEE), disaster prevention plan, implementation plan, and environmental
impact assessment (EIA). |
FS |
1996-1997 |
|
Nepal |
JICA |
Integrated Basin Management Project in the West Mountainous Area
Integrated regional development in mountainous area
Formulation of disaster prevention plan for the upper reaches of Bagmati,
East Rapti and Trisuli rivers. |
S |
1995-1997 |
|
Nepal |
JICA
Government/Grant
JICA
Government/Grant |
Kathmandu Valley Power Transmission and Distribution System Extension
and Reinforcement Project
11kV Overhead line 37.4km
11kV Underground line 24.0km
Low voltage overhead line 53.5km
Low voltage underground line 9.6km
Install of Distribution transformers 17,900kVA
Reinforcement of 4 Switching/Substations |
MP, FS, BD
DD, CS
BD
DD, CS |
1990-1992
1992-1995
1993-1994
1994-1997 |
|
Nepal |
Government/IDA
Government/IBRD |
Sunsari Morang Irrigation
II: River and Canal headworks improvement and schemes for desiliting
project water supply
Irrigation: Net area 32,160 ha, annual production: rice 93,000 tons, wheat
70,000 tons
III: Feasibility study area: 46,000 ha, sample area for detailed design:
1,000 ha
Assistance in pre-qualification and tender |
DD, CS
FS, DD
Pre CS |
1986-1994
1994-1995
1997 |
|
Nepal |
JBIC |
Kali Gandaki "A" Hydroelectric Project
Review of environmental impact assessment. |
S |
1995-1996 |
|
Nepal |
JICA
Government/Grant |
Construction of New Bagmati Bridge at Thapathali
Construction of Composite Steel Plate Girder (L=138 m, W=13.5 m) and
approach road (336 m in total length), including removal of existing old
truss bridge, improvement of intersection at Thapathali, emergency
protection of the existing bridge foundation with sheet piles and
concrete, and reconstruction of gabrion check-dam and protection of
bankslope. |
BD
DD, CS |
1993
1994-1996 |
|
Nepal |
JICA |
Rehabilitation for Government Developed Irrigation Schemes in the
Kathmandu Valley
Rehabilitation for government developed irrigation schemes in the
Kathmandu Valley.
Study area: 70 schemes (9,000 ha in total), in Kathmandu, Bhaktapur and
Lalipur |
MP, FS |
1993-1995 |
|
Nepal |
JICA |
Rajkudua Irrigation
Study area: 7,000 ha enclosed by the proposed headworks site and three
rivers of Dhekrahwa, Belwa-gurudwa and Banganga in Kapilvastu district in
Lumbni Zone. |
FS
BD |
1992-1993
1994-1995 |
|
Nepal |
JBIC
Government/Grant |
Rehabilitation of Kulekhani Hydropower Station Project
Inspection for water turbines and generating facilities,
recommendation of the optimum organization for proper operation and
maintenance. |
SAPS
DD, CS |
1992-1993
1993-1995 |
|
Nepal |
ADB
Government/ADB |
East Rapti Irrigation
Development of irrigation and drainage system, institutional
strengthening and project benefit monitoring
Irrigation: 8,000 ha |
FS
DD |
1985-1986
1988-1995 |
|
Nepal |
JBIC |
Arun III Hydropower Station Construction
Assistance in project appraisal study. |
S |
1994 |
|
Nepal |
Government/IDA |
Expanding Groundwater Development for Irrigation in the Birganj Area of
the Terai
Formulation of strategy for exploitation of the groundwater resources
of the Birganj area for irrigation using tubewell facilities, and
investigation for development of groundwater for conjunctive use in the
surface water. |
FS |
1992-1993 |
|
Nepal |
JICA |
Nationwide Hydro-Metrorological Data Management
Development of a comprehensive system for meteo-hydrological data
collection, compilation and management.
Project area: Entire Nepal 141,000 km2 |
S |
1991-1993 |
|
Nepal |
JICA |
Kathmandu Valley Urban Transportation Development
Formulation of a master plan to the year 2015 and feasibility study for
selected priority projects in the Kathmandu Valley. |
MP, FS |
1991-1993 |
|
Nepal |
JICA |
Upper Karnali and Mahakari Basins Water Resources Development
Comprehensive water resources development involving hydropower,
irrigation, domestic water supply, flood control and river improvement,
sabo, watershed management, inland navigation and fisheries.
