SW Asia
Home Services Countries Latest News Search Site Recruitment NK Tokyo

More information is available from
Nippon Koei UK

61/63 Crockhamwell Road, Woodley,
Reading RG5 3JP United Kingdom
Tel: +44 (0)118 927 7550
Fax: +44 (0)118 969 1534
email: info@nkuk.co.uk

List of NK Experience in Asia (Southwest)

Country

Client/Finance

Project

Services

Period

Afghanistan

JICA

Project Formulation Study for Recovery and Reconstruction (Human Resources Development & Capacity Building Sector)

Study on the current status and identification of problems of human resources development and education sector, especially from the viewpoint of capacity building of the people in charge of country reconstruction and recovery, to formulate future technical assistance programs in this sector.

S

2002

Bangladesh DANIDA Technical Review of the Rural Development Project RDP-16 Phase II

The main activities of RDP-16 Phase II are to:
rehabilitate and maintain a number of selected economically sustainable transport networks and associated markets in the project area;
assist in the long term development of a sustainable local maintenance capability;
develop a sustainable employment opportunities programme for targeted local groups which will have a particular focus on Women in Development activities.
Implementation of the project is carried out through the Local Government Engineering Department (LGED) of the Ministry of Local Government Rural Development and Co-operatives (MLGRDC).

TR 2001

Bangladesh

JBIC

Rehabilitation of Caustic Soda Factory in Chittagong

Study on environmental pollution measures for pulling down the caustic soda factory

S

1998

Bangladesh

JICA

Construction of Revetment on the Bank of Meghna River

Revetment works on the Meghna Bridge site for protection for Meghna Bridge against erosion and deposition.

BD

1997-1998

Bangladesh

JICA
Government/Grant

Meghna and Meghna Gumti Bridge Construction

Meghna Bridge
Type: PC box girder (max. span 87 m), Length: 930 Width: 9.2 m, Approach road: 1,965 m in total length
Meghna-Gumti Bridge
Type: PC box girder (max. span 90 m), Length: 1,480 m, Width: 9.2 m, Approach road: 1,430 m in total length

FS
DD, CS

1984-1985
1985-1996

Bangladesh

JICA

Industrial Development Study of Chittagong Region

Formulation a comprehensive plan for industrial development of Chittagong Region with a view of vitalization and modernization of the national economy up to year: 2005.

FS

1994-1995

Bangladesh

JBIC

Paksey Bridge Construction

Survey and investigation for construction of a highway bridge over Ganges River (PC Box Girder, 1,800 m in length)

SAPROF

1993-1994

Bangladesh

JICA
Government/Grant

Construction of Revetment on the Bank of Meghna River

Protection of the existing revetment in Camille side to project the Mooney Bridge and its access road against scouring.

BD
DD, CS

1992
1992-1993

Bangladesh

JICA

North West Region Flood Protection and Drainage Improvement

Japan/UK joint master plan study for region-wide flood control and feasibility study for selected options.
Study area: 34,200 km2

MP, FS

1991-1993

Bangladesh

JICA

Kurigram Irrigation and Flood Control-South Unit

Formulation of irrigation and drainage development and flood control plan.
Net area: 63,000 ha

FS

1991-1993

Bangladesh

ADB

South East Region Water Resources Development

Land and water resources development to support regional agricultural production for food grain self-sustenance.
Study area: 9,000 km2

FS

1990-1993

Bangladesh

JBIC

Dhaka Container Terminal

Plan of construction of a container terminal (8 ha), general cargo jetty (3 ha), and across road (4.8 km).

SAPROF

1992

Bangladesh

JICA

Model Rural Community Development

Development of model area rural community.
Phase I: Kachua, Nabinagar, Bancharampur and Debidwar districts, Comilla (106,450 ha)
Phase II: Homna and Daudikandi districts, Comilla (Study area: 550 km2)

MP

1990-1991

Bangladesh

JICA

Dhaka-Narayanganj Container Terminal Development

Stagewise development of Dhaka port container terminal (1st stage development scheme).
Annual throughput: Year 1995; 69,000 TEUs

MP, FS

1989-1991

Bangladesh

Government/ADB

Power Transmission and Distribution

T/L: East-West intertie transmission system 230 kV/27.5 km
D/L: Distribution network expansion in Chittagong

DD, CS

1984-1991

Bangladesh

Government/JBIC

Madhapara Hard Rock Mining

Economic review of previously prepared plan for large-scale aggregate production.
Planned annual output: 1,700,000 tons

FS

1989-1990

Bangladesh

Government/ADB

Pabna Irrigation and Rural Development

Flood protection: Flood embankments 121 km
Drainage: 4 pumping stations, drainage channels 419.8 km
Irrigation: 29,000 ha, 2 pumping stations, irrigation canals 170 km
T/L: 35.4 km

DD, CS

1980-1990

Bangladesh

Government/ADB

Chittagong Port Land Reclamation Project

Land reclamation (70 ha) by dredging the estuary of Kamaphuli River, consisting of 43 ha for fertilizer plant, 20 ha for housing lots and 7 ha for jetty area.
Jetty: 15,000 DWT x 1
Civil Works: Yard pavement, Dredging/Reclamation

CS

1982-1983

Bangladesh

Government/JBIC

Goalpara-Barisal Transmission Line

T/L: 132 kV/136 km
Transformer: 10/13.3 MVA 4 units

DD, CS

1961-1981

Bangladesh

Government

Beramara Gas Turbine Power Plant

General consultation
Power: 2 x 20 MW

DD, CS

1974-1976

Bangladesh

JICA

Jamuna Bridge

S

1972-1975

Bangladesh

JICA

Karnafuli Hydropower Extension

S

1969-1970

Bhutan

JICA

Lhuntsi Mongar Integrated Agricultural Development

Formulation of integrated agricultural development plan in 2 districts in eastern region of the country, feasibility study on the priority project and transfer of technology to the government staff.