Study area: 47,000 km2 |
MP |
1991-1993 |
|
Nepal |
JICA
Government/Grant |
Kathmandu Bus Terminal Construction
Bus terminal complex accommodating medium-and long-distance route buses
and city buses, taxi and private cars.
Site area: 62,200 m2, parking lot (medium-and long-distance
route buses) 124 buses |
BD
DD, CS |
1989-1991
1991-1993 |
|
Nepal |
Government/JBIC |
Upper Rapti Basin Disaster Prevention
Water Resources Development
Study area: 43,100 km2 in total
Hydropower: 4 nos., Irrigation: 4 nos., Flood Mitigation: 1 no., Top
Priority Scheme: Run-of-river type, 82.9 MW |
MP, FS
DD, CS |
1988-1989
a1990-1993 |
|
Nepal |
JICA |
Construction of Sindhuli Road
North-South arterial highway connecting Kathmandu with East-West
Highway, 160 km long, 8 m wide, 2 lanes, 140 bridges, and aftercare study. |
FS
FS Review |
1986-1988
1992-1993 |
|
Nepal |
Government/IDA |
Narayani Zone Irrigation Development
Phase I, II: Surface water irrigation 28,700 ha, groundwater irrigation
2,400 ha
Phase III: Surface water irrigation 8,700 ha
Distribution; 20 km long, 11 kV |
FS
DD, CS |
1971-1972
1974-1993 |
|
Nepal |
ADB |
Bagmati Commanding Area Development
On-farm development in Bagmati Irrigation Project-1st stage development
area.
Irrigation: 30,000 ha |
FS |
1991-1992 |
|
Nepal |
JICA
Government/Grant |
Bridge Reconstruction in Kathmandu Valley
Reconstruction of 6 bridges among 22 damaged bridges in Kathmandu
Valley. |
BD
DD, CS |
1989-1990
1991-1992 |
|
Nepal |
JICA
Government/Grant |
Terai Plain Groundwater Development
Groundwater development: Deep production wells 115 nos., 100 m - 200 m
deep/each
Irrigation: Net area; 23 blocks; 5,000 ha |
BD
DD, CS |
1986-1988
1990-1991 |
|
Nepal |
UNDP |
Lumbini Area Bhuddah Nativity Site Conservation
Advisory services for construction management (CM) of relevant
facilities for Bhuddah nativity site conservation. |
CS |
1989-1990 |
|
Nepal |
JICA |
Kathmandu Valley Groundwater Management
Assessment of groundwater and other water resources potentials and
preparation of optimum water resources management plan for water supply in
Kathmandu Valley.
Project area: 550 km2 |
MP |
1988-1990 |
|
Nepal |
JICA |
Lumbini Regional Development
Comprehensive rural development with main focus on irrigation, road
rehabilitation, cottage industries development and potable water supply in
Lumbini Province.
Study area: 2,400 km2 |
MP |
1988-1990 |
|
Nepal |
JICA
IBRD/UNDP
JICA
Government/JBIC |
Kulekhani No. 1 & No. 2 Hydropower
No. 1: Nepal's first storage type power plant
Dam: Rock-fill, H=114 m, V=4,600,000 m3
Power: Underground powerhouse, head 600 m, 62,000 kW (Diesel power: 420 kW
x 4 nos.), 162 GWh/ year
T/L: 66 kV/3 km, 66 kV/4 km
No.2: Power: Run-of-river type, 32,000 kW
T/L: 132 kV/32 km |
FS
DD, CS
FS
DD, CS |
1973-1974
1977-1983
1977-1978
1982-1989 |
|
Nepal |
JICA
Government/Grant |
Kathmandu Valley Transmission and Distribution
1st phase:
D/L: 11 kV/101 km, 400-230 V/115 km
2nd phase:
D/L: 11 kV/83 km, 400-230 V/145 km |
FS
DD, CS |
1977-1978
1982-1988 |
|
Nepal |
Government/ADB |
Chitwan Valley Development
Guidance and training for operation and maintenance of pump irrigation
system. |
CS |
1986-1987 |
|
Nepal |
UNDP |
Small Hydropower Development
3 schemes: Khotang 500 kW, Achham 500 kW, Lomangthan Mustang 65 kW |
S |
1986-1987 |
|
Nepal |
JICA |
Nepalganj and Sindhulimadi Horticulture Center
Nepalganj: Grape farm 10 ha
Sindhulimadi: Junar farm 1.6 ha |
S, D |
1985-1987 |
|
Nepal |
JICA
Government/JBIC |
Load Dispatching Center/Kathmandu Valley Distribution Network
Improvement
S/S: 66 kV/11 kV, 6 MVA x 4, D/L: 11 kV/27 km, 400 V - 230 V/16.7 km |
BD
DD, CS |
1984
1985-1987 |
|
Nepal |
UN/UNDP
UNDP |
Lumbini Zone Integrated Rural Development
Environmental study on cultural assets and historical remains in the
mid-western part of Nepal. |
FS
S |
1973-1974
1985 |
|
Nepal |
Government/ADB |
Kankai Irrigation
Stage 1:
Net area 5,000 ha, main canals 22.4 km, secondary canals 56.9 km,
Agricultural substation: 40 ha
Stage 2:
Net area 3,000 ha, main canals 9 km, secondary canals 30 km |
FS, DD, CS |
1971-1984 |
|
Nepal |
JICA |
Sapt Gandaki Hydropower
Dam: Rock-fill, 60 m high, 2,010,000 m3 volume
Power: Run-of-river type, 300,000 kW
T/L: 132 kV/180 km |
FS |
1981-1983 |
|
Nepal |
JICA |
Janakapur Demonstration Farm
Construction of demonstration farm (net area: 65 ha) in the Sun Kosi
Terai Plain.
Preparation of O/M manuals, guidance and training of water management
staff for management. |
S, D, CS |
1979-1981 |
|
Nepal |
Government/Grant |
Tansen Water Supply
1,000 m3/day for 20,000 inhabitants
6 km long, 33 kV |
BD, DD, CS |
1977-1979 |
|
Nepal |
Government/IDA |
Chatra Irrigation
|
FS |
1977 |
|
Nepal |
Government/UNDP |
Phewa Tal Dam Reconstruction
|
DD |
1975-1976 |
|
Nepal |
JICA |
Nationwide Hydropower Development
|
S |
1973-1974 |
|
Nepal |
Government/JBIC |
General Consulting Services
|
S |
1967-1973 |
|
Nepal |
FAO/UNDP |
Central and Eastern Kosi Terai Plain Irrigated Agricultural Development
|
MP, FS |
1967-1972 |
|
Nepal |
FAO/UNDP |
Birganj Area Combined Surface and Groundwater Irrigation
|
DD |
1970-1971 |
|
Nepal |
UN/UNDP |
Karnali River Basin Hydropower Development
Dam type: Concrete Gravity, 207 m high, 604 m long, 3,700,000 m3
volume
Power: 600 MW x 3 |
MP |
1962-1966 |
|
Nepal |
UN/UNDP |
Chisapani High Dam
|
FS |
1962-1966 |
|
Nepal |
UN/UNDP |
Lakarpata Hydropower
|
FS |
1962-1966 |
|
Nepal |
JICA |
Kulekhani River Basin Hydropower Development
|
S |
1963 |
|
Pakistan |
JBIC |
Special Assistance for Project Sustainability for Islamabad Water
Supply Project
Study for reduction of non-revenue water, institutional building of the
executing agency, and improvement of financial condition. |
SAPS |
1999-2000 |
|
Pakistan |
JICA |
Munda Dam Multipurpose Project
Formulating the optimum plan and assessing technical, economic,
financial, and environmental feasibility of the project.
Type: Concrete face rock fill
Volume: 16.5 million m3
Height: 213 m
Power: 740 MW
Irrigation: approximately 6,000 ha |
FS |
1998-2000 |
|
Pakistan |
Government/JBIC |
Karachi Water Supply Improvement Project
Hub and Pipri Treatment Works which is a part of the Second Karachi
Water Supply and Sanitation Project aiming at improvement of water supply
system in Karachi City.
Upon completion, it brings the quantity of an additional 568,000 m3/day
of water. |
CS |
1995-2000 |
|
Pakistan |
Government/JBIC |
Improvement of Indus Highway, Phase-II
Upgrading and rehabilitation of National Highway (total length 568 km). |
CS |
1992-1998 |
|
Pakistan |
JICA |
Lining of Distributaries and Minors in Punjab
Collection of supplementary data and information in the priority
project areas through field survey and formulation of the development
plan.