FS

1988-1989

Bhutan

JICA
Government/Grant

National Cash Crop Development

Improvement and modernization of National Seed and Plant Program (NSEPP) for promotion of export-oriented cash crops.

FS
DD, CS

1986-1987
1987-1989

Bhutan

JICA
Government

Agricultural Mechanization

Training center: Total floor area 1,800 m2, Machine shed: 20 m2

S
DD, CS

1982
1983-1985

India

Government/JBIC

Attappady Wasteland Comprehensive Environmental Conservation Project

Overall project coordination in formulating implementation program, review of survey and detailed design, preparation of special schemes for poverty prevention and project monitoring.
Project aims to prevent land degradation through proper forest management, water resources development and agricultural development, to restore the wasteland through soil and water conservation measures, and to alleviate rural poverty through rural infrastructure development.

PM

1999-2003

India

JBIC
Government/JBIC

Kurnool-Cuddapah Canal Modernization Project

Special Assistance for Project Formation (SAPROF), detailed design and construction supervision for the new irrigation canal construction for planned area and engineering services for pre-construction and construction supervision.
Main canal: 305.6 km, Distribution: 825.9 km
localized area: 106,400 ha, Pilot area: 10,000 ha

SAPROF
DD, CS

1994-1995
1998-2003

India

Government/JBIC

National Highway No. 5 in Andra Pradesh State

Widening the existing two-lanes carriageway to four-lanes including strengthening the existing pavement for a length of 79 km.

CS

1999-2002

India

Government/JBIC

Simhadri & Vizag Transmission System

400 kV T/L (DC): 330 km
220 kV T/L (SC): 96 km
400/202 kV Substations: 29 Nos.
220/132 kV Substations: 5 Nos.

DD, CS

1999-2002

India

Government/JBIC

Rengali Irrigation Project

Overall project management, assistance in procurement procedure, construction supervision, operation and maintenance, and technical guidance and training for the irrigated rural and agricultural development project.
Legt Bank Canal: L=41.31 km, W=18 m, Regulator: 18 nos., Distributor and Minor Canal: 84 nos., 619 km in total

DD, CS

1998-2002

India

Government/JBIC

Manipur Sericulture Projects

Detailed design, tender assistance and construction supervision for facilities of sericulture and institutional development including gender (WID) guidance, preparation of O&M manual and system.
Manipur Sericulture Project:
- Mulberry Sector (2,720ha), Eri sector (1,500ha)
- Beneficiaries (30,720)

DD, CS

1998-2001

India

Government/JBIC

Madhya Pradesh Sericulture Projects

Detailed design, tender assistance and construction supervision for facilities of sericulture and institutional development including gender (WID) guidance, preparation of O&M manual and system.
Madhya Pradesh Sericulture Project:
- Mulberry Sector (3,000ha), Tasar sector (4,000ha)
- Beneficiaries (47,460)

DD, CS

1998-2001

India

Government/JBIC
JBIC

Dhauliganga Hydroelectric Project

Review of feasibility and tender designs, tender assistance services and review of quality control system and manuals for development of 280 MW hydropower station with run-of-river power generation. (gross head 311 m, Dam: H=56 m, concrete faced rockfill dam).
Prepared a basic design of a GLOF (glacier lake outburst flood) Forecast and Warning System, and prepared technical notes on the detailed design of a GLOF Forecast and Warning System based on which the implementation agency could establish GLOF Forecast and Warning System effectively
The study aimed at countermeasures against the GLOF hazards, consisting of (i) inventory of existing glacier lakes along the Hindu Kush Himalayan, (ii) monitoring of potential risk lakes for draining, and (iii) operational early warning mechanism for GLOF hazards.

DD
SAPI

1997-1999
2001

India

JBIC

Study on Glacier Lake Outburst Flood (GLOF) in Upperstream of Dahauliganga Dam

Study on potential of GLOF and technical assessment to judge whether dam withstand GLOF.

S

2000

India

Government/JBIC

National Highway No. 2 Improvement

Widening of the existing two-lanes section to four-lanes, improvement of drainage facilities and construction of bridge (51.3 km).

DD, CS

1993-2000

India

Government/IBRD

Nathpa Jhakri Hydroelectric Development

Damsite:
- Catchment area (damsite): 49,820 km2
- Maximum power discharge: 405 m3/sec.
- Normal H.W.L: El.1,493.50 m
Dam:
- Type: Concrete gravity type
- Height: 60.5 m
Waterway
- Headrace tunnel: 10.15 m dia. x 27,300 m long
- Surge tank: 21 m dia x 301 m deep
- Penstock line: 4.9 m dia x 633 m long x 3 lines
- Tailrace tunnel: 10.15 m dia. x 1,080 m long
- Gross head: 425 m
Power Station:
- Type: Underground type
- Turbine: Francis type: 6 units
- Installed capacity: 250 MW x 6 units
- Annual energy output: 7,447 GWh/year

DD, CS

1990-1999

India

JICA

Feasibility Study on National Highway Bypasses

Pre-feasibility study on bypasses improvement in proposed 10 cities and feasibility study for high priority 3 bypasses.
Target year: 2002

FS

1997-1998

India

JBIC

Renewable Energy Project

Special Assistance for Project Formation (SAPROF) study for promotion of accelerated development of renewable energy resources such as small hydro, solar energy, wind energy, co-generation and bio energy. The project aims at the improvement in the living conditions and for sustained development of rural and agricultural areas in India.