Study area: 23,500 km2 |
FS |
1996-1997 |
|
Pakistan |
JICA
Government/Grant |
North West Frontier Provinces Bridge Construction
Construction and replacement of the new and dilapidated bridges
including the following 11 bridges (867 m in total). |
BD
DD, CS |
1992-1993
1992-1996 |
|
Pakistan |
JICA |
Chashma Right Bank First Lift Irrigation
Irrigation development with the Indus River water pumped up at the
right bank of Indus River in D. I. Khan District, North West Frontier
Province.
(Study area: 110,000 ha) |
FS |
1993-1995 |
|
Pakistan |
JICA
Government/JBIC |
Malir River Basin Agricultural Development
Integrated water resources development and rationalized agricultural
development including groundwater recharging dams, irrigation, (4,350 ha),
water supply and flood control (2,350 ha). |
FS
DD |
1989-1990
1994-1995 |
|
Pakistan |
Government/JBIC |
Metropolitan Area Bulk Water Supply Phase III - Simly Treatment Works
Water treatment plant: 81,900 m3/day
Water transmission pipeline: Simly to Islamabad 1,200 mm in dia., 28 km |
DD, CS, OM |
1990-1994 |
|
Pakistan |
JICA |
Paddy Rice Handling and Processing Improvement
Improvement and development of post-harvest practices including rental
operation of harvest machinery and edible oil production from rice bran,
etc. |
MP |
1985-1986 |
|
Sri Lanka |
Government/JBIC |
Mahaweli System C Upgrading Project
This project aims to increase the productivity of System C and handing
of distribution and field canals to Farmer Organizations by conducting
large-scale rehabilitation of main canals which cannot be implemented by
Farmer Organizations, and by strengthening capacity of Farmer
Organizations. In the program for Farmer Organizations, various software
assistance will be given including diversification of crops, improvement
of marketing of rice and other produce, and provision of agricultural
credit. The Project components include (1) Strengthening of Farmer
Organizations, (2) Agricultural Management Training, and (3) Rectification
of Irrigation Systems. |
DD, CS |
2000-2005 |
|
Sri Lanka |
Government/JBIC |
Walawe Left Bank Irrigation Upgrading and Extension Project (II)
Irrigation Extension Works:
Construction of irrigation and drainage facilities for the Extension Area
(5,340 ha) and their related basic social infrastructure on the left bank
of the Walawe river, Southern Province.
Dam Rehabilitation Works:
Rehabilitation of the Uda Walawe Dam and its appurtenant structures. |
DD, CS |
1997-2004 |
|
Sri Lanka |
Government/JBIC |
Greater Colombo Flood Control and Environmental Improvement-Phase I, II
& III
Creation of the hygienic environment for people's healthy life and
keeping dignity of the city, release people from flooding, and improvement
of water quality through improvement of the stormwater drainage system.
Project area: 190 km2 in total |
DD, CS (I)
DD, CS (II)
DD, CS (III) |
1990-1999
1995-2000
1997-2004 |
|
Sri Lanka |
Government/JBIC |
Transmission and Substation Development Project-II
Construction of Ratnapura 132/33 kV Grid Substation
Construction of Athurugiriya 132/33 kV Grid Substation
Reconductoring of Kelanitissa - Kolonnawa 132 kV T/L
Augmentation of Thulhiriya Grid Substation
Installation of additional equipment for the parallel operation of two
existing incoming 132 kV feeders at Chilaw GSS
Installation of static capacitor banks at 2 GSS. |
DD, CS |
1999-2002 |
|
Sri Lanka |
Government/IBRD
Government/JBIC |
Kukule Ganga Hydropower
T/L: 182 kV/27.2 km, 33 kV/7.5 km
Flow Regulating Structure
Type Run-of-river type with regulating pond
Full supply level (FSL) El.206 m
Minimum operating level El. 204 m
Regulating pond 1.67 MCM
Pond area 0.88 km2
Catchment area 312 km2 at the diversion weir site
Annual inflow 30.4 m3/s
Power Plant
Headrace tunnel 4.8 m dia. x 5,650 m long
Horizontal high pressure tunnel 3.9 m dia. x 60 m long
Tailrace tunnel 4.8 m dia. x 1,600 m long
Powerhouse Underground type
Installed capacity 70 MW (2 x 35 MW)
Annual average energy production 317 GWh |
FS, DD
DD, CS |
1991-1993
1997-2002 |
|
Sri Lanka |
JBIC |
Lunawa Lake Environment Improvement and Community Development Project
Storm Water Drainage Improvement, consisting of storm water drainage
works, Lunawa Lake dredging works, construction of resettlement sites, and
the supply of operation and maintenance (O&M) equipment, and Community
Development, consisting of resettlement of families and up-grading of
under-served settlements for selected settlements in the flood-prone area.