SAPROF

1997-1998

India

JICA
Government/Grant

Nizamuddin Bridge Construction on NH-24

L=550.0 m, W=22.6 m
Prestressed concrete continuous I beam, Open caisson foundation
Approach road: 750 m in total length

BD
DD, CS

1994-1995
1995-1998

India

JBIC
Government/JBIC

Upper Kolab and Upper Indravati Irrigation

Kolab dam: concrete/masonry dam, H=55 m, L=646 m
Main canal: 58.8 km, Irrigation: 48,000 ha, Hydropower: 320 MW
Indravati dam: H=45 m, L=555 m
Main canal: 66 Km, Irrigation: 109,300 ha, Hydropower: 600 MW

SAPI
CS

1993
1995-1998

India

JBIC

Madhya Pradesh and Manipur Sericulture Projects

Special assistance for project formulation to up-date of feasibility study and prepare of implementation program for the phased sericulture development.
-Madhya Pradesh Sericulture Project:
Mulberry Sector (3,000ha), Tasar sector (4,000ha)
- Manipur Sericulture Project:
Mulberry Sector (2,720ha), Eri sector (1,500ha)

SAPROF

1996-1997

India

JBIC

Transmission and Distribution System/Construction of Small Hydroelectric Power Project

Investigation on sub-projects handled by the Government of India to clarify of the priority.

SAPI

1995

India

JICA

Sharda Canal CAD (Command Area Development)

Rehabilitation and expansion of irrigation and drainage systems in the Hardoi secondary canal commanding area (3-4 sites, 30,000 ha - 40,000 ha/site).

FS

1990-1991

India

JBIC

Power System Improvement and Micro/Mini Hydroelectric Development

Updating of previously prepared feasibility study for improvement of existing power system by installation of micro/mini hydroelectric plants.

SAPROF

1988-1989

Nepal

JICA
Government/Grant

Construction of Sindhuri Road, Section II

Mountainous road construction project from Sindhuri Bazar to Khurkot (39 km)

BD
DD
CS

1999
2000-2001
2000-2004

Nepal

JICA

Project for Extension and Reinforcement of Power Transmission and Distribution System in Kathmandu Valley (Phase-3)

The project aims to construct new K-3 substation (66/11 kV) and 66 kV transmission line from existing Siuchatar substation to K-3 S/S to increase power distribution capacity in Kathmandu.

BD

2002

Nepal DFID Environmental Due Diligence

Visit selected industries and evaluate the environmental risks and opportunities associated with the Government of Nepal’s programme to privatise state-owned-enterprises (SOEs)
Assess the potential for levering environmental improvements in industries subject to divestment
Liaise with stakeholders to assess the knowledge and awareness of Environmental Due Diligence (EDD) and its potential as an environmental management tool, within government and outside· Conduct a training needs assessment of Government and the Consultancy sector and devise appropriate courses of training in EDD
Make recommendations for targeted support from the UK Government in the privatisation process, to improve environmental performance in the privatised industries.

EDD 2001

Nepal

JICA

Earthquake Disaster Mitigation in the Kathmandu Valley

Master Plan for Earthquake Disaster Mitigation cooperating with Government and NGO.
Total studied area: 585 km2

MP

2001-2002

Nepal

JICA

Development of Urban Environmental Strategies in Nepal

Environmental conditions in Katmandu Basin have been deteriorating rapidly due to urbanization and industrialization. However, effective approaches to improve the situation have not been identified. In this Study, a comprehensive review of urban environmental issues in Katmandu Basin will be made, and strategies to improve urban environment will be developed.

S

2001-2002

Nepal

JICA

Urban Environmental Planning in the Kathmandu Valley in the Kingdom of Nepal

Technical Assistance to grasp and evaluate environmental conditions and environmental measures taken.
Also, responsible to propose possible measures for identified environmental problems and develop its implementation program.
Additionally, responsible to recommend on further cooperation by Japan.
Corresponding to the developed implementation program.

S

2001-2002

Nepal

JICA

Improvement of Intersections in Kathmandu City

The project aims at improving 10 intersections to improve the urban traffic condition in Kathmandu city

BD
DD

2000-2001
2001-2002

Nepal

JICA
Government/Grant

Construction of Sindhuri Road, Section IV: Nepaltoc-Dhulikel

Construction of bridges access roads and causeways;
Bridges: 5 nos., W=4.25 m, L=244 m in total, prestress single line
Roads: 51 km
Causeway: 8 nos.

BD
DD
CS

1995-1996
1996-1998
1997-2002

Nepal

JICA

Kathmandu-Naubise Alternate Road Project

New road construction from Kathmandu to Naubise.

FS

2000-2001

Nepal

JICA

Lumbini Urban Development

Formulation of urban infrastructure development plan in Lumbini Area (road, water supply, sewerage, power supply, communication system, solid waste treatment plant etc.)