Total studied area: 104 km2 |
SAPROF |
2000-2001 |
|
Sri Lanka |
Government/JBIC |
Samanalawewa Hydroelectric Project, Reservoir Remedial Works, and Wet
Blanketing
Rehabilitation of Samanalawewa Hydroelectric Project to achieve storage
function as originally planned through wet blanketing limiting the
leakage.
Wet blanketing on the reservoir bed
Scheme-1: 250,000 m3
Scheme-2: 250,000 m3
Scheme-3: 500,000 m3
to a permissible level and to lower the groundwater pressure on the right
bank below the safe value |
CS |
1995-2001 |
|
Sri Lanka |
JICA
Government/JBIC |
Walawe Left Bank Irrigation Upgrading and Extension
Detailed Design and Construction Supervision for Old Area (3,940 ha). |
DD
CS |
1995-1996
1996-2001 |
|
Sri Lanka |
Government/JBIC
JBIC |
Upper Kotmale Hydro Electric Power
Transmission Line: 17.5 km (from the Upper Kotmale Power Station to the
existing Kotmale Switchyard), double circuit, 220 kV
Power Plant: Installed capacity; 150 MW (75 MW X 2 units)
Annual energy output: 528 GWh
Dam: Type: Concrete gravity type; Height: 35.5 m; Crest length: 175 m with
5 radical gates (10 m x 10 m)
Powerhouse: Type: Underground; turbine: Francis type, 77,000 kW - 2 units |
DD
SAPROF |
1993-1995
2001 |
|
Sri Lanka |
JBIC
Government/JBIC |
Baseline Road Improvement and Extension
Rehabilitation and upgrading the existing 8.3 km
Baseline Road between Kelani Tissa Junction and High level Road to a dual
3-lane highway. |
SAPROF
DD, CS (I)
CS (II) |
1992
1994-2000
2000-2001 |
|
Sri Lanka |
JETRO |
Supplemental Feasibility Study for Construction of Wind Power Plant
Environmental impact assessment and power flow analysis with load flow,
fault calculation, dynamic stability analysis for connection to national
grid. |
FS |
2000 |
|
Sri Lanka |
JICA |
Study for the Potential Realization of Irrigated Agriculture in the Dry
and Intermediate Zones of Sri Lanka
The objectives of the Study are to conduct a master plan study (Phase
I) for the potential realization of irrigated agriculture in the dry and
intermediate zones (6,500 km2, 100 scheme) with the goal of
achieving more profitable agriculture and higher standards of living for
rural farm households through facility rehabilitation, more efficient use
of water with participatory management and a feasibility study (Phase II)
on selected 6 high priority projects. |
MP, FS |
1999-2000 |
|
Sri Lanka |
JICA |
Study on Industry and Investment Promotion for Development of
Techno-Park in Sri Lanka
Master plan for consolidation of training of IT instructions and
establishment of Techno-Park consisting of Smart Center, Electronics
Technology Center, Soft-ware/IT Soft Industry Lot, Electronics Industry
Lot, and Residential Lot |
MP |
1999-2000 |
|
Sri Lanka |
ECFA |
Airport Rail Link From Colombo to Katunayake
Study for a 32 km long modernized railway link between Colombo city to
Bandaranaike International Airport. The project component include
extension and double tracking of the existing line, construction of
stations, procurement of rolling stocks, signaling electrification works,
and O&M Management. |
S |
2001 |
|
Sri Lanka |
JICA |
Bandaranaike International Airport Development Project
- Rehabilitation of Taxiway (93,400 m2)
- Strengthening of apron (13,800 m2)
- Apron Expansion (50,000 m2)
- Improvement of Passenger Terminal Building
- Expansion of Cargo Terminal Building- Modernization of Air Navigation
System
- Improvement of Public Utilities |
DD |
1999-2000 |
|
Sri Lanka |
JBIC
Government/JBIC |
Industrial Estates Development
Detailed design, pre-construction service and construction supervision
for Seethawaka Industrial Estate (168 ha).
Detailed design for Katana Industrial Estate (59 ha). |
SAPROF
DD, CS |
1993
1995-2000 |
|
Sri Lanka |
Government/JBIC |
Transmission & Grid Substations Development Project
132 kV lines, 180 km (4 lines)
132/33 kV Grid Substations
2 x 132 kV bay extension 3 nos.
2 x 31.5 MVA augmentation 1 no.
2 x 31.5 MVA new substation 1 no. |
DD, CS |
1992-1999 |
|
Sri Lanka |
JICA |
Development of Transmission System of the Ceylon Electricity Board
Development of optimum long-term transmission system expansion program
for the whole area of Sri Lanka (target year: 2010) and up-grading of
in-house transmission planning capacities. |
MP |
1996-1997 |
|
Sri Lanka |
JICA |
Southern Area Development
Integrated regional development master plan up to year 2015 for
promoting regional growth, diversification of the regional economy and
expansion of employment-absorptive capacity.
(Study area: 10,500 km2) |
MP |
1995-1997 |
|
Sri Lanka |
Government/JBIC |
Transmission System Augmentation and Development
Augmentation of existing transmission lines and grid substations and
establishment of new communication system operated by Ceylon Electricity
Board.
T/L: 132 kV/166 km double circuit, 5 sections
S/S: 132/32 kV, Grid substations: 2x10 MVA, 2 x 15 MVA, 2 x 30 MVA, 5
sites |
DD, CS |
1990-1997 |
|
Sri Lanka |
JICA
Government/Grant |
Improvement of Walawe Left Bank Area Rural Infrastructure
Improvement works of rural road (31 km), bridge (90 m), water supply
facilities (1,000t/day) and related facilities. |
BD
DD, CS |
1993
1994-1996 |
|
Sri Lanka |
Private Company |
Lanka Tower Construction
34 stories single tower as the apartment for foreign residents near the
center of Colombo city.
Site: 6,340 m2 |
DD, CS |
1993-1996 |
|
Sri Lanka |
Government/JBIC
JBIC |
Mahaweli Ganga System C Development
Irrigation: 18,500 ha, Main Canals: 17.4 km,
branch canals: 105 km, drainage canals 620 km |
DD, CS, OM
SAPS |
1982-1994
1995-1996 |
|
Sri Lanka |
JICA |
Study on General Environmental Condition
Study on general environmental condition based on proper environmental
understandings and formulation and charring out Environmental Maintenance
Plan. |
MP |
1995 |
|
Sri Lanka |
JICA |
Agricultural and Rural Development for Up-country Peasantry
Rehabilitation
Agricultural and rural development in Central, Uva, and Sabaragamuwa
Province, and transfer of technology.
Study area: 18,972 km2 |
MP |
1993-1994 |
|
Sri Lanka |
JICA |
Greater Colombo (Kalu Ganga) Water Supply
Formulation of a plan for the expansion of the Greater Colombo water
supply system with an intake from Kalu Ganga to meet the water demand up
to the year 2020. |
MP, FS |
1993-1994 |
|
Sri Lanka |
Government/JBIC |
Samanalawewa Hydroelectric Power Development
Dam: Rock-fill, 100 m high, 530 m long, 4,500,000 m3 volume
Power: 120,000 kW
T/L: 132 kV/17 km |
DD, CS |
1986-1994 |
|
Sri Lanka |
JICA |
Industrial Sector Development Study
Plan formulation and recommendations for the nation's accelerated
industrial development and export promotion through strengthening existing
industries, and legal and institutional systems and functions. |
MP, Pre-F/S |
1992-1993 |
|
Sri Lanka |
JBIC |
Inginimitiya Irrigation Dam
Improvement of water management method and strengthening the
agricultural activities command area: 2,550 ha. |
SAPS |
1992-1993 |
|
Sri Lanka |
JICA
Government/JBIC |
Colombo Katunayake Expressway and New Port Access Road Development
Metropolitan highway development between Katunayake international
airport and Colombo port.
Toll expressway: 25.4 km (4 lanes)
Arterial highway: 5.7 km (4 lanes) |
FS
DD |
1982-1984
1991-1992 |
|
Sri Lanka |
Government/IBRD |
Training Programme Under the Financing Agreement with the World Bank
Provision and arrangements for overseas training for selected staff of
MECA to visit, see and study similar irrigation projects in Philippines,
Indonesia and Thailand for acquisition of technical knowledge applicable
to the Mahaweli Project. |
S |
1988-1989 |
|
Sri Lanka |
|