S

2000-2001

Nepal

JICA

Improvement of Water Supply Facilities in Kathmandu City

Improvement of improper function of the existing water supply facility and develop new water supply systems to cope with the rapidly increasing water demand in Kathmandu, Lalitpur and Bhaktapur municipalities. The project consists of 3 sub-projects, namely Shaibhu, Manohara and Balkhu project. The major facilities and equipment proposed in each project are as follows:- service reservoir- new distribution- raw water conveyance- run-of-river water intake- water treatment plant

BD

2000-2001

Nepal

JICA

Improvement of Existing Air Traffic Services Equipment and System under the Tribhuvan International Airport Modernization Project

Improvement of existing air traffic control system and equipment.

S
DD, CS

1999
1999-2001

Nepal

JICA

Bheri-Babai Hydroelectric Project

Formulating the optimum plan and assessing technical, economic, financial, and environmental feasibility of the Project.
Type: Run-of-river type

FS

1998-2001

Nepal

JETRO

Rural Power Supply Project by Utilizing Renewable Energy

Feasibility study on rural electrification project by utilizing solar power in the western part of Nepal.

FS

2000

Nepal

Government/ADB

Melamchi Water Supply Project

Project management including overall project coordination, review of the designs and contract documents of the following project components.
- Melamchi Diversion
- Water Treatment
- Bulk Distribution
- Hydropower Generation
- Distribution Network

PM

1999-2000

Nepal

JICA

The Study on Flood Mitigation Plan for Selected Rivers in the Terai Plain

Formulation of master plan for flood mitigation for selected rivers in the Terai plain and feasibility study for the priority (urgent) project(s) identified in the Master Plan.

MP, FS

1997-1999

Nepal

Government/JBIC

Kulekhani Disaster Prevention-I&II

Construction of permanent preventive measures around Kulekhani power station including consolidation dams, slope stabilization work, road improvement, etc.
Phase I
- Slope stabilization works near the valve house of Kulekhani No. 1 P/S
- PC anchor: 98 nos. x 28 m
- Rockbolt: about 1,000 nos. x 5 m
- Check dams: 6 nos.
- Sabo works near Kulekhani No.2 P/S
- Check dams: 3 nos.
- Channel works: 600 m
- Slope protection works
- Rehabilitation of Project inspection road (Kulekhani No. 1 P/S - No.2 P/S):10 km
- Urgent restoration of penstock line of Kulekhani No. 1 P/S: 99 m
- Temporary restoration of Mandu headworks of Kulekhani No.2 P/S
- Master Plan Study for sediment control on Kulekhani watershed
Phase II
- Improvement of intake structure of Kulekhani No. 1 P/S
- Permanent restoration of Mandu headworks of Kulekhani No.2 P/S
- Check dams in Kulekhani watershed: 2 nos.
- Project inspection road (Kulekhani dam - Kulekhani No. 1 P/S): 21 km
- Telemetering system for Kulekhani No. 1 P/S

DD, CS (I)
DD, CS (II)

1990-1995
1996-1999

Nepal

JICA
Government/Grant

Construction of Sindhuri Road, Section I: Bardibas-Sindhuli Bazar

Construction of bridges access roads and causeways;
Bridges: 9 nos., W=7.5 m, L=740 m in total, prestress single line
Access roads: 4,075 m
Roads: 37 Km
Causeway: 17 nos., 1,118 m in total

BD
DD, CS

1995-1996
1996-1998

Nepal

JICA

Disaster Prevention Plan for Severely Affected Areas by 1993 Disaster in the Central Development Region

Reduction of landslides, debris flows and sedimentation including basic and selection of the priority areas with initial environmental examination (IEE), disaster prevention plan, implementation plan, and environmental impact assessment (EIA).

FS

1996-1997

Nepal

JICA

Integrated Basin Management Project in the West Mountainous Area

Integrated regional development in mountainous area
Formulation of disaster prevention plan for the upper reaches of Bagmati, East Rapti and Trisuli rivers.

S

1995-1997

Nepal

JICA
Government/Grant
JICA
Government/Grant

Kathmandu Valley Power Transmission and Distribution System Extension and Reinforcement Project

11kV Overhead line 37.4km
11kV Underground line 24.0km
Low voltage overhead line 53.5km
Low voltage underground line 9.6km
Install of Distribution transformers 17,900kVA
Reinforcement of 4 Switching/Substations

MP, FS, BD
DD, CS
BD
DD, CS

1990-1992
1992-1995
1993-1994
1994-1997

Nepal

Government/IDA
Government/IBRD

Sunsari Morang Irrigation

II: River and Canal headworks improvement and schemes for desiliting project water supply
Irrigation: Net area 32,160 ha, annual production: rice 93,000 tons, wheat 70,000 tons
III: Feasibility study area: 46,000 ha, sample area for detailed design: 1,000 ha
Assistance in pre-qualification and tender

DD, CS
FS, DD
Pre CS

1986-1994
1994-1995
1997

Nepal

JBIC

Kali Gandaki "A" Hydroelectric Project

Review of environmental impact assessment.

S

1995-1996

Nepal

JICA
Government/Grant

Construction of New Bagmati Bridge at Thapathali

Construction of Composite Steel Plate Girder (L=138 m, W=13.5 m) and approach road (336 m in total length), including removal of existing old truss bridge, improvement of intersection at Thapathali, emergency protection of the existing bridge foundation with sheet piles and concrete, and reconstruction of gabrion check-dam and protection of bankslope.

BD
DD, CS

1993
1994-1996

Nepal

JICA

Rehabilitation for Government Developed Irrigation Schemes in the Kathmandu Valley

Rehabilitation for government developed irrigation schemes in the Kathmandu Valley.
Study area: 70 schemes (9,000 ha in total), in Kathmandu, Bhaktapur and Lalipur

MP, FS

1993-1995

Nepal

JICA

Rajkudua Irrigation

Study area: 7,000 ha enclosed by the proposed headworks site and three rivers of Dhekrahwa, Belwa-gurudwa and Banganga in Kapilvastu district in Lumbni Zone.

FS
BD

1992-1993
1994-1995

Nepal

JBIC
Government/Grant

Rehabilitation of Kulekhani Hydropower Station Project

Inspection for water turbines and generating facilities,
recommendation of the optimum organization for proper operation and maintenance.

SAPS
DD, CS

1992-1993
1993-1995

Nepal

ADB
Government/ADB

East Rapti Irrigation

Development of irrigation and drainage system, institutional strengthening and project benefit monitoring
Irrigation: 8,000 ha

FS
DD

1985-1986
1988-1995

Nepal

JBIC

Arun III Hydropower Station Construction

Assistance in project appraisal study.

S

1994

Nepal

Government/IDA

Expanding Groundwater Development for Irrigation in the Birganj Area of the Terai

Formulation of strategy for exploitation of the groundwater resources of the Birganj area for irrigation using tubewell facilities, and investigation for development of groundwater for conjunctive use in the surface water.

FS

1992-1993

Nepal

JICA

Nationwide Hydro-Metrorological Data Management

Development of a comprehensive system for meteo-hydrological data collection, compilation and management.
Project area: Entire Nepal 141,000 km2

S

1991-1993

Nepal

JICA

Kathmandu Valley Urban Transportation Development

Formulation of a master plan to the year 2015 and feasibility study for selected priority projects in the Kathmandu Valley.

MP, FS

1991-1993

Nepal

JICA

Upper Karnali and Mahakari Basins Water Resources Development

Comprehensive water resources development involving hydropower, irrigation, domestic water supply, flood control and river improvement, sabo, watershed management, inland navigation and fisheries.
Study area: 47,000 km2

MP

1991-1993

Nepal

JICA
Government/Grant

Kathmandu Bus Terminal Construction

Bus terminal complex accommodating medium-and long-distance route buses and city buses, taxi and private cars.
Site area: 62,200 m2, parking lot (medium-and long-distance route buses) 124 buses

BD
DD, CS

1989-1991
1991-1993

Nepal

Government/JBIC

Upper Rapti Basin Disaster Prevention

Water Resources Development
Study area: 43,100 km2 in total
Hydropower: 4 nos., Irrigation: 4 nos., Flood Mitigation: 1 no., Top Priority Scheme: Run-of-river type, 82.9 MW

MP, FS
DD, CS

1988-1989
a1990-1993

Nepal

JICA

Construction of Sindhuli Road

North-South arterial highway connecting Kathmandu with East-West Highway, 160 km long, 8 m wide, 2 lanes, 140 bridges, and aftercare study.

FS
FS Review

1986-1988
1992-1993

Nepal

Government/IDA

Narayani Zone Irrigation Development

Phase I, II: Surface water irrigation 28,700 ha, groundwater irrigation 2,400 ha
Phase III: Surface water irrigation 8,700 ha
Distribution; 20 km long, 11 kV

FS
DD, CS

1971-1972
1974-1993

Nepal

ADB

Bagmati Commanding Area Development

On-farm development in Bagmati Irrigation Project-1st stage development area.
Irrigation: 30,000 ha

FS

1991-1992

Nepal

JICA
Government/Grant

Bridge Reconstruction in Kathmandu Valley

Reconstruction of 6 bridges among 22 damaged bridges in Kathmandu Valley.

BD
DD, CS

1989-1990
1991-1992

Nepal

JICA
Government/Grant

Terai Plain Groundwater Development

Groundwater development: Deep production wells 115 nos., 100 m - 200 m deep/each
Irrigation: Net area; 23 blocks; 5,000 ha

BD
DD, CS

1986-1988
1990-1991

Nepal

UNDP

Lumbini Area Bhuddah Nativity Site Conservation

Advisory services for construction management (CM) of relevant facilities for Bhuddah nativity site conservation.

CS

1989-1990

Nepal

JICA

Kathmandu Valley Groundwater Management

Assessment of groundwater and other water resources potentials and preparation of optimum water resources management plan for water supply in Kathmandu Valley.
Project area: 550 km2

MP

1988-1990

Nepal

JICA

Lumbini Regional Development

Comprehensive rural development with main focus on irrigation, road rehabilitation, cottage industries development and potable water supply in Lumbini Province.
Study area: 2,400 km2

MP

1988-1990

Nepal

JICA
IBRD/UNDP
JICA
Government/JBIC

Kulekhani No. 1 & No. 2 Hydropower

No. 1: Nepal's first storage type power plant
Dam: Rock-fill, H=114 m, V=4,600,000 m3
Power: Underground powerhouse, head 600 m, 62,000 kW (Diesel power: 420 kW x 4 nos.), 162 GWh/ year
T/L: 66 kV/3 km, 66 kV/4 km
No.2: Power: Run-of-river type, 32,000 kW
T/L: 132 kV/32 km

FS
DD, CS
FS
DD, CS

1973-1974
1977-1983
1977-1978
1982-1989

Nepal

JICA
Government/Grant

Kathmandu Valley Transmission and Distribution

1st phase:
D/L: 11 kV/101 km, 400-230 V/115 km
2nd phase:
D/L: 11 kV/83 km, 400-230 V/145 km

FS
DD, CS

1977-1978
1982-1988

Nepal

Government/ADB

Chitwan Valley Development

Guidance and training for operation and maintenance of pump irrigation system.

CS

1986-1987

Nepal

UNDP

Small Hydropower Development

3 schemes: Khotang 500 kW, Achham 500 kW, Lomangthan Mustang 65 kW

S

1986-1987

Nepal

JICA

Nepalganj and Sindhulimadi Horticulture Center

Nepalganj: Grape farm 10 ha
Sindhulimadi: Junar farm 1.6 ha

S, D

1985-1987

Nepal

JICA
Government/JBIC

Load Dispatching Center/Kathmandu Valley Distribution Network Improvement

S/S: 66 kV/11 kV, 6 MVA x 4, D/L: 11 kV/27 km, 400 V - 230 V/16.7 km

BD
DD, CS

1984
1985-1987

Nepal

UN/UNDP
UNDP

Lumbini Zone Integrated Rural Development

Environmental study on cultural assets and historical remains in the mid-western part of Nepal.

FS
S

1973-1974
1985

Nepal

Government/ADB

Kankai Irrigation

Stage 1:
Net area 5,000 ha, main canals 22.4 km, secondary canals 56.9 km, Agricultural substation: 40 ha
Stage 2:
Net area 3,000 ha, main canals 9 km, secondary canals 30 km

FS, DD, CS

1971-1984

Nepal

JICA

Sapt Gandaki Hydropower

Dam: Rock-fill, 60 m high, 2,010,000 m3 volume
Power: Run-of-river type, 300,000 kW
T/L: 132 kV/180 km

FS

1981-1983

Nepal

JICA

Janakapur Demonstration Farm

Construction of demonstration farm (net area: 65 ha) in the Sun Kosi Terai Plain.
Preparation of O/M manuals, guidance and training of water management staff for management.

S, D, CS

1979-1981

Nepal

Government/Grant

Tansen Water Supply

1,000 m3/day for 20,000 inhabitants
6 km long, 33 kV

BD, DD, CS

1977-1979

Nepal

Government/IDA

Chatra Irrigation

FS

1977

Nepal

Government/UNDP

Phewa Tal Dam Reconstruction

DD

1975-1976

Nepal

JICA

Nationwide Hydropower Development

S

1973-1974

Nepal

Government/JBIC

General Consulting Services

S

1967-1973

Nepal

FAO/UNDP

Central and Eastern Kosi Terai Plain Irrigated Agricultural Development

MP, FS

1967-1972

Nepal

FAO/UNDP

Birganj Area Combined Surface and Groundwater Irrigation

DD

1970-1971

Nepal

UN/UNDP

Karnali River Basin Hydropower Development

Dam type: Concrete Gravity, 207 m high, 604 m long, 3,700,000 m3 volume
Power: 600 MW x 3

MP

1962-1966

Nepal

UN/UNDP

Chisapani High Dam

FS

1962-1966

Nepal

UN/UNDP

Lakarpata Hydropower

FS

1962-1966

Nepal

JICA

Kulekhani River Basin Hydropower Development

S

1963

Pakistan

JBIC

Special Assistance for Project Sustainability for Islamabad Water Supply Project

Study for reduction of non-revenue water, institutional building of the executing agency, and improvement of financial condition.

SAPS

1999-2000

Pakistan

JICA

Munda Dam Multipurpose Project

Formulating the optimum plan and assessing technical, economic, financial, and environmental feasibility of the project.
Type: Concrete face rock fill
Volume: 16.5 million m3
Height: 213 m
Power: 740 MW
Irrigation: approximately 6,000 ha

FS

1998-2000

Pakistan

Government/JBIC

Karachi Water Supply Improvement Project

Hub and Pipri Treatment Works which is a part of the Second Karachi Water Supply and Sanitation Project aiming at improvement of water supply system in Karachi City.
Upon completion, it brings the quantity of an additional 568,000 m3/day of water.

CS

1995-2000

Pakistan

Government/JBIC

Improvement of Indus Highway, Phase-II

Upgrading and rehabilitation of National Highway (total length 568 km).

CS

1992-1998

Pakistan

JICA

Lining of Distributaries and Minors in Punjab

Collection of supplementary data and information in the priority project areas through field survey and formulation of the development plan.
Study area: 23,500 km2

FS

1996-1997

Pakistan

JICA
Government/Grant

North West Frontier Provinces Bridge Construction

Construction and replacement of the new and dilapidated bridges including the following 11 bridges (867 m in total).

BD
DD, CS

1992-1993
1992-1996

Pakistan

JICA

Chashma Right Bank First Lift Irrigation

Irrigation development with the Indus River water pumped up at the right bank of Indus River in D. I. Khan District, North West Frontier Province.
(Study area: 110,000 ha)

FS

1993-1995

Pakistan

JICA
Government/JBIC

Malir River Basin Agricultural Development

Integrated water resources development and rationalized agricultural development including groundwater recharging dams, irrigation, (4,350 ha), water supply and flood control (2,350 ha).

FS
DD

1989-1990
1994-1995

Pakistan

Government/JBIC

Metropolitan Area Bulk Water Supply Phase III - Simly Treatment Works

Water treatment plant: 81,900 m3/day
Water transmission pipeline: Simly to Islamabad 1,200 mm in dia., 28 km

DD, CS, OM

1990-1994

Pakistan

JICA

Paddy Rice Handling and Processing Improvement

Improvement and development of post-harvest practices including rental operation of harvest machinery and edible oil production from rice bran, etc.

MP

1985-1986

Sri Lanka

Government/JBIC

Mahaweli System C Upgrading Project

This project aims to increase the productivity of System C and handing of distribution and field canals to Farmer Organizations by conducting large-scale rehabilitation of main canals which cannot be implemented by Farmer Organizations, and by strengthening capacity of Farmer Organizations. In the program for Farmer Organizations, various software assistance will be given including diversification of crops, improvement of marketing of rice and other produce, and provision of agricultural credit. The Project components include (1) Strengthening of Farmer Organizations, (2) Agricultural Management Training, and (3) Rectification of Irrigation Systems.

DD, CS

2000-2005

Sri Lanka

Government/JBIC

Walawe Left Bank Irrigation Upgrading and Extension Project (II)

Irrigation Extension Works:
Construction of irrigation and drainage facilities for the Extension Area (5,340 ha) and their related basic social infrastructure on the left bank of the Walawe river, Southern Province.
Dam Rehabilitation Works:
Rehabilitation of the Uda Walawe Dam and its appurtenant structures.

DD, CS

1997-2004

Sri Lanka

Government/JBIC

Greater Colombo Flood Control and Environmental Improvement-Phase I, II & III

Creation of the hygienic environment for people's healthy life and keeping dignity of the city, release people from flooding, and improvement of water quality through improvement of the stormwater drainage system.
Project area: 190 km2 in total

DD, CS (I)
DD, CS (II)
DD, CS (III)

1990-1999
1995-2000
1997-2004

Sri Lanka

Government/JBIC

Transmission and Substation Development Project-II

Construction of Ratnapura 132/33 kV Grid Substation
Construction of Athurugiriya 132/33 kV Grid Substation
Reconductoring of Kelanitissa - Kolonnawa 132 kV T/L
Augmentation of Thulhiriya Grid Substation
Installation of additional equipment for the parallel operation of two existing incoming 132 kV feeders at Chilaw GSS
Installation of static capacitor banks at 2 GSS.

DD, CS

1999-2002

Sri Lanka

Government/IBRD
Government/JBIC

Kukule Ganga Hydropower

T/L: 182 kV/27.2 km, 33 kV/7.5 km
Flow Regulating Structure
Type Run-of-river type with regulating pond
Full supply level (FSL) El.206 m
Minimum operating level El. 204 m
Regulating pond 1.67 MCM
Pond area 0.88 km2
Catchment area 312 km2 at the diversion weir site
Annual inflow 30.4 m3/s
Power Plant
Headrace tunnel 4.8 m dia. x 5,650 m long
Horizontal high pressure tunnel 3.9 m dia. x 60 m long
Tailrace tunnel 4.8 m dia. x 1,600 m long
Powerhouse Underground type
Installed capacity 70 MW (2 x 35 MW)
Annual average energy production 317 GWh

FS, DD
DD, CS

1991-1993
1997-2002

Sri Lanka

JBIC

Lunawa Lake Environment Improvement and Community Development Project

Storm Water Drainage Improvement, consisting of storm water drainage works, Lunawa Lake dredging works, construction of resettlement sites, and the supply of operation and maintenance (O&M) equipment, and Community Development, consisting of resettlement of families and up-grading of under-served settlements for selected settlements in the flood-prone area.
Total studied area: 104 km2

SAPROF

2000-2001

Sri Lanka

Government/JBIC

Samanalawewa Hydroelectric Project, Reservoir Remedial Works, and Wet Blanketing

Rehabilitation of Samanalawewa Hydroelectric Project to achieve storage function as originally planned through wet blanketing limiting the leakage.
Wet blanketing on the reservoir bed
Scheme-1: 250,000 m3
Scheme-2: 250,000 m3
Scheme-3: 500,000 m3
to a permissible level and to lower the groundwater pressure on the right bank below the safe value

CS

1995-2001

Sri Lanka

JICA
Government/JBIC

Walawe Left Bank Irrigation Upgrading and Extension

Detailed Design and Construction Supervision for Old Area (3,940 ha).

DD
CS

1995-1996
1996-2001

Sri Lanka

Government/JBIC
JBIC

Upper Kotmale Hydro Electric Power

Transmission Line: 17.5 km (from the Upper Kotmale Power Station to the existing Kotmale Switchyard), double circuit, 220 kV
Power Plant: Installed capacity; 150 MW (75 MW X 2 units)
Annual energy output: 528 GWh
Dam: Type: Concrete gravity type; Height: 35.5 m; Crest length: 175 m with 5 radical gates (10 m x 10 m)
Powerhouse: Type: Underground; turbine: Francis type, 77,000 kW - 2 units

DD
SAPROF

1993-1995
2001

Sri Lanka

JBIC
Government/JBIC

Baseline Road Improvement and Extension

Rehabilitation and upgrading the existing 8.3 km
Baseline Road between Kelani Tissa Junction and High level Road to a dual 3-lane highway.

SAPROF
DD, CS (I)
CS (II)

1992
1994-2000
2000-2001

Sri Lanka

JETRO

Supplemental Feasibility Study for Construction of Wind Power Plant

Environmental impact assessment and power flow analysis with load flow, fault calculation, dynamic stability analysis for connection to national grid.

FS

2000

Sri Lanka

JICA

Study for the Potential Realization of Irrigated Agriculture in the Dry and Intermediate Zones of Sri Lanka

The objectives of the Study are to conduct a master plan study (Phase I) for the potential realization of irrigated agriculture in the dry and intermediate zones (6,500 km2, 100 scheme) with the goal of achieving more profitable agriculture and higher standards of living for rural farm households through facility rehabilitation, more efficient use of water with participatory management and a feasibility study (Phase II) on selected 6 high priority projects.

MP, FS

1999-2000

Sri Lanka

JICA

Study on Industry and Investment Promotion for Development of Techno-Park in Sri Lanka

Master plan for consolidation of training of IT instructions and establishment of Techno-Park consisting of Smart Center, Electronics Technology Center, Soft-ware/IT Soft Industry Lot, Electronics Industry Lot, and Residential Lot

MP

1999-2000

Sri Lanka

ECFA

Airport Rail Link From Colombo to Katunayake

Study for a 32 km long modernized railway link between Colombo city to Bandaranaike International Airport. The project component include extension and double tracking of the existing line, construction of stations, procurement of rolling stocks, signaling electrification works, and O&M Management.

S

2001

Sri Lanka

JICA

Bandaranaike International Airport Development Project

- Rehabilitation of Taxiway (93,400 m2)
- Strengthening of apron (13,800 m2)
- Apron Expansion (50,000 m2)
- Improvement of Passenger Terminal Building
- Expansion of Cargo Terminal Building- Modernization of Air Navigation System
- Improvement of Public Utilities

DD

1999-2000

Sri Lanka

JBIC
Government/JBIC

Industrial Estates Development

Detailed design, pre-construction service and construction supervision for Seethawaka Industrial Estate (168 ha).
Detailed design for Katana Industrial Estate (59 ha).

SAPROF
DD, CS

1993
1995-2000

Sri Lanka

Government/JBIC

Transmission & Grid Substations Development Project

132 kV lines, 180 km (4 lines)
132/33 kV Grid Substations
2 x 132 kV bay extension 3 nos.
2 x 31.5 MVA augmentation 1 no.
2 x 31.5 MVA new substation 1 no.

DD, CS

1992-1999

Sri Lanka

JICA

Development of Transmission System of the Ceylon Electricity Board

Development of optimum long-term transmission system expansion program for the whole area of Sri Lanka (target year: 2010) and up-grading of in-house transmission planning capacities.

MP

1996-1997

Sri Lanka

JICA

Southern Area Development

Integrated regional development master plan up to year 2015 for promoting regional growth, diversification of the regional economy and expansion of employment-absorptive capacity.
(Study area: 10,500 km2)

MP

1995-1997

Sri Lanka

Government/JBIC

Transmission System Augmentation and Development

Augmentation of existing transmission lines and grid substations and establishment of new communication system operated by Ceylon Electricity Board.
T/L: 132 kV/166 km double circuit, 5 sections
S/S: 132/32 kV, Grid substations: 2x10 MVA, 2 x 15 MVA, 2 x 30 MVA, 5 sites

DD, CS

1990-1997

Sri Lanka

JICA
Government/Grant

Improvement of Walawe Left Bank Area Rural Infrastructure

Improvement works of rural road (31 km), bridge (90 m), water supply facilities (1,000t/day) and related facilities.

BD
DD, CS

1993
1994-1996

Sri Lanka

Private Company

Lanka Tower Construction

34 stories single tower as the apartment for foreign residents near the center of Colombo city.
Site: 6,340 m2

DD, CS

1993-1996

Sri Lanka

Government/JBIC
JBIC

Mahaweli Ganga System C Development

Irrigation: 18,500 ha, Main Canals: 17.4 km,
branch canals: 105 km, drainage canals 620 km

DD, CS, OM
SAPS

1982-1994
1995-1996

Sri Lanka

JICA

Study on General Environmental Condition

Study on general environmental condition based on proper environmental understandings and formulation and charring out Environmental Maintenance Plan.

MP

1995

Sri Lanka

JICA

Agricultural and Rural Development for Up-country Peasantry Rehabilitation

Agricultural and rural development in Central, Uva, and Sabaragamuwa Province, and transfer of technology.
Study area: 18,972 km2

MP

1993-1994

Sri Lanka

JICA

Greater Colombo (Kalu Ganga) Water Supply

Formulation of a plan for the expansion of the Greater Colombo water supply system with an intake from Kalu Ganga to meet the water demand up to the year 2020.

MP, FS

1993-1994

Sri Lanka

Government/JBIC

Samanalawewa Hydroelectric Power Development

Dam: Rock-fill, 100 m high, 530 m long, 4,500,000 m3 volume
Power: 120,000 kW
T/L: 132 kV/17 km

DD, CS

1986-1994

Sri Lanka

JICA

Industrial Sector Development Study

Plan formulation and recommendations for the nation's accelerated industrial development and export promotion through strengthening existing industries, and legal and institutional systems and functions.

MP, Pre-F/S

1992-1993

Sri Lanka

JBIC

Inginimitiya Irrigation Dam

Improvement of water management method and strengthening the agricultural activities command area: 2,550 ha.

SAPS

1992-1993

Sri Lanka

JICA
Government/JBIC

Colombo Katunayake Expressway and New Port Access Road Development

Metropolitan highway development between Katunayake international airport and Colombo port.
Toll expressway: 25.4 km (4 lanes)
Arterial highway: 5.7 km (4 lanes)

FS
DD

1982-1984
1991-1992

Sri Lanka

Government/IBRD

Training Programme Under the Financing Agreement with the World Bank

Provision and arrangements for overseas training for selected staff of MECA to visit, see and study similar irrigation projects in Philippines, Indonesia and Thailand for acquisition of technical knowledge applicable to the Mahaweli Project.

S

1988-1989

Sri Lanka